East coast drivers don't sign Cambridge so would need to be conducted by freight/FCC/grand central/XC/hull trains. Takes a while to sort that kind if double manning out. .
The ECML seems to have a large number of 'wires down' problems, I cannot recall too many 'wires down' probs on HS1 or Eurostar, does the ECML system need upgrading to 21st century standards?
Caused by dragging brakes on the DVT that had been dragged in by the Kings Cross thunderbird. It was the 10:00 from Edinburgh that required the rescuing, incidentally.Indeed I was!
Just another little titbit of info, as I left Kings Cross there was a strong burning smell filling the concourse. Platforms 7 and 8 had been evacuated.
Ive said it on other threads and I'll say it here, the ECML was done on the cheap with out dated tech (cross spans), longer gaps between masts etc etc.
If anyone sees a cross span go up on the new build for the GWML or MML, or even TP, time to weep.
I believe Old Timer did on this very forum somewhere. Lots of ECML/OHLE threads.![]()
A guy who gave a presentation other day who was part of the project would disagree with you, he actually dispelled. This is the way the Germans do it. And everyone goes on about how great the German rail system is....
He went through every 'myth' you just listed and dispelled them.
Indeed, and although ive no idea on the technical side of things i would like to add that having worked for GNER, NXEC and EC over quite a few years now, i would estimate disruption due to overhead line damage is down at least 80% from when i first started working on the railway. Im not that convinced its any worse that the WCML now to be honest, but if someone has stats on delay minutes on both lines caused by OHLE damage im willing to be corrected on that point.
Yes I was caught up in this. No problems until Peterborough, then was told we would be there for an unspecified amount of time. Eventually, we got in a taxi between Peterborough and Kings Cross, which was in a very poor state of repair and the doors wouldn't close properly at first.
Then at Kings Cross, they weren't prepared for our arrival and we had to run round to find an entrance that was open (this was at 0230 approx) to try and arrange an onward taxi to our LUL destination, which was done relatively quickly.
Although, we did get free refreshments, and as we were delayed on the onward journey it was pretty much a free day out!
. EC also arranged an onward taxi to my suburban London destination promptly once we tracked the staff down at the York Road entrance. When I left KGX at ~02:30 they were trying to find a taxi driver willing to take a passenger onwards to Southampton...However, what being ill gave me the most appreciation of was the lack of crowd control. When the delayed 16:22 and 15:36 were announced, the crowd surge towards the platforms was quite scary. Bear in mind this is half-term just before the normal end of the peak, so there's a lot of young kids and older family members travelling. Certainly, I didn't make it to either train in time to get on board before it was full up. I wonder if there's any alternative to this (or even any way of doing airline-style 'pre-boarding' for those needing extra time, when severe disruption happens)?
Anyway, just some thoughts. As is generally the case with these disruptions, individual staff were very helpful and professional, but the information being fed down was all over the place. As an outsider to the rail industry (but insider in the transport industry), I wouldn't like to comment on how much you dedicate to operations vs customer relations during events like this, but it does seem that some of the crowd control and information dissemination procedures may be somewhat lacking.
That is just not true. All that is needed is a pre-determined major incident plan, saying who is responsible and who does what. Just because several different bodies are involved does not mean it is impossible. If there is any difficulty, I suspect it is down to posturing.....With the best will in the world, and the best efforts of all concerned "on the ground", cohesion between the above bodies is near impossible with so many different masters to report to.....
On top of that you have a very vocal and demanding set of London commuters to cater for.
This is something that needs to be addressed in the next EC franchise. There should be a Milton Keynes style or Season Ticket restriction put in place at Peterborough and Stevenage.
Would it not be better to give the 5th EC path to FCC to run Peterborough sweepers with 12 car EMUs to cater for the spiralling commuter flows. How many North East and Scottish passengers find themselves standing or unable to board long distance IC services due to overcrowding caused by London commuters, especially on days like this?
When trains arrive into Biggleswade from Kings Cross are they departing south from platforms 3 or 4 or are they doing an empty shunt across to platforms 1 or 2?
Empty shunt to the up slow. They will very rarely allow a train to run under a ground position light with passengers-even less so as you can't see that signal from the platform.
Indeed, it was very odd this morning on the 07:45(ish!) from Biggleswade going south from Platform 4..! Waiting there really showed up the difference in facilities between P1/2 and P3/4 (Cafe, Office for Platform Staff, 2 Waiting Rooms, Toilets, a Canopy on P1/2 and a Metal Shelter on P3/4)Ignore what I said-they have now changed it as its a long term thing-all points are now clipped to starting back from the down with passengers. Was changed about an hour ago.
That is just not true. All that is needed is a pre-determined major incident plan, saying who is responsible and who does what. Just because several different bodies are involved does not mean it is impossible. If there is any difficulty, I suspect it is down to posturing.
#StNeots Following damage to more than 1km of overhead line equipment at St Neots around 22.00 on Tuesday 19 Feb our engineers have been working to restore the best possible service for passengers. Trains are running through the area although the extent of the damage means this is a reduced service.
Engineers will return to site at 22.00 tonight (Wed 20 Feb) and carry out complex repairs which will allow a full rail services to resume from 6am. This means no trains will run through the line at St Neots from 22.00 to 06.00.
Our team need to return on Thursday night to complete the repair so services will again not run through the area at 22.00 on Thursday to 06.00 Friday when the full timetable will resume.
Today (Wed 20 Feb) - Two of the four lines are open until 22.00 allowing a limited service to run. East Coast services are stopping additionally at Huntingdon and Peterborough to allow First Capital Connect passengers to make connections.
“We apologise to passengers for the significant disruption this is causing to services. Train operators are providing buses where necessary and have lifted ticketing restrictions to enable passengers to travel via alternative routes.”
"Passengers are advised to check with their train operator or @nationalrailenq."
Well, VT are reinstating a number of the peak MKC services, and have matched LM on off-peak prices. And there's already quite a price differential between FCC and EC on PBO-KGX (and most of the SVG services are the slower ones to NNG/YRK/LDS, which have relatively few space problems).
In the peaks, there's already 8- and 12-car services calling only at a subset of SVG, HIT, BIW, SNO and HUN, and they're pretty much at capacity already.