90019
Established Member
Five out of eight grievances were upheld against Ian Craig.
Theres three stages to the tram scheme. Design, delivery and operation.
The design seems to have been pretty good (considering it was just one line, rather than attempting to build a whole "network") the first line was intended to serve the Airport, the two main out of town shopping centres, the centre of the city, a couple of train stations, the bus station, major employment areas, a Park And Ride site, a sports stadium and the biggest suburb (without getting into arguments about whether Leith is its own place or part of the big city).
For one line, that seems to tick a lot of boxes! Im struggling to think of how they could have designed one simple route thatd have provided more. Any other route would probably involve following bus routes (which slows the tram down, disrupts existing traffic further and begs the question what was the point in building a tram that just follows the existing bus route?).
Delivery? A shambles, obviously. The main problems seem to be that the council tried to do everything at once and tried to cut too many corners. If theyd focussed resources on the western end, they could have had a line from the Airport to Edinburgh Park (connecting the Airport to heavy rail) in operation whilst the section to Haymarket was under construction... then, once Haymarket was operational, the section through Princes Street could be built and so on and so on until the full line to Leith was up and running. Instead, we had many years of diversions and disruption along the whole length of the proposed route rather than focussing resources on individual areas. So, I can see why people are angry with the way the project was run (which caused the Leith section to be put on hold), but that has to be seen separately from the design and the operation of it.
As far as the operational side goes, it seems to be working okay. Its had less of an impact upon bus routes than had previously been suggested, its managing to attract new passengers without just poaching them from bus routes (obviously some tram passengers are upgrading from the bus, but the tram is also attracting people who werent using the bus however good Lothian Buses are). Its certainly doing a lot better in its early days than the Sheffield system was!
Theres a fair bit of bluff and bluster on this thread from people trying to find a reason to complain about the design and operational side but Im not sure what the problem is with those two aspects...
Complaints re the press release? Of course any press release from any organisation is going to focus on the positive its no surprise that TiE are making their figures sound as good as possible thats what any organisation would do. Therell be some churn in the figures, there always is I dont think anyone expected previous PR (in the pre-tram days) to say brutally honest things like numbers only went up because First reduced their competing services or "there was growth last year, but pretty much all from pensioners on free passes" or the rise in flat fare to £1.50 saw a drop in short distance passengers but growth on longer distance journeys hid this or the new passengers generated by the 104/113 to East Lothian masked the reduction in the Muirhouse area passengers. Anyone thinking that a TiE press release should focus on the negatives doesnt understand how PR works...
Theres always been churn on bus routes, services to some places increase whilst others reduce. This generally happens without much wailing (look at the reduction on the Sherrifhall route when the 48/X48 and 86 were withdrawn...), but the moment the peak only X12 was withdrawn, it seems to made some hysterical!
Theres complaints that the tram figures only look good because the opening saw the withdrawal of a bus service (aforementioned peak only X12 to Ingleston Park & Ride), yet there are also complaints on this thread about how few people were using peak time trams out of the city towards Ingleston (so if these trams were only carrying half a dozen people based on anecdotes on this thread then the numbers using the tram werent just because of passengers whod previously have been on the X12).
Worth remembering that the biggest reduction for Ingleston was when the all day 48/X48 (every fifteen minutes direct with peak extras) were replaced by a twenty minute extension of the 12 (via a slower route, serving the Gyle) and peak X12 yet these changes/reductions saw nothing like the same number of complaints!
The tram fare to the Airport is apparently unfair (compared to the tram fare to the stop before, Ingleston), yet nobody was complaining when the bus fare to the Airport (on the fastest service - AirLink) was considerably more than the bus fare to Ingleston (ignoring the circuitous 35 that took twice as long to get to the Airport i.e. not a route for longer distance passengers). Essentially, the moment its an excuse to moan about the tram, it becomes an issue...
And, imagine if the tram were only charging £1.50 to the Airport? Thered be complaints that this was undercutting the long established (but more expensive) Airlink buses and putting the flagship bus service in jeopardy.
Again, theres complaints that the tram doesnt directly duplicate bus routes (i.e. following the AirLink route past the Zoo and stopping at Waverley) but also complaints that it runs in areas that already have bus routes (and therefore duplicates them!)...
...theres complaints that the tram route doesnt just run along main roads (like the A8) and complaints that it causes a hazard for cyclists on the roads that it does run on (as a cyclist in Sheffield, Ive never had an accident due to tram tracks they are an obstacle that you need to be aware of but urban cycling involves lots of obstacles to be aware of).
The tram isnt integrated with heavy rail? Apart from at Haymarket, you mean? And Edinburgh Park? Given that the vast majority of Edinburgh trains (maybe 90%?) serve Haymarket, is this really the end of the world? Are there large numbers of people coming to Waverley on English trains (i.e. the handful that dont serve Haymarket) heading for the Airport? Do many people come from Newcastle to shop at the Gyle? Doubt it...
If I were travelling from most places in Scotland (Dundee/ Falkirk/ Glasgow etc) to the Gyle/ RBS/ Airport (etc) then why would I want to sit on a train all the way past Haymarket to Waverley only to sit on a tram from Waverley to Haymarket anyway? Surely Id just get off at Haymarket (or even Edinburgh Park)! The Waverley stuff feels like a red herring, another grumble for the sake of grumbling.
The Edinburgh situation will stop other cities from building their own schemes? No, I think that the drastic cuts to Local Government budgets (so that our Town Halls wont be able to provide anything other than Social Care even if/when the economy is fully recovered, the days of ambitious Local Government initiatives are in the past).
But, even so, why should the badly managed Edinburgh scheme stop future ones? The badly managed Cambridgeshire Busway hasnt stopped that scheme being a success once it opened, and hasnt stopped Greater Manchester from wanting their own busway.
Theres no end of badly managed railway schemes that are seriously delayed/ significantly over-budget but that doesnt seem to stop the appetite for more (nobody is suggesting that the messed up schemes at Tweedbank or Todmorden will mean no other railway reopenings/ reinstatements happen nobody is treating the over-running engineering works over the recent festive period as reason not to do so again in future years), so I dont buy the its Edinburghs fault that no more tram systems will be built argument.
So, whilst Im not defending the delivery aspect, I think that the complaints about the design and the operation are generally wide of the mark (and often contradictory!). Interesting that nobody has any sensible solutions for alternative tram routes...
To pick up on your points.So there's nothing to get our knickers in a twist over then?
The World's most expensive Tram line per mile by some margin surely?
Not a matter for concern?
What makes me and others who post on here very angry is the thought of what £800m could have achieved in the hands of people who knew what they were doing.
To pick up on your points.
Best thing to do now is to let it settle in for a couple of years and then look at how to extend it usefully and efficiently - maybe getting in people involved in the Manchester/Sheffield (and possibly Nottingham).
Wouldn't it be true to say the only unadulterated success in modern tramways in Britain has been Manchester, nitpicking about passenger numbers on the Ashton extension aside and perhaps Salford Quays? I would have included Nottingham as well until recent construction problems. Sheffield and Croydon seem to be better regarded now than in the inital few years while Birmingham seems to continue to disappoint almost everybody.I'm not including Tyne and Wear as it plays to different rules anyway. My assessments are based on passenger popularity as well as things like construction difficulties/cost overruns and enthusiast sentiment. There, cat among the pigeons, over to you. Ediinburgh I've only travelled on via video and so I'm not going to get personally involved in how it's doing,etc.
Wouldn't it be true to say the only unadulterated success in modern tramways in Britain has been Manchester, nitpicking about passenger numbers on the Ashton extension aside and perhaps Salford Quays? I would have included Nottingham as well until recent construction problems. Sheffield and Croydon seem to be better regarded now than in the initial few years while Birmingham seems to continue to disappoint almost everybody. I'm not including Tyne and Wear as it plays to different rules anyway. My assessments are based on passenger popularity as well as things like construction difficulties/cost overruns and enthusiast sentiment. There, cat among the pigeons, over to you. Edinburgh I've only travelled on via video and so I'm not going to get personally involved in how it's doing, etc.
Nottingham was pretty successful, though less so when it lost interavailable ticketing, but I hope when it opens it will recover its reputation as I don't think the routes suffer from the kinds of problem reported here for Edinburgh. Croydon was always pretty well regarded in terms of routeing and patronage, though it suffered financially from the operator not getting the revenue they expected due to bus competition (even in a regulated system...) and technically from the contractor having cut a few corners.
Wouldn't it be true to say the only unadulterated success in modern tramways in Britain has been Manchester, nitpicking about passenger numbers on the Ashton extension aside and perhaps Salford Quays? I would have included Nottingham as well until recent construction problems. Sheffield and Croydon seem to be better regarded now than in the inital few years while Birmingham seems to continue to disappoint almost everybody.I'm not including Tyne and Wear as it plays to different rules anyway. My assessments are based on passenger popularity as well as things like construction difficulties/cost overruns and enthusiast sentiment. There, cat among the pigeons, over to you. Ediinburgh I've only travelled on via video and so I'm not going to get personally involved in how it's doing,etc.
in the big re-organisation from Regions to smaller Councils in the early 90s much expertise took the redundancy and left
My personal preference for Edinburgh would have been a Tyne and Wear clone using the large amount of abandoned suburban rail infrastructure - most of which is still intact ie. not built on - and the South suburban. Eventually it could have been extended out to the likes of Penicuik etc. A cut and cover tunnel along Princes street would probably have been required. £800m in the right hands could have gone a long way to achieving that.
Theres three stages to the tram scheme. Design, delivery and operation.
The design seems to have been pretty good (considering it was just one line, rather than attempting to build a whole "network") the first line was intended to serve the Airport, the two main out of town shopping centres, the centre of the city, a couple of train stations, the bus station, major employment areas, a Park And Ride site, a sports stadium and the biggest suburb (without getting into arguments about whether Leith is its own place or part of the big city).
For one line, that seems to tick a lot of boxes! Im struggling to think of how they could have designed one simple route thatd have provided more. Any other route would probably involve following bus routes (which slows the tram down, disrupts existing traffic further and begs the question what was the point in building a tram that just follows the existing bus route?).
Delivery? A shambles, obviously. The main problems seem to be that the council tried to do everything at once and tried to cut too many corners. If theyd focussed resources on the western end, they could have had a line from the Airport to Edinburgh Park (connecting the Airport to heavy rail) in operation whilst the section to Haymarket was under construction... then, once Haymarket was operational, the section through Princes Street could be built and so on and so on until the full line to Leith was up and running. Instead, we had many years of diversions and disruption along the whole length of the proposed route rather than focussing resources on individual areas. So, I can see why people are angry with the way the project was run (which caused the Leith section to be put on hold), but that has to be seen separately from the design and the operation of it.
As far as the operational side goes, it seems to be working okay. Its had less of an impact upon bus routes than had previously been suggested, its managing to attract new passengers without just poaching them from bus routes (obviously some tram passengers are upgrading from the bus, but the tram is also attracting people who werent using the bus however good Lothian Buses are). Its certainly doing a lot better in its early days than the Sheffield system was!
Theres a fair bit of bluff and bluster on this thread from people trying to find a reason to complain about the design and operational side but Im not sure what the problem is with those two aspects...
Complaints re the press release? Of course any press release from any organisation is going to focus on the positive its no surprise that TiE are making their figures sound as good as possible thats what any organisation would do. Therell be some churn in the figures, there always is I dont think anyone expected previous PR (in the pre-tram days) to say brutally honest things like numbers only went up because First reduced their competing services or "there was growth last year, but pretty much all from pensioners on free passes" or the rise in flat fare to £1.50 saw a drop in short distance passengers but growth on longer distance journeys hid this or the new passengers generated by the 104/113 to East Lothian masked the reduction in the Muirhouse area passengers. Anyone thinking that a TiE press release should focus on the negatives doesnt understand how PR works...
Theres always been churn on bus routes, services to some places increase whilst others reduce. This generally happens without much wailing (look at the reduction on the Sherrifhall route when the 48/X48 and 86 were withdrawn...), but the moment the peak only X12 was withdrawn, it seems to made some hysterical!
Theres complaints that the tram figures only look good because the opening saw the withdrawal of a bus service (aforementioned peak only X12 to Ingleston Park & Ride), yet there are also complaints on this thread about how few people were using peak time trams out of the city towards Ingleston (so if these trams were only carrying half a dozen people based on anecdotes on this thread then the numbers using the tram werent just because of passengers whod previously have been on the X12).
Worth remembering that the biggest reduction for Ingleston was when the all day 48/X48 (every fifteen minutes direct with peak extras) were replaced by a twenty minute extension of the 12 (via a slower route, serving the Gyle) and peak X12 yet these changes/reductions saw nothing like the same number of complaints!
The tram fare to the Airport is apparently unfair (compared to the tram fare to the stop before, Ingleston), yet nobody was complaining when the bus fare to the Airport (on the fastest service - AirLink) was considerably more than the bus fare to Ingleston (ignoring the circuitous 35 that took twice as long to get to the Airport i.e. not a route for longer distance passengers). Essentially, the moment its an excuse to moan about the tram, it becomes an issue...
And, imagine if the tram were only charging £1.50 to the Airport? Thered be complaints that this was undercutting the long established (but more expensive) Airlink buses and putting the flagship bus service in jeopardy.
Again, theres complaints that the tram doesnt directly duplicate bus routes (i.e. following the AirLink route past the Zoo and stopping at Waverley) but also complaints that it runs in areas that already have bus routes (and therefore duplicates them!)...
...theres complaints that the tram route doesnt just run along main roads (like the A8) and complaints that it causes a hazard for cyclists on the roads that it does run on (as a cyclist in Sheffield, Ive never had an accident due to tram tracks they are an obstacle that you need to be aware of but urban cycling involves lots of obstacles to be aware of).
The tram isnt integrated with heavy rail? Apart from at Haymarket, you mean? And Edinburgh Park? Given that the vast majority of Edinburgh trains (maybe 90%?) serve Haymarket, is this really the end of the world? Are there large numbers of people coming to Waverley on English trains (i.e. the handful that dont serve Haymarket) heading for the Airport? Do many people come from Newcastle to shop at the Gyle? Doubt it...
If I were travelling from most places in Scotland (Dundee/ Falkirk/ Glasgow etc) to the Gyle/ RBS/ Airport (etc) then why would I want to sit on a train all the way past Haymarket to Waverley only to sit on a tram from Waverley to Haymarket anyway? Surely Id just get off at Haymarket (or even Edinburgh Park)! The Waverley stuff feels like a red herring, another grumble for the sake of grumbling.
The Edinburgh situation will stop other cities from building their own schemes? No, I think that the drastic cuts to Local Government budgets (so that our Town Halls wont be able to provide anything other than Social Care even if/when the economy is fully recovered, the days of ambitious Local Government initiatives are in the past).
But, even so, why should the badly managed Edinburgh scheme stop future ones? The badly managed Cambridgeshire Busway hasnt stopped that scheme being a success once it opened, and hasnt stopped Greater Manchester from wanting their own busway.
Theres no end of badly managed railway schemes that are seriously delayed/ significantly over-budget but that doesnt seem to stop the appetite for more (nobody is suggesting that the messed up schemes at Tweedbank or Todmorden will mean no other railway reopenings/ reinstatements happen nobody is treating the over-running engineering works over the recent festive period as reason not to do so again in future years), so I dont buy the its Edinburghs fault that no more tram systems will be built argument.
So, whilst Im not defending the delivery aspect, I think that the complaints about the design and the operation are generally wide of the mark (and often contradictory!). Interesting that nobody has any sensible solutions for alternative tram routes...
So there's nothing to get our knickers in a twist over then?
The World's most expensive Tram line per mile by some margin surely?
Not a matter for concern?
To pick up on your points.
Clearly the delivery was/is an issue and questions need to be asked as to why it was such a financial disaster.
There are however a lot of projects where costs spiralled out of control, but have eventually been deemed a success.
The tram is there now. Getting rid of it is clearly a stupid idea as that will cost even more money and cause even more disruption along the existing route.
Best thing to do now is to let it settle in for a couple of years and then look at how to extend it usefully and efficiently
The construction people at Nottingham aren't covering themselves with glory either. It's at least six months late and the disruption has been much greater than most people expected, considering there was no construction in the city centre.
Wouldn't it be true to say the only unadulterated success in modern tramways in Britain has been Manchester, nitpicking about passenger numbers on the Ashton extension aside and perhaps Salford Quays?
Sheffield and Croydon seem to be better regarded now than in the inital few years
My personal preference for Edinburgh would have been a Tyne and Wear clone using the large amount of abandoned suburban rail infrastructure - most of which is still intact ie. not built on - and the South suburban. Eventually it could have been extended out to the likes of Penicuik etc. A cut and cover tunnel along Princes street would probably have been required. £800m in the right hands could have gone a long way to achieving that
Hardly surprising if its the most expensive Tram line per mile, given that its a new build (these things are always getting more expensive to construct), its in a fairly expensive city/country and that the costs include groundwork and vehicles for the Leith end of the route too.
But the obvious frustrations with the delivery aspect aside, the rest of the complaints about the Edinburgh tram are mainly contradictory. On this thread Ive been told that:
- It doesnt go anywhere near where tourists would want to visit
- The passenger figures only look good because it opened during the Festival, so were boosted by lots of tourists using it
- It doesnt serve any areas of high density housing
- It should run along the A8, through the relatively low density of Corstorphine
- It duplicates existing bus services
- It doesnt duplicate existing bus services enough
- It slows down existing traffic like buses due to the on-street running
- It should have been designed along roads that are already very busy (e.g. through Gorgie)
I'm surprised I've not been told that the doors and both too wide and too narrow, and that the stops are too close together and too far apart!
I dont mind dealing with constructive criticism, but the moaners cant even make their minds up about why they hate the design and operation of the tram.
Other than that, the complaints seem to be toward the complaining for the sake of it end of the spectrum (It doesnt integrate with heavy rail? It doesnt stop close enough to the bus station?) rather than anything constructive. I think that people are using their unhappiness with the delivery of the project to lash out at other aspects of the design and operation.
A cut and cover tunnel under Princes Street certainly wouldnt have been cheap, and any service round the sub would struggle to be competitive with buses for journeys like City Morningside/ Cameron Toll due to the obvious circuitous nature of the route.
.
Yes it's a nice looking bit of icing on the cake - but £800m would have been better spent providing real transport solutions.
And there's the keyword - Integration - No UK Tram system (even well planned ones) will ever reach it's full potential while Bus services are still de-regulated. Yes where the buses and the trams end up under the same ownership as in Sheffield that's great - but these things should not be left up to "accident".
I once read a very interesting interview with a German Transport planner regarding the criteria for investing in new Tramlines, and extensions to existing Tram networks - simply put - once an existing bus corridor had reached saturation level - it was considered for conversion to Tram.
Here in the UK it's more complicated - decisions that should be made simply on proven transport requirements - as exampled above - become mired in considerations of, for instance, "urban renewal", renewal which may or not happen as planned or cost constraints which may mean that cheap alignments rather than effective alignments are chosen.
Wanting investment in BOTH "Metro" style solutions and in the bus and/or tram street network (don't tell me that a "Metro" station at Morningside Clock would not become a busy hub complimenting the busy street network above whether it be tram or bus) is not contradictory - they're both part of an effective mix -just look at your average German City.
Doubting the viabilty of what a modern Metro system as part of an integrated City Transport Network in Edinburgh could do just because the LMS/LNER/BR progressively withdrew their clapped out suburban steam services from the 1930s on is just a little bit silly.
Let's put this really simply - here we have an £800m City Centre to Airport Link that FAILS because the existing City Centre to Airport Link continues at the same level and is widely perceived as being the REAL Airport link as usage figures will prove.
And as a Tram Line heading to the west of the City it also FAILS as it fails to relieve either of the two main Bus Corridors to the west.
Rode the Edinburgh Tram yesterday, the trams and stops seem tidy, the ticketing was fairly easy to understand, but there needs to be a lot of work done on getting the tram prioritised over other traffic - the time we just sat waiting was pretty mediocre compared to my experiences here in Sheffield.
The 60 cyclists involved are only a small portion of the overall falls caused by the tramline, many of which go unreported.
What is contradictory is being unsupportive of the present line (with a proven passenger base) because it 'doesn't replace a saturated bus corridor', yet advocating reopening the South Suburban circular rail line when there is such little demand for equivalent circular bus services.
We're going round in circles with this.
If the trams can sustain a new passenger base on top of the buses maintaining theirs, then that is the absolute best case scenario. Your attempt to contort that into a negative is exactly what tbtc very thoroughly explained.
Trams aren't supposed to replace buses but to add new capacity and to take away from unsustainable transport choices. Just because bus routes aren't being slashed, doesn't mean that the buses aren't feeling the benefit of trunk passenger movements being taken elsewhere and indeed benefitting from less private car congestion.
Maybe also ask people who work at Edinburgh Park, who come in from Bathgate or who live along the route what the 'real' way to the airport is.
I mentioned the German point of view because they have dozens of successful dense Tram networks and we in the UK don't, therefore they must be doing something right that we aren't. Having a regulated framework is a help for a start.
I once read a very interesting interview with a German Transport planner regarding the criteria for investing in new Tramlines, and extensions to existing Tram networks - simply put - once an existing bus corridor had reached saturation level - it was considered for conversion to Tram.
Here in the UK it's more complicated - decisions that should be made simply on proven transport requirements - as exampled above - become mired in considerations of, for instance, "urban renewal", renewal which may or not happen as planned or cost constraints which may mean that cheap alignments rather than effective alignments are chosen.
The main bus corridors in Edinburgh are not relieved by this Tram - relief of existing Bus corridors should have been the starting point - which is why I believe the Leith Walk part of the scheme WAS a sensible application of the Tram enabling not only a reduction in bus mileage (perhaps for re-direction to developing parts of the city) but also an overall increase in passenger capacity due to the enormous advantages of a street tramway in these conditions.
Purely because the depot was planned where the land was cheapest ie. in the west the sensible bit WASN'T BUILT!
Let's put this really simply - here we have an £800m City Centre to Airport Link that FAILS because the existing City Centre to Airport Link continues at the same level and is widely perceived as being the REAL Airport link as usage figures will prove.
And as a Tram Line heading to the west of the City it also FAILS as it fails to relieve either of the two main Bus Corridors to the west.
Yes it's a nice looking bit of icing on the cake - but £800m would have been better spent providing real transport solutions
...The design seems to have been pretty good (considering it was just one line, rather than attempting to build a whole "network")...
How many "tram failures" have there been since it stated running?