Darren R
Established Member
Just seen this on NRE:
Route affected
Routes to and from London Waterloo
Train operator affected
South West Trains;
Description
A rail defect has been identified between London Waterloo and Vauxhall.
Because of this, emergency engineering work has been organised to take place on Sunday 21 April until approximately 16:00. Platforms 1-10 will be out of use meaning only a very limited train service will be able to operate to and from London Waterloo during this time.
http://www.nationalrail.co.uk/service_disruptions/today.aspx
Does anybody know what the problem is? The closure of platforms 1 - 10 would indicate all four of the Main Lines are closed, and Realtime Trains seems to confirm this, showing trains as using the Windsor Lines between Queenstown Road Battersea and Waterloo. Just wondered what the position of the track defect is that would lead to closure of four adjacent tracks.
Isn't it the London Marathon on Sunday too? That could lead to some fun and games!
Route affected
Routes to and from London Waterloo
Train operator affected
South West Trains;
Description
A rail defect has been identified between London Waterloo and Vauxhall.
Because of this, emergency engineering work has been organised to take place on Sunday 21 April until approximately 16:00. Platforms 1-10 will be out of use meaning only a very limited train service will be able to operate to and from London Waterloo during this time.
http://www.nationalrail.co.uk/service_disruptions/today.aspx
Does anybody know what the problem is? The closure of platforms 1 - 10 would indicate all four of the Main Lines are closed, and Realtime Trains seems to confirm this, showing trains as using the Windsor Lines between Queenstown Road Battersea and Waterloo. Just wondered what the position of the track defect is that would lead to closure of four adjacent tracks.
Isn't it the London Marathon on Sunday too? That could lead to some fun and games!