• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Extra carriages on NXEA services

Status
Not open for further replies.

Z12XE

Member
Joined
30 Sep 2005
Messages
876
From the December timetable change the extra 321s from London Midland will be diagrammed into regular service on the GEML, with the resulting changes:

Quoted by NX as being 28,000 extra seats

Trains increased to 12 carriages

05.21 & 08.03 Colchester to Liverpool Street
06.21 Colchester Town to Liverpool Street
06.48 Liverpool Street to Colchester
07.03 Chelmsford to Liverpool Street
07.48 Liverpool Street to Braintree
09.00 Braintree to Liverpool Street
09.18 Liverpool Street to Harwich (12 carriages to Colchester)
15.00 Harwich to Liverpool Street (12 carriages from Colchester)
17.08 Liverpool Street to Clacton-on-Sea, (12 carriages to Colchester)
18.22 Liverpool Street to Clacton-on-Sea, (12 carriages to Witham)
18.32 Liverpool Street to Ipswich
19.15 Witham to Liverpool Street
20.38 Liverpool Street to Harwich International


Trains increased to 8 carriages

08.00 Harwich Town to Liverpool Street, (8 carriages from Colchester)
08.58 Witham to Liverpool Street
17.00 Harwich to Liverpool Street (8 carriages from Colchester)
16.15 Liverpool Street to Harwich Town, (8 carriages to Colchester)
19.08 Liverpool Street to Clacton-on-Sea

Other changes being introduced to provide customers with an improved choice of services include:

08.02 (Mon-Fri) Liverpool Street to Colchester Town will call additionally at Kelvedon
16.30 (Mon-Fri) Ipswich to Colchester re-timed to depart at 16.32 and is extended to run through as an additional service to London Liverpool Street
19.00 (Sundays) Liverpool Street to Norwich will call additionally at Chelmsford, Colchester and Manningtree


The Department for Transport announced in April 2009 a major boost to rail capacity on National Express East Anglia services to and from London Liverpool Street. This will be achieved through the construction of 120 new rail carriages and the transfer of 68 additional modern refurbished carriages to provide a total of 188 extra carriages to be added to East Anglia services. The 120 new carriages will be introduced on Stansted Airport and Cambridge – Liverpool Street services from later in 2011. The 68 refurbished carriages will be introduced on the Great Eastern mainline route through North Essex into Liverpool Street with most improvements expected to be introduced from December 2010.

BBC Look East also reported that the improvements in 2010 will include more carriages on Naarich services. No doubt an expected outcome of the recent 'consultation'

Full NX Press Release
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,842
Location
East Anglia
Good to see the 19.08 Liv St to Clacton gets an extra 4-cars. This train & it's predesesor until 2005 the 19.02 have always been absolutley rammed as a single 321/360 but unfortunatley until now there has never been anything after the peak to strengthen this service.
 
Status
Not open for further replies.

Top