Amos390
Member
Think it’s Heavy Haul, not 100% thoughFreighliner or Heavy Haul? They are two different entities.
Think it’s Heavy Haul, not 100% thoughFreighliner or Heavy Haul? They are two different entities.
017/103 and 810012 currently (007/015 returned to Derby)Do we know roughly how many 222s/810s are stuck
Or even just run a sole 222 operated service and try and bin the very unreliable 810s for a week- pretty much every day an 810 fails in service, give them some time to sort them out.
Seems reliability has sunk to a new low, with only 11 222s in service as I type (it should be 17). There are also only 4 810s in service at the moment too, resulting in many cancellations, especially on the Nottingham route.
They certainly used to make use of Central Rivers. Not sure when that stopped but I believe it's when Hitachi took over the maintenance, so it's definitely been a few yearsCould EMR arrange to send 222's down to Central Rivers for maintenance and repair since it's only a few miles away?
It seems like EMR have got themselves into a position that was entirely predictable yet almost totally avoidable...
They certainly used to make use of Central Rivers. Not sure when that stopped but I believe it's when Hitachi took over the maintenance, so it's definitely been a few years
Looked absolutely dreadful - I sometimes have a look at STP departures to get a feel about how it's all going. The Nottingham route was carnage as you implied with 6/10 cancelled between 1pm and 6pm. Then there was a nearly-90 minute gap with no IC departures at all between the 1805 and the 1905 (which left around 30 mins late). Nothing to suggest this was anything other than train availability.Seems reliability has sunk to a new low, with only 11 222s in service as I type (it should be 17). There are also only 4 810s in service at the moment too, resulting in many cancellations, especially on the Nottingham route.
Usually problems with doors - the latest delivery (810022) has apparently had mods, and it hasn't failed yet, so hopefully things will get better. There are currently 6/6 810 diagrams covered today, and 14/17 222 diagrams, which is certainly better than yesterday.Does anyone know why exactly the 810s are so unreliable? No other 80x has had this many issues - yes, the 805s continue to suffer running without all the engines on, but they don't get pulled from service every other day or whatever.
You might get a bit more joy if you post that in the 810 thread, there's a number of comments from people with varying degrees of information. The doors do seem to be the biggest troublespot at the moment.Does anyone know why exactly the 810s are so unreliable? No other 80x has had this many issues - yes, the 805s continue to suffer running without all the engines on, but they don't get pulled from service every other day or whatever.
I’m on the train which ‘rescued’ pax from the cancelled 17:40 ex Sheffield to St Pancras service. Formed of 222101.This afternoon's 1F50 (810222) had issues between Derby and Chesterfield and ended up terminating at Chesterfield 41 late.
When Bombardier operated the depot at Etches Park, they would send unit down to Central Rivers. Now Etches Park is Hitachi, they would not send them to Central Rivers.Could EMR arrange to send 222's down to Central Rivers for maintenance and repair since it's only a few miles away?
It seems like EMR have got themselves into a position that was entirely predictable yet almost totally avoidable...
Next six trains from Leicester southbound are cancelled, let alone the next three from Nottingham. I think the stock for the 2050 from Nottingham to St Pancras (222019) has just arrived in Nottingham, but guess the delay could be staff displacement.It’s now looking like the next four trains from Nottingham to St. Pancras have been cancelled with only one train still running this evening at 2125.
When I head north on football trips if your choosey there's always mml trains with dirt cheap advances even at the last minute, generally from first thing until just before 3. Unless there's been disruption it's unusual for one of these trains to be more than 25 to 50% full leaving London mon to Fri. in my experience.Friday peak commuter trains are much quieter.
The departure screen from Leicester shows multiple cancellations, including the next six services to London St. Pancras.
When Bombardier operated the depot at Etches Park, they would send unit down to Central Rivers. Now Etches Park is Hitachi, they would not send them to Central Rivers.
I do wonder if they are on a performance related contract.. Penalties of not enough trains for service.I know, but this is why companies subcontract work.
If you can't or don't have the capacity to do the work yourself, you pay someone else to do it.
Indeed, an emergency timetable might give a chance to catch up on maintenance. It's been another bad day today, with 222006/222013/222103 (and 810022) all failing.Really poor show. I'm so glad I don't travel to Kettering weekly now. Something needs to be done about the poor performance. Maybe even an emergency timetable?
Next week sees another heatwave so things will only potentially get worse.....