Does anyone know if the proposed Electric version of the HST get to the design phase before being cancelled?
If so are there any drawings or other renderings around?
I quess it depends upon what you mean by
"design phase". And regarding the second part of the question, certainly a model of the electric HST loco - which was given the class number 92 - was produced, but I can't ever remember seeing a photo of in published in a contemporaneous rail journal.
It's difficult to put a date on when this project was being developed, but it must have been after the abandonment of the APT-S project, certainly before class 90s/Mk 3 DVTs on the WCML, and the existance of the class 89 had a role to play in the cancelation of the electric HST project; and from memory, Brush was involved in the project's initiation by suggesting that diesel HST power cars be converted to electric.
The project was sponsored by InterCity. A project team was established with Don Heath (later Project Director for the ECML electrification scheme) as Project Manager and Norman Price (from BR Projects) as his assistant, the sponsor was represented by Maggie Faulkner, and David Faircloth joined from Procurement. The nominated engineer was Firoz Ghani, but a senior InterCity engineer also attended; sorry, can't remember if this was David Sandland or Brian Smeaton (or perhaps Brian replaced David!)
Apologies if I've got names or spellings wrong (or if I've missed someone out!) - it was 30+ years ago!
To put this requirement in context, the "Premier Line" was something of a backwater; the GW, ECML. MML and XC had their HSTs, but the WCML was still being worked by hauled stock, mainly with class 86s and 87s. True, there was a large number of Mk 3s, but there wers still Mk 1 catering vehicles (and weren't there even Mk 1 BGs on some trains?).
It had been the plan to use APTs on the WCML; but there were two factors which scuppered this. Firstly, the APT-S project couldn't get through the BR appraisal process, and secondly, a detailed analysis of the benefits of tilt on a line-for-line basis showed that it would only bring marginal improvements to journey times on the WCML (and that was mainly on the section through England's Northern Fells and over Beatock); consequently, BR looked at other ways of improving journey times on the WCML, and it's always been my understanding that the Crewe remodelling stemmed from that review. Creating electric HSTs using the existing Mk 3s was another way of
"upgrading" the service; in reality, this would mainly be a visible
"improvement", making existing trains look
"nicer" by giving them a sexy front end!
The project team was responsible for formulating the business specification for the electric HST; the base service for this was the 'Clansman', the day train between Euston and Inverness. Consequently, the electric HST power cars would have to be suitable for being dead-hauled over the Highland main line, and therefore end buffers/etc would be needed; certainly, general arrangement drawings were produced and tabled at project meetings which showed how side buffers could be encased, and for the necessary wires/connectors to be provided for control of the other power car by TDM. As the future of the Settle & Carlisle line was still in doubt at that time, one requirement for the power cars was for them to be suitable to be dead-hauled round the Cumbrian coast.
In concept, the electric HST power cars were very similar to the prototype HSTs; two would run with existing Mk 3s marshalled between them, and therefore they would have
"normal" ETS, etc. They would have been numbered in the loco series, and were allocated the class number 92. A model of the proposed loco was produced and presented to the BRB Investment Committee.
From memory, the project was cancelled becasue of resource problems; indications were that the concept had great potential, but the class 89 was more advanced and therefore it was chosen as the way forward at that time. With regard to the WCML, the electric HST was replaced by DVTs, push-pull services being operated by exsting class 86s, 87s, and a new fleet of class 90s.
Literally thousands of BR files were destroyed at privatisation, and the drawings produced by the M&EE dept were possibly amongst them; I've no idea what happened to the model.
Hope this helps.