There are now 10 pages re the Kings Cross fiasco but not even a post on the fact that Paddington is completely stitched up as well and no trains can run between Paddington and Hayes and Harlington. Fortunately, the effects are not as bad as Kings Cross as the current estimate to have things moving is 13 30.
A poster did mention it in passing on the KX thread.
Network Rail bosses should be handing a chunk of their own salary back, never mind forfeit their bonus.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rich McLean

Established Member
Joined
6 Feb 2012
Messages
1,757
All IC services currently being terminated and Re-started at Reading. Suttles between Reading and Hayes, with passengers crammed onto Waterloo stoppers
 

TheLastMinute

Member
Joined
30 Dec 2008
Messages
189
Location
Weston-super-Mare
Ticket acceptance arranged:
* Chiltern will accept FGW tickets between London Marylebone and High Wycombe, Bicester North & Banbury.
* SWT will convey FGW passengers between Waterloo and Reading / Windsor, also between Waterloo and Exeter St Davids.
* CrossCountry will convey FGW ticket holders on services west of Bristol.

Also today's tickets will be valid tomorrow.
 

Rich McLean

Established Member
Joined
6 Feb 2012
Messages
1,757
Someone also said on the KGX thread that Euston is out of action. Is that right? The whole capital must be at a standstill if so.

South WCML is shut. Shuttles running from Birmingham International and Euston via the Chilterns in both directions
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,682
Location
Scotland
Someone also said on the KGX thread that Euston is out of action. Is that right? The whole capital must be at a standstill if so.
I don't think it's closed, but the WCML has major engineering work as well - though I believe that was scheduled to last the entire weekend.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,916
Location
Fenny Stratford
Network Rail bosses should be handing a chunk of their own salary back, never mind forfeit their bonus.

i do love posts like this! :roll:

Why and who should they give it to? Should they just stand out side the station and give you a fiver or would you prefer a cheque?
 

ushawk

Established Member
Joined
5 Nov 2010
Messages
1,965
Location
Eastbourne
Still surprised that they schedule two of the major London terminals to be not working to full capacity at the same time. I suppose the theory is that no-one goes anywhere at Christmas... hah :| .

Issues at Kings Cross arent planned you know......
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,916
Location
Fenny Stratford
Still surprised that they schedule two of the major London terminals to be not working to full capacity at the same time. I suppose the theory is that no-one goes anywhere at Christmas... hah :| .

no, the theory, as you well know, is that less people go less places over Christmas. That doesn’t lessen the inconvenience for those people but it does lessen the inconvenience for people generally.

So, if not xmas or easter when shall the work be done? Have you thought that the need to appease the self important and cram more work into a short window is part of the problem?
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,097
Location
Redcar
Issues at Kings Cross arent planned you know......

But a reduction in capacity was. That this has now spiralled into a total closure, as you say, wasn't planned. But shouldn't we be talking about Kings Cross on the other thread ;)
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
i do love posts like this! :roll:

Why and who should they give it to? Should they just stand out side the station and give you a fiver or would you prefer a cheque?

Into the Compensation chest. Take it from the bosses not from the Company itself. Of course, as in any public service industry, nobody at the top ever gets the sack.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,916
Location
Fenny Stratford
Into the Compensation chest. Take it from the bosses not from the Company itself. Of course, as in any public service industry, nobody at the top ever gets the sack.

of course :roll:

Which industry do you work in? Are any directors in your industry personally liable for paying their own money to customers in the event of poor performance?
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
I don't. Retired. However, they should be aware of what is going on and bear some responsibility when things go wrong. No point in continuing the argument so let us concentrate on the thread now.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,916
Location
Fenny Stratford
I don't. Retired. However, they should be aware of what is going on and bear some responsibility when things go wrong. No point in continuing the argument so let us concentrate on the thread now.

i think they will be aware of the problem. A call from the Secretary of State for Transport wanting answers followed by every journalist in the UK will crystalise the mind i would assume.

May we agree that finding out what went wrong and why and then stopping it happenign again is the most important thing after getting people moving?
 
Last edited:

VisualAcid

Member
Joined
17 Oct 2013
Messages
142
It's been a terrible year for the GWML and Network Rail, although it would take someone with expertise to explain whether this was someone's fault technically or just unrealistic expectations.
 

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,527
At least one Great Malvern terminator has been cut to run Paddington to Shrub Hill according to informed sources
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Would be interesting to know where exactly NR are actually working between Paddington and Hayes especuially as Virgin are using part of the GWML to reach Chiltern lines.

If the route to Hayes is open from Acton then its a shame FGW don't sign the route to Euston.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
An odd train getting through with delay. The 13 30 estimate for normal working has now slipped to 18 30
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,992
Location
here to eternity
An odd train getting through with delay. The 13 30 estimate for normal working has now slipped to 18 30

They may as well throw in the towel for the rest of today given the number of trains and train crew that are now out of position. I'm sure it was the same on the 27th last year as well when the works overran in the Paddington area.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
According to the BBC:
Passengers have been diverted via Reading or onto the Underground via Ealing Broadway due to cancellations.

Once a passenger is diverted via Reading, where would they end up I wonder? Reading has so many destination, not all of which are Paddington. What about passengers coming from London? I guess they could be diverted onto Ealing Broadway via the underground. Waterloo is quite handy in these cases of course.

The full report is here:
http://www.bbc.co.uk/news/uk-wales-30611505
 

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
I bet the Waterloo - Exeter and Waterloo - Bristol services are well used today.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,919
Location
Mold, Clwyd
Would be interesting to know where exactly NR are actually working between Paddington and Hayes especuially as Virgin are using part of the GWML to reach Chiltern lines.
If the route to Hayes is open from Acton then its a shame FGW don't sign the route to Euston.

It's VERY fortunate that Acton Wells-Ealing Broadway-Greenford is OK so that the hourly VT Voyager diversions seem to be running pretty much on time today.
We must have come close to 3 main lines being shut simultaneously on the same day.
 

SF-02

Member
Joined
26 Oct 2008
Messages
477
@trainophile - In terms of London terminal closures and issues there is London Bridge, which is completely closed of course to all Southern services (planned) and the southeastern side had a large number of alterations and cancellations this morning between London Bridge and Charing Cross due to point problems. What London terminals have been running ok?!
 
Last edited:

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
i do love posts like this! :roll:

Why and who should they give it to? Should they just stand out side the station and give you a fiver or would you prefer a cheque?

Bank credit would more convenient. I accept that all change activity comes with risk, but there needs to be accountability and leadership when things go awry.
 

richw

Veteran Member
Joined
10 Jun 2010
Messages
11,528
Location
Liskeard
Into the Compensation chest. Take it from the bosses not from the Company itself. Of course, as in any public service industry, nobody at the top ever gets the sack.

I don't. Retired. However, they should be aware of what is going on and bear some responsibility when things go wrong. No point in continuing the argument so let us concentrate on the thread now.

Because the bosses are responsible for the extreme weather conditions?

Why not bill the Met Office for making the weather bad?

The late running engineering is due to the bad weather. I think the weather warnings were only given 2-3 days ago. Hardly the fault of network rail.
 