Does it fail accross the whole of the snowy world or just here ?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Nash

Member
Joined
14 Oct 2009
Messages
105
Overhead and 3rd rail, but also the high tech electric trains themselves as they seem not to like cold weather.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Why does it always seems to go around St Neots/Huntingdon?
Thank goodness that at least some trains can get through via Cambridge.
 

moonrakerz

Member
Joined
10 Feb 2009
Messages
870
DB have also been experiencing delays. Also, the s-bahn tunnel in munich seems to have problems in snowy weather

As have Eurotunnel trains in Northern France - but of course BBC/ITV viewers and Mail/Sun/NoW readers don't want to know that - do they ? :D
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
There was a Swiss Route that they used to dismantle the OHLE every Winter (mind you the route was also impassable for much of the winter) - they blasted a 10 mile Tunnel to bypass the problem section. It has now reopened as a Steam Railway during the summer
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,197
Location
LBK
Coventry to Birmingham is up the swannee today after OHLE failure somewhere between those parts. Hope it's fixed by tomorrow afternoon for me...
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
I though the difference was that Eurotunnel were the car-taking trains from Folkestone to Calais, and freight, whereas Eurostar was the 'TOC' from London and Ashford to Lille, Paris and Brussels?
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
There's a big difference:

Eurostar is the operator of high-speed passenger trains from London to Paris and Brussels through the tunnel

Eurotunnel is the company that manages and operates the tunnel itself, as well as the Shuttle vehicle-carrying services. Eurotunnel trains* do not (cannot due to massive loading gauge) leave the tunnel and terminals.

Based on this, the trains you were talking about were Eurostar- Eurotunnel are relatively unaffected by weather.


*they do have some trains that will be running in France, due to having several freight subsidiaries.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Yes, but that's irrelevant as GBRf don't run trains in Northern France
 

fsmr

Member
Joined
11 Feb 2009
Messages
659
Assuming enough snow falls to require ploughs on the ECML in Lincs tonight
I assume you cant run a plough under live OLE due to risk of creating a path to earth through the snow being pushed up (same thing happens under the 11kv lines across farm land with irigation sprays) ?
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Sure I've seen an "independent snow plough" at Peterborough before.

If the snow is dry (ie not thawing) there's no risk at all- solid H20 is an insulator, as the ions are immobilised.
 

Clip

Established Member
Joined
28 Jun 2010
Messages
10,821
Need something like this

ohmss_fleming_foto_snow_fan_01-01a.jpg
 

Traindesign

Member
Joined
14 Dec 2010
Messages
39
Location
Somerset
I was a type test/commissioning engineer on the 375/377 fleet and used to get loads of problems with LIM trips due to 3rd rail ice and line contacters opening due to the package overheating as the cooling ducts were choked with snow.
 

43106

Member
Joined
6 Jul 2008
Messages
384
Location
South-ish Edinburgh
Was the East Coast Electrification done on the cheap back in the day?

To put a bit of flesh on the succeeding response (the subject of which has been discussed on this forum several times)...
The ECML WAS done on the cheap, on the instruction of the Tory government of the day (it wouldn't surprise me if it was another dictat from Thatcher's Reichstag in Downing Street or Smith Square). The OHLE had to be as cheap as possible, which explains why it falls down with alarming regularity along its full length, not just between Hitchen and Peterborough. It's no-where near the standard of the WCML. Also (as a side issue) the "TOC" (for want of a suitable expression) wanted 34 x 91/82/Mk4 sets - they we given only 32 (the figures may be wrong, but they're not far out).
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Also (as a side issue) the "TOC" (for want of a suitable expression) wanted 34 x 91/82/Mk4 sets - they we given only 32 (the figures may be wrong, but they're not far out).

There's a long history of that. They wanted 25 Deltics and got 22. They wanted 5 extra HSTs at one point and got 2. They also specified the 91 for hauling twelve coaches plus DVT, and ended up with nine. There's certainly room for ten at King's Cross.
 

TheBigD

Established Member
Joined
19 Nov 2008
Messages
2,043
There's a long history of that. They wanted 25 Deltics and got 22. They wanted 5 extra HSTs at one point and got 2. They also specified the 91 for hauling twelve coaches plus DVT, and ended up with nine. There's certainly room for ten at King's Cross.

The MK4 sets were ordered as 8 car rakes originally, the 9th added shortly after.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
The MK4 sets were ordered as 8 car rakes originally, the 9th added shortly after.

Curious that the specs suggested that the 91s could haul twelve, was that just the engineers making sure there was plenty of power in reserve? Or is my memory letting me down?
 
Joined
29 Aug 2010
Messages
696
There's a long history of that. They wanted 25 Deltics and got 22. They wanted 5 extra HSTs at one point and got 2. They also specified the 91 for hauling twelve coaches plus DVT, and ended up with nine. There's certainly room for ten at King's Cross.

I think you'll find that - according to Gerard Fiennes in his book, ("I tried to run a railway") - the original order for the Deltics was 23 but got cut down to 22. I suspect that's where the extra Deltic bodyshell that was used for the DP2 locomotive came from.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Yes it was!

I think that is tbh hindsight engineering. The design at the time was regarded as being state of the art that allowed a business case to be made for the electrification.

The East Coast Main line has for historical reasons always been a priority for investment when both population distribution and wealth generation mean that post WW2 it should very much be a secondary priority (being serious for once :))
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
There's a long history of that. They wanted 25 Deltics and got 22. They wanted 5 extra HSTs at one point and got 2. They also specified the 91 for hauling twelve coaches plus DVT, and ended up with nine. There's certainly room for ten at King's Cross.

Twelve coach 225 rakes? :D

Surprising that nobody has suggested building another 90 coaches to extend them to that length (or at least some rakes - presumably not all stations could accomodate anything longer?)...
 
Status
Not open for further replies.

Top