• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Engineering Overrun Paddington (27/12/14)

Status
Not open for further replies.

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
Not really, although a hailstorm caused a crash and subsequent closure of the A30 this morning at Camborne.

Do you mean somebody was driving too fast for the prevailing conditions and crashed, meaning its their fault!
Or did a hailstone get inside the car and pull the steering wheel causing the crash?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

crewmeal

Member
Joined
1 Dec 2007
Messages
462
Location
Birmingham
People are happier to see someone sacked rather than something proper done to avoid it again in the future.

That someone needs the skills he/she has to organise closures properly so the work is carried out effectively and efficiently. Not a 2 day 'job done' attitude then over run and screwing up the timetable.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,452
Given that there is to be an inquiry into Kings Cross, will there be one on Paddington? Are these things routinely held after works anyway? In IT projects I've worked on there has often been a lessons learnt review afterwards.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,602
What exactly is going on between Reading and Paddington?
There seems to have been an awful lot of disruption this year. Is it dodgy / old signalling that needs to be replaced at some point or just a combination of different things?
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,689
Location
Scotland
What exactly is going on between Reading and Paddington?
There seems to have been an awful lot of disruption this year. Is it dodgy / old signalling that needs to be replaced at some point or just a combination of different things?
There's a lot of preparatory work for Crossrail.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906

Monty

Established Member
Joined
12 Jun 2012
Messages
2,370
Sounds like an accident that could of been avoided if the engineers were not put under immense pressure to complete the work in such a short space of time, handing back the possessions and reopening lines. It will be interesting to see what the RAIB make of this.
 
Last edited:
Joined
19 May 2010
Messages
514
Location
West Drayton
Anyone know why the 20:15 Paddington to Reading stopper was only 2 cars last night? 20:12 Heathrow Connect before it had been cancelled so it was absolutely rammed and left people behind at Ealing Broadway.

It's not uncommon for the stopper to be only 2 cars. Just bad luck that the cancelled Connect compounded the problem.
 
Status
Not open for further replies.

Top