• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Electrification scrapped.

Status
Not open for further replies.

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
I don't see why more intermediate stations should be added between the 'hub' at Old Oak Common and Birmingham, otherwise HS2 will solely be for travel between London and Birmingham ignoring other communities (e.g. Aylesbury). I'd suggest building a spur to Oxford with HS2 trains running onto Banbury (and since Oxford-Banbury would have to be electrified it would make sense to wire up the GWML as well, which might not happen), to reduce overcrowding on FGW trains to Oxford and Chiltern trains to Banbury

Regardless of our opinions, the scope of HS2 will change so Old Oak Common may not exist in the current Government's scheme of linking it direct to Heathrow. However I would suggest you (and others) are wrong by stating that HS2 would be solely for travel between London and Birmingham because the Labour scope of HS2 had a connection to the WCML at Lichfield which made it entirely possible that some Pendolino's could be run via HS2 (at 140mph maybe) rather than the current WCML South (Glasgow services for example). If the current Government's plans did not include links to existing lines such as this, I would be very very disappointed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,890
Location
South Wales
I dont know how the electrification could cost over £1 billion, as i am sure i read somewhere a few years ago that it would only cost £250 million to electrifiy the great western to Swansea/Bristol & £500 million to electrify the entire great western.

Besides if FGW or next operator are given a longer term contract then maybe they would be willing to invest in electrification and why dont some of the other opators put some money into the pot for it as some ATW local services could be run using EMU'S if the route is electrified.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
It was budgeted as £1bn for GW and £100m for the North West schemes (before Blackpool North tacked on).

But this gels with the rumour that the Thameslink consultants have been made temporarily redundant. No stock to cascade, no point in electrification.

Also for a review of franchises to take place the refranchising in progress of Greater Anglia and Essex Thameside has been cancelled, Anglia will resume at the end of the year and Thameside Autumn next year its just been announced. Network Rails Coucher has also resigned this morning, looks like they are doing some major house cleaning and everything will be totally paralysed for a year just like new spending commitments and rolling stock procurement.

Also interestingly this interview with Coucher published yesterday:
http://www.railnews.co.uk/news/gene...ation-looking-increasingly-unlikely-soon.html
 
Last edited:

Drsatan

Established Member
Joined
24 Aug 2009
Messages
1,887
Location
Land of the Sprinters
However I would suggest you (and others) are wrong by stating that HS2 would be solely for travel between London and Birmingham because the Labour scope of HS2 had a connection to the WCML at Lichfield which made it entirely possible that some Pendolino's could be run via HS2 (at 140mph maybe) rather than the current WCML South (Glasgow services for example).

Sorry, I forgot to mention that HS2 would include a connection to the Trent Valley Line at Litchfield.

However, to reduce journey times even more, why not extend HS2 to Manchester and Liverpool, and then onto Glasgow? (as per NR's plans). Running HS2 to Glasgow would decimate London-Glasgow domestic flights.

Read more here http://www.networkrail.co.uk/aspx/5892.aspx
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
Sorry, I forgot to mention that HS2 would include a connection to the Trent Valley Line at Litchfield.

However, to reduce journey times even more, why not extend HS2 to Manchester and Liverpool, and then onto Glasgow? (as per NR's plans). Running HS2 to Glasgow would decimate London-Glasgow domestic flights.

Read more here http://www.networkrail.co.uk/aspx/5892.aspx

It's ok saying that but as others have said, you have to start somewhere. In the Labour plans, HS2 from London to Birmingham was the start of what was supposed to be a bigger picture. Under the current Government, they have different views so it will be interesting to see what happens when (or if) further information gets released.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
It's ok saying that but as others have said, you have to start somewhere. In the Labour plans, HS2 from London to Birmingham was the start of what was supposed to be a bigger picture

Precisely.

Which is why this talk of it *only* being from London to Birmingham frustrates me. HS1 could be used by the majority of trains from London to Manchester/ Liverpool/ Glasgow (and other cities). Once the first part was up and running you can then consider whether you extend the High Speed sections to Leeds via Manchester (Conservative Plan) or to Manchester and to Leeds via Sheffield (Labour Plan). But no point in doing it all at once; much better to start on the section with the biggest cost/ benefit ratio (where capacity is needed), then increase it.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Its only a list of 24 projects from across all of government theyve taken decisions on, this is a fraction of the cuts of 20-25% in every department planned.

I was thinking perhaps the Northern electrification may be safer than the Great Western. If they cut back on the orders for Thameslink say 25-50% they wont have enough for both schemes but GW would need more and has the option of life extending HST, so a Northern electrification could take place to use up the fewer displaced unitsbecause theirs no life extension option.
 

Solaris

Member
Joined
17 Jun 2010
Messages
145
I think Wales/SW England are due some sort of rail investment. Since the last major upgrade in the 1970s when HST was introduced, there really has been nothing south or west of Swindon since. In that time we have seen WCML upgrade, ECML upgrade, numerous electrification schemes, trams in Manchester, Sheffield, London, new tubes, station upgrades, etc. In 1980 one could travel from Cardiff to London on a HST in 1hr45 the Manchester/London journey at time was >2hr 30. Today the same journeys are 2hr10m and ~2hr5min respectively. Bristol and Cardiff have got further away from London when compared to other major UK cities over the last 30 years. Even in Wales, today, the HST can only run at a top speed of <100mph at best...... The opportunity to electrify the GWML must be taken; after all the bulk of the £1Bn cost will be incurred 2014-2017 and not in the next four years anyway. Seems like a drop in the Ocean when compared to £18bn for CrossRail and even more for HS2 to Brum??
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,726
Location
Milton Keynes
They could provide 'new' electric trains for GW by replacing the HST power cars with 1 electric loco and a driving trailer with seats in it
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I think Wales/SW England are due some sort of rail investment. Since the last major upgrade in the 1970s when HST was introduced, there really has been nothing south or west of Swindon since. In that time we have seen WCML upgrade, ECML upgrade, numerous electrification schemes, trams in Manchester, Sheffield, London, new tubes, station upgrades, etc. In 1980 one could travel from Cardiff to London on a HST in 1hr45 the Manchester/London journey at time was >2hr 30. Today the same journeys are 2hr10m and ~2hr5min respectively. Bristol and Cardiff have got further away from London when compared to other major UK cities over the last 30 years. Even in Wales, today, the HST can only run at a top speed of <100mph at best...... The opportunity to electrify the GWML must be taken; after all the bulk of the £1Bn cost will be incurred 2014-2017 and not in the next four years anyway. Seems like a drop in the Ocean when compared to £18bn for CrossRail and even more for HS2 to Brum??

Could argue the same up North, takes twice as long to travel between Liverpool and Manchester now than it did 150 years ago!
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
Could argue the same up North, takes twice as long to travel between Liverpool and Manchester now than it did 150 years ago!

wow, I'm impressed, you can now do Liverpool to Manchester in 48 minutes, but in 1860 it only took 24!! No wonder they called it 'Rocket'. It's 31mil 78ch, so that means the 1860 train averaged about 80mph, Respect!!
 

Solaris

Member
Joined
17 Jun 2010
Messages
145
Whilst I agree there is a strong case for electrifying the Manchester-Liverpool route, the point I was making was that there has been little substantive rail investment in Wales and SW England for >30 years. After all the £6Bn WCML upgrade does benefit Manchester and Liverpool; Manchester has its tram systems, etc. Wales is perhaps one of the few countries in Europe with “0” miles of electrified track. The current journey times between Cardiff-Swansea and Cardiff-Bristol are >60 mins – for <40 miles!! That is an even worse performance than the current Manchester-Liverpool journey time. And the Cardiff Valleys network is crying out for electrification. Clearly in tough times something has to give – I just don’t think it needs to or has to include GWML electrification.
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
I think Wales/SW England are due some sort of rail investment. Since the last major upgrade in the 1970s when HST was introduced, there really has been nothing south or west of Swindon since. In that time we have seen WCML upgrade, ECML upgrade, numerous electrification schemes, trams in Manchester, Sheffield, London, new tubes, station upgrades, etc. In 1980 one could travel from Cardiff to London on a HST in 1hr45 the Manchester/London journey at time was >2hr 30. Today the same journeys are 2hr10m and ~2hr5min respectively. Bristol and Cardiff have got further away from London when compared to other major UK cities over the last 30 years. Even in Wales, today, the HST can only run at a top speed of <100mph at best...... The opportunity to electrify the GWML must be taken; after all the bulk of the £1Bn cost will be incurred 2014-2017 and not in the next four years anyway. Seems like a drop in the Ocean when compared to £18bn for CrossRail and even more for HS2 to Brum??

I couldn;t agree more, though I am likely biased because of my location!
 
Joined
12 Feb 2010
Messages
441
Location
Taunton
I think Wales/SW England are due some sort of rail investment. Since the last major upgrade in the 1970s when HST was introduced, there really has been nothing south or west of Swindon since. In that time we have seen WCML upgrade, ECML upgrade, numerous electrification schemes, trams in Manchester, Sheffield, London, new tubes, station upgrades, etc. In 1980 one could travel from Cardiff to London on a HST in 1hr45 the Manchester/London journey at time was >2hr 30. Today the same journeys are 2hr10m and ~2hr5min respectively. Bristol and Cardiff have got further away from London when compared to other major UK cities over the last 30 years. Even in Wales, today, the HST can only run at a top speed of <100mph at best...... The opportunity to electrify the GWML must be taken; after all the bulk of the £1Bn cost will be incurred 2014-2017 and not in the next four years anyway. Seems like a drop in the Ocean when compared to £18bn for CrossRail and even more for HS2 to Brum??

There's a short section of 100mph running near Pyle actually & for West of Exeter St Thomas there's also a small section of 100mph running.
 
Joined
12 Feb 2010
Messages
441
Location
Taunton
As an outsider, I just think it's a massive fiddle adding all of this padding, just so these private companies don't have to payout compensation under the passengers charter.

Quantity doesn't make up for the abysmal quality of service that people now have to put up with.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,069
Location
Redcar
1900 40 minutes
1950's 47 minutes
1960 45 minutes
Now upto 67 minutes

I'm not sure how your getting the journey between Manchester and Liverpool taking 67 minutes, as all the journeys I can see are timetabled for around 47 minutes.
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
Suspect the 67mins is the all stops pacer

Also West of Exeter it is possible for a Sprinter to give faster journeys then the HSTs, Speeds are low and the Sprinter's power doors and faster acceleration give it the advantage
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,069
Location
Redcar
Suspect the 67mins is the all stops pacer

Fair enough, but with three trains per hour all doing the journey in around 47mins I think its unfair to say that the journey between the two is much slower than in the past.
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
1900 40 minutes
1950's 47 minutes
1960 45 minutes
Now upto 67 minutes

Yes, but aren't you deliberately comparing the fastest of the day, with the slowest of today? That and a 40 year shortfall to your original 150 years ago claim, and the last time I looked, half of 67, was 33.5 and not 40. A job in the media evidently awaits you with your convenient use of statistics to suit :P
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
The current journey times between Cardiff-Swansea and Cardiff-Bristol are >60 mins – for <40 miles!! That is an even worse performance than the current Manchester-Liverpool journey time.

Manchester-Liverpool isn't the worse journey time in the North West. One I know off the top of my head is Stockport to Chester is 75 minutes for just over 35 miles.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
your seriously quibbling over an 8% discrepancy on the broad phrase 'half'?

Yeah slower because the original routes no longer there, comparing like for like all stopper with all stopper, but now the routes longer with more stops.
 
Joined
14 Feb 2009
Messages
172
So if it has been cancelled what happens now? Life extend the HSTs again? Son of Voyager?

We can always start building Castles again.:D

I thought less than 2 weeks ago they were giving assurances GWML electrification and HS2 were a go. Nothing like making your mind up is there.:roll:
 
Status
Not open for further replies.

Top