Sorry but can't really see that being spun as 'Good News'. That would be if they had significantly cut down on the time of the inconvenience. But that hasn't happened. The fault developed on 30 September when it was stated "We hope to have the railway back in full operation within four weeks.". The full four weeks has been taken, nothing less.Good news indeed. National Rail are reporting that the work will be done overnight this Friday/Saturday