zwk500
Veteran Member
Haha good spot!or even Temple Mills![]()
Haha good spot!or even Temple Mills![]()
Clearly Eurostar are using every trick in the book to try and keep exclusive use of Temple Mills, even stating some stock that is currently maintained in France will need to use it.
They will of course also be aware of the new private TGV servicing depot recently announced just south of Bordeaux for Proxima new Velvet fleet. Suggests French are softening their approach to depot ownership (which historically was very protectionist).
Whilst lack of land near St Pancras helps protect their position, it would be relatively easy to build a servicing depot further out, nearer Dagenham, Ebbsfleet or alongside A2 etc.
The European Law changes to promote open access will have forced SNCF's hand to some extent as well.Oh, I think in general Fremch opposition to competition has softened quite a bit, as can be seen from the relative ease with which Trenitalia is getting paths on the most congested LGV. SNCF might have overplayed its hand, and E* might well do the same.
The European Law changes to promote open access will have forced SNCF's hand to some extent as well.
Eurostar has insisted its new double-decker trains will run on London routes from 2031, and that it will order a total of 50.
The new Celestia fleet will be built in France and stabled at depots in London, Paris and Brussels, but heavy maintenance will be carried out at Temple Mills International Depot.
“The first commercial services will run on London-Paris and London-Brussels from 2031, with new destinations such as Frankfurt and Geneva planned for the mid-2030s,” the spokesperson added.
[...]
Each 200-metre-long train will carry 540 passengers, and Eurostar has said some will work in pairs through the Channel Tunnel, leaving the option to split them mid-journey to reach different final destinations.
jonworth.eu
The 373s are the oldest stock Eurostar has, so those being the first to be replaced is believable.![]()
Eurostar insists double-decker trains will run to London and clarifies order
Eurostar explains more of its plans for the Alstom-built trains.www.railmagazine.com
Eurostar is insisting that the double deckers will run to London, with the first routes planned to be London-Paris and London-Brussels. Heavy maintenance is apparently planned for Temple Mills, and there is potential for splitting and joining en route. I'm going to take a punt on Eurostar doing services to Switzerland that split en route to serve Geneva and Zurich while only using one HS1/Chunnel path.
He does make some good points, and the fact that the initial order is for only 30 trains, rather than the 42 that would be needed to replace the PBAs, PBKAs, and 373s is odd.More interesting analysis from Jon Worth.
![]()
Working out what Eurostar is going to do - based on the numbers, not what the company says
If you take what Eurostar has said in its press release, Alstom has said in its press release, and what has appeared in the FT and The Guardian among others yesterday, you end up with the impression that these Avelia Horizon double deck trains Eurostar is to order from Alstomjonworth.eu
I hope not.Do we think that they could extend the life of the 373s for another decade or longer?
I actually prefer them. They've got more character than the e320s, plus I think the seats are comfier.I hope not.
You really do feel like you're on a wing and a prayer everytime you're on one!
I actually prefer them. They've got more character than the e320s, plus I think the seats are comfier.
I get you.I actually prefer them. They've got more character than the e320s, plus I think the seats are comfier.
373 seats are narrower, but have more padding. Quite unpleasant in second class due to being cramped, but in first class it's the nicest way out of the UK!Aren't they the same seats since the refurb?
Metaphorically speaking you'd be milking a dry cow trying to get another ten years out of the old fleet. Running at 300km/h everyday is enough to wear out any train over 30 years, never mind one that also has to contend with the salty sea air of the Channel Tunnel and it's subsequent corrosion when it's not running at those great speeds. They were revolutionary trains for their time, and I'd absolutely support preservation of at least one or two sets, but they are most definitely reaching the end of their days in commercial service.Do we think that they could extend the life of the 373s for another decade or longer?
Frankfurt mid 2030’s is ten years away. Very disappointing any chance any other operator will beat this time frame?![]()
Eurostar insists double-decker trains will run to London and clarifies order
Eurostar explains more of its plans for the Alstom-built trains.www.railmagazine.com
Eurostar is insisting that the double deckers will run to London, with the first routes planned to be London-Paris and London-Brussels. Heavy maintenance is apparently planned for Temple Mills, and there is potential for splitting and joining en route. I'm going to take a punt on Eurostar doing services to Switzerland that split en route to serve Geneva and Zurich while only using one HS1/Chunnel path.
Depends on the ORR decision about Temple Mills, see further discussion in the speculative threadFrankfurt mid 2030’s is ten years away. Very disappointing any chance any other operator will beat this time frame?
I thought about this one a bit more. It's definitely a very interesting analysis.More interesting analysis from Jon Worth.
![]()
Working out what Eurostar is going to do - based on the numbers, not what the company says
If you take what Eurostar has said in its press release, Alstom has said in its press release, and what has appeared in the FT and The Guardian among others yesterday, you end up with the impression that these Avelia Horizon double deck trains Eurostar is to order from Alstomjonworth.eu
I tend to agree, the PBKA are likely to be last to leave.I thought about this one a bit more. It's definitely a very interesting analysis.
I agree with Jon Worth that the initial 30 are to replace either PBA+PBKA or PBA+e300, with the options to replace whichever one of those three older fleets isn't replaced by the original order.
However, I think the signs point towards the plan being to replace the PBA+e300 fleets first, for these reasons:
- The PBA and e300 fleets are the oldest Eurostar has
- The PBKA has recently been refurbished (Ruby refurbishment), so could last quite a bit longer.
- It doesn't make sense to refurbish and then quickly bin a fleet
I respect Jon Worth's opinions, but here I also disagree with him and think the most likely intention is for Eurostar to replace the PBA and e300s first based on the Ruby refurbishment. There will be just enough trains in the original order of thirty to replace both of them with five left over for potential expansion into Germany and Switzerland. Certainly enough to fill any extra space in Temple Mills and block competition.I thought about this one a bit more. It's definitely a very interesting analysis.
I agree with Jon Worth that the initial 30 are to replace either PBA+PBKA or PBA+e300, with the options to replace whichever one of those three older fleets isn't replaced by the original order.
However, I think the signs point towards the plan being to replace the PBA+e300 fleets first, for these reasons:
- The PBA and e300 fleets are the oldest Eurostar has
- The PBKA has recently been refurbished (Ruby refurbishment), so could last quite a bit longer.
- It doesn't make sense to refurbish and then quickly bin a fleet
- The ORR will have expected detailed plans, so use of the fleet to London must at the very least be possible*
In this situation, the reason for having the PBKA replacement as options rather than part of the firm order is so that Eurostar has an out if, for whatever reason, the Celestia units are either not up to standard, or massively delayed. Basically, it gives them some extra leverage over Alstom until the decision on the PBKA units has to be taken.
*This is relevant, because I think Jon Worth has attached too much importance to the idea that these new trains may not get Channel tunnel certification (soon enough), which steers him towards the PBA+PBKA replacement instead of the PBA+e300 replacement.
I respect Jon Worth's opinions, but here I also disagree with him and think the most likely intention is for Eurostar to replace the PBA and e300s first based on the Ruby refurbishment. There will be just enough trains in the original order of thirty to replace both of them with five left over for potential expansion into Germany and Switzerland. Certainly enough to fill any extra space in Temple Mills and block competition.
Not to mention the extortionate track access fees for HS1.And if they're going to be maintained at Temple Mills (regardless of the motivation for that) you're going to need to run them on UK services at least some of the time otherwise you'll be paying for costly Tunnel paths for ECS runs, which is throwing money in the bin. See also the way you get 168s on Aylesbury Vale services on Chiltern at the extremes of the day because they're being run down to Marylebone to enter/exit service on the mainline rather than wasting paths sending them ECS.
Can we assume that these new trains will have an interior that at least matches the Ruby refurbishment regarding comfort, design etc? It’s a distinct improvement on the e320s.
I'd personally go with option 2 - Replace the 373s (E300s) and ex-Thalys PBAs.More interesting analysis from Jon Worth.
![]()
Working out what Eurostar is going to do - based on the numbers, not what the company says
If you take what Eurostar has said in its press release, Alstom has said in its press release, and what has appeared in the FT and The Guardian among others yesterday, you end up with the impression that these Avelia Horizon double deck trains Eurostar is to order from Alstomjonworth.eu
That seems like a great strategy to give market share away to competitors, both already existing and future. Eurostar has repeatedly stated they intend to grow passenger numbers, and recent actions, like increasing the frequency on London-Amsterdam from 3 tpd this spring to 5 tpd from December*, support their stated intention. Remember Eurostar faces direct competition on most routes already:Lots of the comments here assume that Eurostar wants to add capacity to grow passenger numbers. SNCF’s recent strategy has been the opposite, reduce services, pack remaining ones, raise prices. It’s entirely possible Eurostars strategy will be the same.
That seems like a great strategy to give market share away to competitors, both already existing and future.
DB’s ICE1 fleet says hello… currently 34 years old and going through a second heavy refurbishment for continued use.Metaphorically speaking you'd be milking a dry cow trying to get another ten years out of the old fleet. Running at 300km/h everyday is enough to wear out any train over 30 years, never mind one that also has to contend with the salty sea air of the Channel Tunnel and it's subsequent corrosion when it's not running at those great speeds. They were revolutionary trains for their time, and I'd absolutely support preservation of at least one or two sets, but they are most definitely reaching the end of their days in commercial service.