Terminating District/Circle trains could then drop passengers in 2, reverse in the siding and load in 3 creating cross-platform interchange in both directions.

You would then have all terminating trains use platform 2, shunt into the sidings, shunt into 3 to start the next service.

That doesn't easily allow for Train Op's PNBs. You'd need to introduce stepping back.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Oh, absolutely, the suggestion takes no need of staffing/operational issues.
 