• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Eastleigh south yard query

Status
Not open for further replies.

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,320
Does anyone have an idea what the purpose of this new length of track will be, it's currently isolated from the rest of the sidings, but sited on a newly laid concrete pad about 30-40m long, with a short gap in the middle of the rails. I was thinking some sort of new weighbridge perhaps?

Picture taken from P3 alongside the waiting room, if it helps with location. Out of shot to the right, but roughly in line with the gap in the rails, is a small blue container, possibly something to do with the new installation?
 

Attachments

  • Eastleigh concrete pad.jpg
    Eastleigh concrete pad.jpg
    74.9 KB · Views: 54
Last edited:
Status
Not open for further replies.

Top