I agree with what Greenback says. Ideal, small self contained network with lots of stops. Since there are no spare electrics available they would probably have to be new, but the diesels could be easily cascaded elsewhere. It's obvious really.
perhaps they could use some of the class 319's if they are replaced by new EMU's
I agree with what Greenback says. Ideal, small self contained network with lots of stops. Since there are no spare electrics available they would probably have to be new, but the diesels could be easily cascaded elsewhere. It's obvious really.

Would that not also apply to the local lines in and around Norwich as well?
All that would be nice to do at the same time is ensure a infill project between Ely to Norwich/Ipswich, Peterborough to Ely and Cambridge to Ipswich and practically all of East Anglia would be wired up,![]()
You would still have two diesel-worked lines protruding into the area, which would negate part of the gains, meaning that Ely-Norwich would be electrified for the benefit of one hourly passenger service
The Valley lines are pretty self contained, but then do you go to Maesteg and Newport? But if you do then that leaves the Swansea HSTs running under the wires for a fair way...
This wont happen anytime soon. Britains skint. Also heard that the EGIP has been put back aswell due to lack of funds. Not sure if its true though
My criteria would be to work out what the most efficient one would be (DMU miles saved per mile of new wires). Edinburgh Park to Glasgow Queen Street will be pretty efficient, but then there's the dilemma of Dunblane services. And if you wire to Dunblane then what about Alloa? And what about Cumbernauld? Or...
The 1960s approach was to do as much as possible in one block, which I think makes more sense.
Would that not also apply to the local lines in and around Norwich as well?
All that would be nice to do at the same time is ensure a infill project between Ely to Norwich/Ipswich, Peterborough to Ely and Cambridge to Ipswich and practically all of East Anglia would be wired up,![]()
the wrexham to chester bus is every 12 minutes, not 15. It is more reliable than the train.[/QUOTE.
........................................................................................................................................................................................................................
Mon Sat 5 buses an hour Wrexham to Chester Rail Station & Return, yes of course its more reliable than one train an hour, and the buses are brand new & clean, guide me to who said every 15 minutes?
--- old post above --- --- new post below ---
I agree with what Greenback says. Ideal, small self contained network with lots of stops. Since there are no spare electrics available they would probably have to be new, but the diesels could be easily cascaded elsewhere. It's obvious really.
Valley lines are 98% pacers, you can keep them in the South, with the cuts due
there is no way the WAG will have the spare cash to spend as the valley lines
are devolved to Wales.
Valley lines are 98% pacers
Valley lines are 98% pacers, you can keep them in the South, with the cuts due
there is no way the WAG will have the spare cash to spend as the valley lines
are devolved to Wales.
This is a popular misunderstanding. Whist the WAG have responsibility for the ATW Franchise, they do not have powers or funding related to the core rail infrastructure. The DfT in London manage England and Wales as a single entity and prepare a HLOS for NR on that basis as Transport Scotland do for Scotland. This is one of the issues for rail in Wales as this method appears to systemically underfund Wales. NR have admitted that, at best, less than £1Bn is allocated to Welsh infrastructure as part of CP4. This out of a total of £34Bn - so less than 3% (Vs 5% of the population). This probably represents a "high water mark due to the Cardiff and Newport signalling and Cardiff Central/Queen St capacity upgrades. Whilst the Ebbw Vale Line and Vale of Glamorgan Lines were re-opened, these scheme were funded in the main by WAG. However, as there in no allocation for rail infrastructure in the block grant WAG receives from Westminster, this money had to be taken away from funds hypothecated for areas such as health and education so in effect we in Wales are paying twice. Since 2005 Scotland has had full powers and funding (an extra £380M pa was transferred to its block grant from Westminster) and is now planning to spend £600M per year until 2014.
Furthermore, over the last twenty five years in England and Scotland, there have been major upgrades of both the East Coast Main Line (including electrification) and West Coast Main Line, new tube lines, numerous urban tram systems, HS1, Crossrail, major station refurbishments, etc. On the other hand, Wales has 0 miles of electrified rail, no trams, the oldest and most inappropriate rolling stock on the Valley Lines, undercapitalised stations, etc. Furthermore, the now in doubt GWML electrification programme would only return Cardiff-London and Bristol-London journey times to those we enjoyed in the 1970s when the HST was introduced. Wales has suffered a long term underinvested in its rail infrastructure; a shortfall that is certainly into the £Bns by now. In fact, since the opening of the Severn Tunnel in the century before last the only major rail upgrade in Wales was the introduction of the 125 High Speed Train in the 1970s albeit none of the track in Wales, even today, enables it to run at 125mph.
While I accept a lot of your argument, The Ebbw line was Euro objective one funding administered by WAG & Wefo, however the Saltney/Wrexham double track is Wag money, correct me if I am wrong in thinking that.
Yes, I think there is some Euro money in the pot. As far as I am aware this has to be matched funded though - and this portion still comes out of the WAG block grant. I think its shame, even with the poor DfT/NR settlment, that more of the Eurpean money WAG secured, was not directed at transport infrastructure projects.
This is a popular misunderstanding. Whist the WAG have responsibility for the ATW Franchise, they do not have powers or funding related to the core rail infrastructure. The DfT in London manage England and Wales as a single entity and prepare a HLOS for NR on that basis as Transport Scotland do for Scotland. This is one of the issues for rail in Wales as this method appears to systemically underfund Wales. NR have admitted that, at best, less than £1Bn is allocated to Welsh infrastructure as part of CP4. This out of a total of £34Bn - so less than 3% (Vs 5% of the population). This probably represents a "high water mark due to the Cardiff and Newport signalling and Cardiff Central/Queen St capacity upgrades. Whilst the Ebbw Vale Line and Vale of Glamorgan Lines were re-opened, these scheme were funded in the main by WAG. However, as there in no allocation for rail infrastructure in the block grant WAG receives from Westminster, this money had to be taken away from funds hypothecated for areas such as health and education so in effect we in Wales are paying twice. Since 2005 Scotland has had full powers and funding (an extra £380M pa was transferred to its block grant from Westminster) and is now planning to spend £600M per year until 2014.
Furthermore, over the last twenty five years in England and Scotland, there have been major upgrades of both the East Coast Main Line (including electrification) and West Coast Main Line, new tube lines, numerous urban tram systems, HS1, Crossrail, major station refurbishments, etc. On the other hand, Wales has 0 miles of electrified rail, no trams, the oldest and most inappropriate rolling stock on the Valley Lines, undercapitalised stations, etc. Furthermore, the now in doubt GWML electrification programme would only return Cardiff-London and Bristol-London journey times to those we enjoyed in the 1970s when the HST was introduced. Wales has suffered a long term underinvested in its rail infrastructure; a shortfall that is certainly into the £Bns by now. In fact, since the opening of the Severn Tunnel in the century before last the only major rail upgrade in Wales was the introduction of the 125 High Speed Train in the 1970s albeit none of the track in Wales, even today, enables it to run at 125mph.
Last reopening in the North? Putting aside WYPTE stations (or tram systems in Manc and Sheff) and thinking about actual lines, nothing very major springs to mind - just a few infills, like Brighouse, Wakefield to Pontefract, and before that Clitheroe, Copy Pit.
So look who's got the raw deal here....
Don't forget the reconstruction of Leeds station, the electrification of Leeds-Doncaster, Leeds to Bradford and Skipton, the introduction of class 333s, service improvements on the Settle and Carlisle line etc