Terminating District/Circle trains could then drop passengers in 2, reverse in the siding and load in 3 creating cross-platform interchange in both directions.
You would then have all terminating trains use platform 2, shunt into the sidings, shunt into 3 to start the next service.
That doesn't easily allow for Train Op's PNBs. You'd need to introduce stepping back.