In recent decades there have been a significant number of stations which have seen their capacity expanded. However, unlike new stations, there doesn't appear to be any publicly available list, comprehensive or otherwise, of existing stations which have been expanded. So I thought I would make a start:

Station NameCurrent platformsPrevious platformsUpgrade date
Bradford Forster Square432025
Bristol Parkway432018
Bristol Parkway322007
Bromsgrove422016
Cambridge862011
Doncaster982016
Leeds18172021
Leeds17122002
London Bridge1515*2018
London Kings Cross1111*2010
London Marylebone642006
London St Pancras154?2007
Peterborough752013
Reading15122014
Stevenage542020

* - new platforms built which increased capacity, but no overall change in number of platforms.

What other capacity upgrades and rebuilds have there been in recent decades?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Djgr

Established Member
Joined
30 Jul 2018
Messages
3,256
Liverpool Lime Street (main line) 9 to 10 2018?
 

43010

Member
Joined
16 Mar 2023
Messages
33
Location
Crediton
Newquay: 1 to 2, 2025

St James Park (Exeter) and Eggesford had both of their platforms extended in 2020 and 2021, respectively
 

steamybrian

Established Member
Joined
26 Nov 2010
Messages
1,996
Location
Kent
Ashford International 4 to 6
Gatwick Airport 6 to 7
Gravesend 2 to 3
Marylebone 4 to 6?
Oxford 3 to 4?
Princes Risborough 2 to 4
Rainham (Kent) 2 to 3
Redhill 3 to 4
Stratford (London) has increased but number unknown
Swindon 3 to 4
 
Last edited:

W-on-Sea

Established Member
Joined
18 Dec 2009
Messages
1,447
Charlbury, Ascott-under-Wychwood and possibly others on the North Cotswolds line 1>2 circa 2012.

Stratford (London). I think the new 1 and 2 for the Overground are the only brand new platforms on the NR side, but there are other platforms that were previously used much less regularly than is now the case (any or all of 9, 10,10a, 11, 12) or that were temporarily closed during reconstruction (e.g. the former low level 1 and 2 that now serve the DLR line to West Ham and beyond)

3a was added to the Central line I think for the Olympics, and the DLR moved from the bay platform 4 to the new and separate 4a and 4b sometime earlier.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
Tottenham Hale
Northumberland Park
Angel Road / Meridian Water
Shenfield
Beccles
Abbey Wood
Doncaster
Darlington*
Dunbar
Gatwick
Wellingboro’
Kettering
Tring
Bletchley*
Milton Keynes
Rugby
Nuneaton
Wolverhampton
Stockport
Salford Cresecent*
Roby
Huyton
Kirkham & Wesham
Waterloo
Clapham Jn
Redhill
Oxford
Bham Moor St
Finsbury Park
Ally Pally
Swindon
Haddenham & Thame
Bicester North
Princes Risboro’
Edinburgh Waverley
Glasgow Central
Newport (Wales)


*yet to see passenger services

I’m sure there’s lots more.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,296
Location
The Fens
London Kings Cross went up from 11 to 12 when platform 0 opened, then back down to 11 again in 2021(?).

Finsbury Park is complicated depending on how you count. In terms of platform numbering it has gone up from 6 to 8 but in terms of tracks with platforms from 5 to 6. The old platform 4/5 had platforms on both sides of the same track, and this is now platforms 6/7. The old platform 1 now has platforms on both sides numbered 2/3.

Old St Pancras had 7 platforms.

Old Blackfriars had 5 platforms but new Blackfriars only has 4.
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
Bristol Temple Meads reopened Platform 15 when Bath Road Depot closed I think?

Always thought reopening P2 as Terminus for Portishead branch would be good but think needs track rework
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,492
Location
Moorpark, CA
Airdrie, Drumgelloch, Livingston North and Uphall all gained platforms when the line was redoubled. Haymarket Platform 0? Forres?
 
Last edited:

John R

Established Member
Joined
1 Jul 2013
Messages
6,059
Lots in South Wales.
Cardiff Queen St 3 to 4 to 5
Pontypridd 1 to 3.
Many other valley line stations have had additional platforms over the last few years, some reinstatements of rationalisations in the 70s and 80s.
Bridgend 2 to 4
Cardiff Central 6 to 8.
Newport 2 to 4.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,151
Location
Wilmslow
Manchester Piccadilly - Plat. 12 reinstated.

Taunton - central island platforms reinstated.

Happened during the Railtrack era - can't remember exact dates.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,059
Newport was previously 3
My recollection from the late 70s is that Platform 1 was not used for passenger traffic, which is what I was thinking of, but you are right that there has always been a platform there.
 

rf_ioliver

Member
Joined
17 Apr 2011
Messages
1,024
Add Filton Abbey Wood - from 0 to2, then 3 then 4 (don’t have the dates)
Got me thinking as I remember them building the station. Filton Juncton closed Sept '96, and Filton Abbey Wood with 2 platforms opened 1996, I guess September. A third platform was added in 2004 and a fourth in 2018
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
Add Filton Abbey Wood - from 0 to2, then 3 then 4 (don’t have the dates)
The original Pts 1 (UP) & 2 (DN) opened 11/03/1996.
Pt 3 (UP) opened 28/08/2004 and pts 1 & 2 swapped their numbers so 1 became 2 and 2 became 1 on the same date, this was so that the numbering was in a sensible order, if the numbers had not been altered it would have been from east to west: 2 (DN), 1 (UP), 3 (UP).
Pt 4 (UP) opened and Pt 3 became a DN pt on 19/11/2018.
 

Brightonboy

Member
Joined
20 Jan 2025
Messages
125
Location
Suffolk
A lot of these seem to me to be reinstatements of previously reduced capacity rather than actual new capacity. What is ratio of reinstatements to new build - does anyone know?
 

drb61

Member
Joined
24 Oct 2020
Messages
82
Location
Cambuslang
Glasgow Central went from 15 to 17 (sometime around 2013 or 2014 I think) when the former car park was removed to make space for two additional platforms (now 12 and 13). Originally part of the ill-fated Glasgow Airport Rail link plan, but provided extra capacity for additional services to Ayrshire.
 

Parallel

Established Member
Joined
9 Dec 2013
Messages
4,505
Swindon had platform 4 added in 2003.

Dinas Rhondda had a second platform added (or reinstated) in 2024.

Ynyswen had a second platform added in 2025.

Dovey Junction was remodelled at some point with a single platform style passing loop, allowing hourly services.

Penryn on the Falmouth branch received similar treatment, allowing half-hourly services along the branch.

I recall Welshpool had some enhancement work done, bringing a second platform into use, to allow for hourly services along the line.
 
Last edited:

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,830
A lot of these seem to me to be reinstatements of previously reduced capacity rather than actual new capacity. What is ratio of reinstatements to new build - does anyone know?
Good point. The Leeds station expansions in 2002 and 2021 built platforms on an old part of the station that had been rationalised to reduce capacity back in 1967. But I'm mostly concerned with looking at where we've seen increased station capacity since the railways started growing again in the 1980s/90s.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
In recent years both London Liverpool Street and London Paddington have both lost one high level platform each but gained two low level Crossrail platforms.

• London Liverpool Street - It went from 18 to 17 platforms when it lost P18 in 2021. This was done to provide space to extend and widen P16 and P17. But then in 2022 it gained PA and PB giving an overall gain of one platform as it now has 19 platforms.

• London Paddington - It went from 14 to 13 platforms. when it lost P13 in 2016. This was done to provide space to extend and widen P12 and P14. But then in 2022 it gained PA and PB giving an overall gain of one platform as it now has 15 platforms.

So both of these stations have overall gained one platform each which i think counts.

• Farringdon - It went from 2 to 4 national rail platforms (or 4 to 6 if you include tube platforms) in 2022 when the Elizabeth Line opened and PA and PB were built for them.

• Gatwick Airport - It went from 6 to 7 platforms in 2014 when the new P7 and new track was opened.

• London Waterloo - It went back from 19 to 24 platforms in 2019 with the five platforms having been closed since 2007 when Eurostar ceased.

There are probably dozens and dozens of other stations all over the country that have had extra platforms built.
 

Bodiam

Member
Joined
8 Jul 2025
Messages
105
Location
Kent, UK
Whitby had the second platform brought back into use when NYMR services began to run through.
Dartford went from 3 to 4 platforms - I think in connection with the resignalling 50+ years ago.
Ashford increased from 4 platforms to 6 but 2 were exclusively for Eurostar trains and are currently not used
 
Status