Halish Railway
Established Member
Northern Powerhouse Rail is in a state of limbo between 'going ahead in full', i.e. a new Leeds to Manchester via Bradford 125mph line and the scaled back Marsden to Manchester Piccadilly route. I know that repeatedly scaling back projects is unpopular, but there are many alternatives to the scaled back new line to Marsden that would deliver significant benefits.
1. Build the Manchester Piccadilly HS2 station as a through station, with tunnels connecting HS2 to the Calder Valley line to serve Bradford (which would need to be electrified) and the Miles Platting to Stalybridge route.
or
2. Build the Manchester Piccadilly HS2 station as a through station and continue on to terminate at an underground Manchester Victoria station to provide an interchange with TPE's Huddersfield line services, Calder Valley line services and HS2 services.
With both of these ideas, the Ordsall chord would be repurposed as a line for local services which would also serve Salford Crescent and Deansgate. Also, I don't think that the Huddersfield line should be used for Birmingham services due to the performance risk they present, as well as the fact that there are interventions that could take place on the existing Birmingham to Yorkshire and North East route that could significantly reduce journey times to be on par with the idea of a Newcastle to Birmingham via Huddersfield service as mentioned in the IRP.
1. Build the Manchester Piccadilly HS2 station as a through station, with tunnels connecting HS2 to the Calder Valley line to serve Bradford (which would need to be electrified) and the Miles Platting to Stalybridge route.
or
2. Build the Manchester Piccadilly HS2 station as a through station and continue on to terminate at an underground Manchester Victoria station to provide an interchange with TPE's Huddersfield line services, Calder Valley line services and HS2 services.
With both of these ideas, the Ordsall chord would be repurposed as a line for local services which would also serve Salford Crescent and Deansgate. Also, I don't think that the Huddersfield line should be used for Birmingham services due to the performance risk they present, as well as the fact that there are interventions that could take place on the existing Birmingham to Yorkshire and North East route that could significantly reduce journey times to be on par with the idea of a Newcastle to Birmingham via Huddersfield service as mentioned in the IRP.