Local radio in Cornwall. Obviously cant post a link to a radio broadcast....
The bloke they were talking with said he was from Rail Future whoever they are
Really, you having that much bad weather down there in the west?
D.
Local radio in Cornwall. Obviously cant post a link to a radio broadcast....
The bloke they were talking with said he was from Rail Future whoever they are
Really, you having that much bad weather down there in the west?
D.
London is in meltdown today. Severe delays on services from Euston and Paddington, King's Cross closed and services diverted from there to Finsbury Park has led to the closure of that station as well.
London is in meltdown today. Severe delays on services from Euston and Paddington, King's Cross closed and services diverted from there to Finsbury Park has led to the closure of that station as well.
There was a lengthy interview with the top bod of Network Rail, shown on BBC News a couple of hours ago, and the weather wasn't mentioned once as a relevant factor. In fact no reason for the overrun was given, unless I missed it somehow.
the sack for what in this case. sometimes rail works over run. yes its inconvenient, but thats life.Into the Compensation chest. Take it from the bosses not from the Company itself. Of course, as in any public service industry, nobody at the top ever gets the sack.
the sack for what in this case. sometimes rail works over run. yes its inconvenient, but thats life.
I was referring to all "public" bodies in general.
i do love posts like this! :roll:
Why and who should they give it to? Should they just stand out side the station and give you a fiver or would you prefer a cheque?
Live interview with NR top honcho 17.15 today P.M. programme Radio 4: he gave the reasons as
a) Paddington- problems with signalling rewiring this (early) a.m. which required safety checks that have spiralled on;
b) Kings Cross- problems with 'faulty equipment' on both Dec 25th and 26th so that he was aware yesterday afternoon that things would not be back to normal this morning and consequently contingency plans were being made yesterday by NR in association with East Coast and local operators, including TfL whom he went out of his way to praise.
It is inconceivable that contingency plans were drawn up during the incident. Surely they would have been drawn up as part of the planning for the works? Looks like a complete lack of any planning from anyone. Total shambles. Very amateurish.
There are only so many 'plans' that you could come up with, and as sure as eggs is eggs, none of them would meet what was wanted! I think there was plans 'just in case' but none of them met the issuues that were presented!
Maybe the Christmas shutdown should be longer, and not done in 48 hours, shut down from 2359 on the 24th to 0600 on the 30th maybe ? scope for recovery, and hopefully nothing for the 'experts' to whinge about !![]()
This perfectly mirrors the BBC news reports yesterday on their Web Site. Kings Cross had a BBC reporter commenting and more details about the issues, including a very brief mention of Paddington near the beginning, with a link to the Paddington news report.There are now 10 pages re the Kings Cross fiasco but not even a post on the fact that Paddington is completely stitched up as well and no trains can run between Paddington and Hayes and Harlington. Fortunately, the effects are not as bad as Kings Cross as the current estimate to have things moving is 13 30.
A poster did mention it in passing on the KX thread.
Network Rail bosses should be handing a chunk of their own salary back, never mind forfeit their bonus.
This perfectly mirrors the BBC news reports yesterday on their Web Site. Kings Cross had a BBC reporter commenting and more details about the issues, including a very brief mention of Paddington near the beginning, with a link to the Paddington news report.
Where as Paddington had less details; no BBC reporter present and no mention of or link to the Kings Cross news report. I can only assume more people use the East Coast line so there's more interest in it.
And maybe because someone was organised enough to ensure the secondary route had 8/12 car trains rather than the 4 car trains that GN was running according to a poster on the ECML thread.
Looks like a Heathrow Express has hit a track trolley left behind by Network Rail.
http://twitter.com/JaniLDN/status/549171140938452992/photo/1
If I heard Duncan Barks on LBC correctly just now then yes. I believe he quoted a minister or someone else high up in relation to Kings Cross saying the person who made a mistake should be sacked. Whilst that's Kings Cross, I think a number of people who think the same here.People are happier to see someone sacked rather than something proper done to avoid it again in the future.
How about Victoria; Waterloo; Liverpool Street; Marylebone and Fenchurch Street? What about Canon Street?@trainophile - In terms of London terminal closures and issues there is London Bridge, which is completely closed of course to all Southern services (planned) and the southeastern side had a large number of alterations and cancellations this morning between London Bridge and Charing Cross due to point problems. What London terminals have been running ok?!
This morning the hourly Heathrow Connects were not running (messages about being stuck in depot) but even so Paddington was dead (a bit like Euston late at night waiting for the sleeper). FGW even linked together 3 turbos to make a 8 car turbo for a Reading stopper (10:15 service).
Thats weird, many of the platforms can't fit more than 6 cars of Turbo. At Southall I'd be surprised if the 6th car fits on the fast line platforms. For much of the day, only the Fast lines were in use from Ealing Broadway to Slough (as far as I'm aware). Heathrow Connect cancelled all day.
1015 service: http://www.realtimetrains.co.uk/train/C22954/2014/12/28/advanced
Thats weird, many of the platforms can't fit more than 6 cars of Turbo. At Southall I'd be surprised if the 6th car fits on the fast line platforms. For much of the day, only the Fast lines were in use from Ealing Broadway to Slough (as far as I'm aware). Heathrow Connect cancelled all day.
1015 service: http://www.realtimetrains.co.uk/train/C22954/2014/12/28/advanced
Do their Turbos currently have any sort of SDO installed?