Why are the platforms only being built for 3 car trains? Doesn't allow for growth
 

Speed43125

Member
Joined
20 Jul 2019
Messages
1,172
Location
Dunblane
The whole spec now that everything been made cheaper, 90 rather than 100mph running, electrification cancelled, and pathetically short platforms is simply far too short sighted for a modern built railway. Do I need to bring up past example of this? Operation Princess? Borders Railway? etc etc?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
The whole spec now that everything been made cheaper, 90 rather than 100mph running, electrification cancelled, and pathetically short platforms is simply far too short sighted for a modern built railway. Do I need to bring up past example of this? Operation Princess? Borders Railway? etc etc?
When did it drop to 90mph? The signalling diagrams don't show that and I haven't seen a Network Change that says that either.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,281
When did it drop to 90mph? The signalling diagrams don't show that and I haven't seen a Network Change that says that either.
The TWA inspectors report still reckons Bicester to Bletchley is 100 mph, Aylesbury to Claydon is 90 mph, and Marston Vale remains 60 mph.
 

klass43

Member
Joined
20 Feb 2020
Messages
24
Location
UK
OK but what about 3 car class 185

Either way, it's another 'waiting forever' project. Why do rail projects take so long to get done in the UK?

Thameslink (originally Thameslink 2000). 18/19 years late.
Crossrail. 3+ years late.
HS1 (2007). 14+ years late (after the French built their longer link LGV Nord (1993)).

You get the idea.

Plus, yet another project downgraded it seems. One of many in the past.
 

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
OK but what about 3 car class 185

I suspect TPE will keep them for Liverpool-Nottingham services.

Why not Class 175s by the time they got cascaded from TfW

Could be a good candiate there are enough of them. They are 16 3-car units with TfW so they could use them all for EWR. They need 12-14 according to their website.

https://eastwestrail.co.uk/latest-news/east-west-rail-goes-shopping-for-trains
East West Railway Company is seeking bids for leasing a fleet of 12 or 14 x 3 car self-powered units with modifications including European Train Control System (“ETCS”) Level 2 and Driver Controlled Operation (“DCO”) capability, supported by a full maintenance package (under a ‘wet’ lease). The lease duration is four years, with an option to extend for two years.

OK but I think class 170s or other turbostars will be better

The turbostars will end up with EMR so no spares left.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Allows for 4x26m at a squeeze.

If the platforms allow for 4x26m trains, would that mean they should be able to easily accept 4x20m trains with plenty of platform space as it leaves least 24m free if I'm right?

As to the rolling stock, I think a train with doors set up as the Class 170s do would be ideal for the route.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
OK but I think class 170s or other turbostars will be better
Thats if any are available, the available ones are going to EMR and if any more are available EWR will have to try and get them before Chiltern or Northern who both have a rolling stock shortage and both already operate the 170 or the similar 168.
 

Stephen Lee

On Moderation
Joined
7 Jul 2019
Messages
682
Thats if any are available, the available ones are going to EMR and if any more are available EWR will have to try and get them before Chiltern or Northern who both have a rolling stock shortage and both already operate the 170 or the similar 168.
Well.....12 of the 171s are due to transfer to EMR but have no idea where can the rest 8 go assume EWR will use 175s
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Well.....12 of the 171s are due to transfer to EMR but have no idea where can the rest 8 go assume EWR will use 175s
Southern will still need the remaining 8 for the unelectrified sections, battery 377s have been suggested but they haven't materialised yet.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,346
Southern will still need the remaining 8 for the unelectrified sections, battery 377s have been suggested but they haven't materialised yet.

Slightly off topic but 8 171s might be enough to run Ashford to Hastings and Oxted to Uckfield and forget about through running to London Bridge or Eastbourne.

No need for battery 377s and no availability of 171s for EWR.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Slightly off topic but 8 171s might be enough to run Ashford to Hastings and Oxted to Uckfield and forget about through running to London Bridge or Eastbourne.

No need for battery 377s and no availability of 171s for EWR.
Yep, the 175s seem the most likely for EWR.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,647
I would hope that this might have been reviewed and some Grayling de-scope reinstated (wires, speeds) - but with Covid and the doubling down on HS2, I can't see that there will be much spare, at this scale.

The two lines even cross, you'd think that might be a good place for one of the new garden eco new towns or whatever they are - with spiffy new connections at all angles (Oxford, MK, London and Brum all within 30 mins!) But there you go.

Most legacy platforms will take longer trains if they ever come - for instance, XC services or extended EWR due to demand - Bletchley would be the main problem though.
 

Stephen Lee

On Moderation
Joined
7 Jul 2019
Messages
682
Slightly off topic but 8 171s might be enough to run Ashford to Hastings and Oxted to Uckfield and forget about through running to London Bridge or Eastbourne.

No need for battery 377s and no availability of 171s for EWR.
If you say this looks like some 171s are running under wires :)
 

Mitchell Hurd

On Moderation
Joined
28 Oct 2017
Messages
1,762
I love the idea of Class 175's - it will be like Adelantes returning for a 3rd time to services in and out of Oxford, only I guess more reliable ones :)!

Also the comfort of these is fantastic!
 