PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
No Cardiff Valley trains using Cardiff Central during weekend. Briefly, Rhymney and Treherbert trains running to/from Cardiff Bay. Route also closed between Central and Queen St. If anybody wants a run via Penarth Curve trains from Merthyr and Aberdare will run via City Line towards Barry.
More comprehensive details may be found on the NRE Website in "Future Engineering Works" Section.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,755
Location
West of Andover
Work relating to the new platform 8 at Cardiff Central?

--

Other major looking works from the NRE site appear to be the line between Birmingham New Street to Wolverhampton being closed, as well as Norton Bridge area

And the line east of Gidea Park on the Great Eastern being closed
 

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
Being an occasional user of WCML from Preston to Euston , i see there are various closures between Crewe and Birmingham New Street with some trains diverted via Stoke. One interesting diversion is the running of Edinburgh to Birmingham New Street trains via Crewe and Shrewsbury the from Wolverhampton via Bescot.
 
Last edited:

MrB

Member
Joined
3 Jan 2016
Messages
389
Location
London
I believe there's work going on at London Bridge and if memory serves me right that Cannon St. is shut over the easter weekend.
 

causton

Established Member
Joined
4 Aug 2010
Messages
5,504
Location
Somewhere between WY372 and MV7
Being an occasional user of WCML from Preston to Euston , i see there are various closures between Crewe and Birmingham New Street with some trains diverted via Stoke. One interesting diversion is the running of Edinburgh to Birmingham New Street trains via Crewe and Shrewsbury the from Wolverhampton via Bescot.

Which are annoyingly not open for reservations yet, as it is still unknown whether these services can run due to the problems at Lamington! Fingers crossed :)
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Being an occasional user of WCML from Preston to Euston , i see there are various closures between Crewe and Birmingham New Street with some trains diverted via Stoke. One interesting diversion is the running of Edinburgh to Birmingham New Street trains via Crewe and Shrewsbury the from Wolverhampton via Bescot.

I have heard that all VT Route Learning in connection with the Shrewsbury
diversion has been cancelled. Reason not known.
--- old post above --- --- new post below ---


According to RTT, the Route Learning trips for Preston drivers between Crewe and Shrewsbury resume next week. I would assume that relief will take place at Shrewsbury with Wolverhampton Drivers east thereof.
 
Last edited:

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Work relating to the new platform 8 at Cardiff Central?

According to Network rail, Laying new track and re-signalling between Canton in the West and Splott to the east of Cardiff Central. Could very well involve Platform 8 as I'm sure they would want to absorb the work into this Block. Strange for Network to agree to not starting work until the Saturday night because of the World Half Marathon in Cardiff

--
--- old post above --- --- new post below ---
Looking at the Cardiff situation again, no trains will access Platform 4 at the east End, only in and out at West end. This perhaps suggests the installation of the new lead to access Cardiff Queen St to and from Platform 4 which is on the cards.
 
Last edited:

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
Anyone know why the major engineering work on the Cardiff Valley lines, causing major timetable alterations and diversions with trains avoiding CDF -- CDQ isn't starting until 9pm on Saturday 26th March and then runs until end of service on Tuesday 29th March?

With it being a holiday weekend I would've thought it would make more sense to start the work on Good Friday and have it all finished by the end of Monday 28th March so it doesn't affect people going back to work.

There's no major events on in Cardiff on Good Friday or Saturday from what I can find that would cause NR to want to delay starting the work???

http://www.arrivatrainswales.co.uk/easter2016/
 

CardiffKid

Member
Joined
13 Feb 2011
Messages
1,081
Location
Cardiff
The question was more why Sat evening until Tuesday evening, not Fri-Mon given it's a four day weekend. The answer is The World Half Marathon on the Saturday in Cardiff.

Whilst it's not far to walk, this will cause big problems on the Tuesday morning.
 
Last edited by a moderator:

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,487
Location
Powys
And possibly there aren't the staff available on the Friday night/ Saturday day?
Plus a lot of people now work Good Friday and have the Tuesday off instead.
 

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,129
Location
Derby
I may be travelling on the 08.09 XC service from MAN to BHM on Easter Sunday and I'm just wondering if I've got this right because the wording on their site is a little confusing.

The first XC train from MAN usually runs via Crewe but can't at Easter because it would mean going via Alsager, which XC don't do.

It will run via Macclefield, Stoke and Stone to Rugeley where it will reverse back up to Stafford.
It reverses again at Stafford and runs south via Penkridge but avoids Wolverhampton and runs via Bescot into Birmingham.

Is that correct?
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,755
Location
West of Andover
I may be travelling on the 08.09 XC service from MAN to BHM on Easter Sunday and I'm just wondering if I've got this right because the wording on their site is a little confusing.

The first XC train from MAN usually runs via Crewe but can't at Easter because it would mean going via Alsager, which XC don't do.

It will run via Macclefield, Stoke and Stone to Rugeley where it will reverse back up to Stafford.
It reverses again at Stafford and runs south via Penkridge but avoids Wolverhampton and runs via Bescot into Birmingham.

Is that correct?

Looks correct to me:
http://www.realtimetrains.co.uk/train/C13229/2016/03/27/advanced
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
I may be travelling on the 08.09 XC service from MAN to BHM on Easter Sunday and I'm just wondering if I've got this right because the wording on their site is a little confusing.

The first XC train from MAN usually runs via Crewe but can't at Easter because it would mean going via Alsager, which XC don't do.

It will run via Macclefield, Stoke and Stone to Rugeley where it will reverse back up to Stafford.
It reverses again at Stafford and runs south via Penkridge but avoids Wolverhampton and runs via Bescot into Birmingham.

Is that correct?

Cross Country do run via Alsager, perhaps to retain diversionary route knowledge:-

www.realtimetrains.co.uk/train/C13218/2016/03/16/advanced
 

CardiffKid

Member
Joined
13 Feb 2011
Messages
1,081
Location
Cardiff
And possibly there aren't the staff available on the Friday night/ Saturday day?
Plus a lot of people now work Good Friday and have the Tuesday off instead.

Possibly, although I'll wager that the half marathon is a bigger factor.

Network Rail wouldn't close the line on the Tuesday which is a regular working day for most people unless they had to.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
The Works were planned long ago, at least 12 weeks, so any staff issues wouldn,t have been known then. Half Marathon the reason, Network Rail do not always give in to events.
--- old post above --- --- new post below ---
In the media (Walesonline) that works not starting in Cardiff until 2100 Saturday due to World Half Marathon, so there's the answer.
--- old post above --- --- new post below ---
Work relating to the new platform 8 at Cardiff Central?

--

Other major looking works from the NRE site appear to be the line between Birmingham New Street to Wolverhampton being closed, as well as Norton Bridge area

And the line east of Gidea Park on the Great Eastern being closed

Have read in press that track is to be laid in Platform 8 during the Easter Works at Cardiff and connected at the East End (Wueen St end) of the station. The West end will be connected during an occupation in October. Haven't got a commissioning date yet unless it's done in October.
--- old post above --- --- new post below ---



On NRE site tonight:-
Major Engineering Works Easter, a summary here

Route affected
Various routes across the network

Train operator affected
Abellio Greater Anglia; Arriva Trains Wales; Chiltern Railways; CrossCountry; First TransPennine Express; Gatwick Express; Grand Central; Great Northern; Great Western Railway; Hull Trains; London Midland; Northern Rail; South West Trains; Southeastern; Southern; Stansted Express; TfL Rail; Thameslink; Virgin Trains; Virgin Trains East Coast;
Description
Easter 2016 is one of the biggest Easter investment programmes to date, with Network Rail delivering 450 individual projects, which is roughly 20% more than Easter 2015. It is estimated around £55m will be invested by Network Rail staff over Easter 2016.
The major work taking place over the Easter period is affecting the following routes:
No trains between London Liverpool Street and Ingatestone / Wickford from Friday 25 March to Monday 28 March
Amended service in the Cardiff area from 21:15 Saturday 26 March until Tuesday 29 March
Buses replace trains between Birmingham New Street and Wolverhampton from Friday 25 to Wednesday 30 March
No Chiltern Railways services between Amersham and London Marylebone from Friday 25 to Monday 28 March
No trains between Crewe / Stone and Stafford from Friday 25 to Monday 28 March
Major improvement work at Manchester Victoria from Thursday 24 March to Sunday 3 April
Amended service between Huntingdon and Peterborough from 22:45 on Friday 25 until 06:45 on Monday 28 March
Amended services between London Paddington and Reading from Friday 25 to Monday 28 March
Amended service between London Cannon Street / London Charing Cross and Charlton / New Cross from Friday 25 until Sunday 27 March
No Southern trains to and from London Victoria from Friday 25 to Monday 28 March
In addition to the above works, these long term engineering projects are also still taking place.
 
Last edited:

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,849
Location
East Anglia
I you thought the overcrowding out of Euston/Kings Cross was bad yesterday then it would appear it's chronic today with amended services across the network due to works. Reduced West Coast frequency appears to be worst for this this morning.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Could have done with running a modified plan, Three trains to / from Edinburgh in some hours (similar to Saturday or Sunday) and hourly to Leeds all day. The twitter complaints have been strong.
 