I am sure that if an Inquiry could be avoided then it would be. Nonetheless that seems an unlikely prospect.
An unnamed NR source provided this 'timetable' to Railfuture:

https://www.railfuture.org.uk/ox-cam

Clearly those dates quoted will not be met.
so at which point do you say....tough.
deadline was know for ages, plenty of opportunity to submit greviance,

I see no such leaway for extensions in filling in tax returns!:D
 

alexx

Member
Joined
17 Sep 2015
Messages
95
Lots of activity around Bicester in the last week or so. On 17 October Charbridge Lane level crossing (A4421 Bicester Perimeter Road) had its barriers removed. They have been replaced with farm type gates across the tracks either side of the road, but now nothing to protect the road. Track remains towards Bicester. And near Jarvis Lane the line has been slewed to connect with the Up Bletchley at Gavray Junction (previously it ended at buffer stops and connected into the Down side) see photo from 10 October.

Bit of a change when I went that way earlier today - buffer stop near the Jarvis Lane crossing is now back, and the track has been lifted from there to Charbridge Lane. Track remains on the Launton side of Charbridge Lane.

Charbridge Lane crossing looking towards Launton

Charbridge Lane crossing looking towards Jarvis Lane and Bicester Village
Jarvis Lane crossing looking towards Charbridge Lane crossing and Launton

Jarvis Lane crossing looking towards Bicester Village

Also, not sure that compound by the Launton roundabout is railway related - there's what appears to be electrical installation work going on in Charbridge Lane coming from the general direction of the new substation on Skimmingdish Lane, and the pipes stacked in that field looked similar to what was being installed.
 
Last edited:

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
The Winslow Town Council is reporting the start date of the Public Inquiry to be Wednesday 6th February 2019.
We have been notified by the Secretary of State for Transport that the Public Inquiry into the second phase of the East West Rail project, which includes the line through Winslow, will be commence at 10am on Wednesday 6th February 2019 at MK Community Foundation Conference & Training Facilities, Margaret Powell House, 433C Midsummer Boulevard, Milton Keynes, MK9 3BN.
https://www.winslowtowncouncil.gov.uk/east-west-rail-announcement-of-public-inquiry-details/
Assume this to be the Inquiry proper rather than the pre-inquiry meeting?
In which case I was wrong about the Inquiry timetable dates given a few posts back not being met :)
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,727
Location
Milton Keynes

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
The Winslow Town Council is reporting the start date of the Public Inquiry to be Wednesday 6th February 2019.

https://www.winslowtowncouncil.gov.uk/east-west-rail-announcement-of-public-inquiry-details/
Assume this to be the Inquiry proper rather than the pre-inquiry meeting?
In which case I was wrong about the Inquiry timetable dates given a few posts back not being met :)
Why is a Public inquiry needed for this stretch. I thought it was just upgrading a stretch that is closed but still with Network Rail.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,307
Why is a Public inquiry needed for this stretch. I thought it was just upgrading a stretch that is closed but still with Network Rail.
Basically to allow closure of numerous level crossings by diverting and combining necessary roads and footpaths. Similar to what they did with Oxford to Bicester - also an operational railway prior to the project.
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
Why is a Public inquiry needed for this stretch. I thought it was just upgrading a stretch that is closed but still with Network Rail.
As said by @swt_passenger many bits of the proposal require work outside what is operational rail land. Nonetheless had there been no objections, or the objections had been such that negotiation would have led to the objections being withdrawn, then there would not have been an Inquiry.
I am surprised that there is nothing yet about the Inquiry on the EastWestRail website.
Perhaps they don't see interaction with 'The Public' as a priority?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I am surprised that there is nothing yet about the Inquiry on the EastWestRail website.
Perhaps they don't see interaction with 'The Public' as a priority?
I suppose you could say the purpose of the inquiry is to consider objections that were submitted during the objection period, and those objectors will already have been notified of the date and place.
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
I suppose you could say the purpose of the inquiry is to consider objections that were submitted during the objection period, and those objectors will already have been notified of the date and place.
Sure, as part of the formal process handled by the TWA Orders Unit (or their agents) on behalf of the Secretary of State.
The TWAO Application was submitted by Network Rail on behalf of East West Rail Alliance who will build the western section. This is apart from East West Rail Company Ltd. who are supposedly charged with running the railway when complete (separately from NR!).

EastWestRail Consortium, the Local Authorities, Business Groups etc. is the public facing driver of the project. There is nothing in the News Section of their website since 11th September when they submitted their letter of support for the TWAO (well they would wouldn't they!).

https://www.eastwestrail.org.uk/
Just surprised that they are not more outgoing with information thats all.
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands

camflyer

Member
Joined
13 Feb 2018
Messages
1,171
Extract:

Comment:
Until we have an indication of where the real housing growth is going to be how can they know?
And who are these communuters? Clearly not as important as great crestednuters :D

There is already a big housing development at Cambourne and with a new town coming at Northstowe so the CamBedRailRoad route with a northern approach to Cambridge does make a lot of sense, especially if it could be planned alongside the Oxford to Cambridge Expressway corridor.

However, what I don't quite understand is how much support for CBRR is coming from people along the proposed route or whether it is a Nimbyist plan from those around Sandy who don't want the line near them.
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,442
There is already a big housing development at Cambourne and with a new town coming at Northstowe so the CamBedRailRoad route with a northern approach to Cambridge does make a lot of sense, especially if it could be planned alongside the Oxford to Cambridge Expressway corridor.

However, what I don't quite understand is how much support for CBRR is coming from people along the proposed route or whether it is a Nimbyist plan from those around Sandy who don't want the line near them.

This bit of railway will get built once the funding is in place. Government don't want to pay, so the plan at the moment is to take a cut from house builders. Picking a route that goes past settlements which already exist, or where planning permission has already been given for new houses, but teans there is less cash to build it. Once the line is built, then it might be more profitable
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
This bit of railway will get built once the funding is in place. Government don't want to pay, so the plan at the moment is to take a cut from house builders. Picking a route that goes past settlements which already exist, or where planning permission has already been given for new houses, but teans there is less cash to build it. Once the line is built, then it might be more profitable
Yet this blinkered Government can find £30billion to pay for roads despite choking us to death with air pollution!

It has been proved that building more roads doesn't relieve traffic congestion. When will they learn?
 
Last edited by a moderator:

gallafent

Member
Joined
23 Dec 2010
Messages
550
We need both rail AND road improvements in the corridor. it isnt one or the other.

I think the A428 (between A1 and M11 at least) is to be upgraded to “Expressway” standard as part of the Oxford-Cambridge Expressway project. No idea on timing of the upgrade for that section, but I would be surprised if it isn't done before the railway, whichever route that takes. A421 between M1 and A1 (including going past Bedford) has already been done, but the rest of the route still in planning stages … now, as for the Western part of the Expressway, between the M1 and somewhere near Oxford, ………
 

wildcard

Member
Joined
13 Feb 2011
Messages
122
The only real certainty is that Chiltern will run the service from Marylebone to Milton Keynes via Aylesbury, because it is known to be an extension of their existing service.

Other services could be any of Chiltern, London Midland, or FGW, it has never been confirmed one way or another, although a few years back Chiltern were quoted as not being interested in the other expected routes at all. Given the more recent plans of the EWR consortium that trains will run through to Reading, I think FGW's successor is the most likely.

My understanding is a through service via Aylesbury has now been de-scoped - so passengers will now have to change trains at Aylesbury on the MK-Aylesbury-High Wycombe-Marylebone route. I am assuming this means Chiltern won't be getting as far as MK and East-West will be a standalone franchise to start with ( Oxford-MK, Oxford-Bedford , Aylesbury - MK )
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,307
My understanding is a through service via Aylesbury has now been de-scoped - so passengers will now have to change trains at Aylesbury on the MK-Aylesbury-High Wycombe-Marylebone route. I am assuming this means Chiltern won't be getting as far as MK and East-West will be a standalone franchise to start with ( Oxford-MK, Oxford-Bedford , Aylesbury - MK )
Already discussed more recently. You’re quoting a post from over 4 years ago, I think it was correct at that time...
 

Railwaysceptic

Established Member
Joined
6 Nov 2017
Messages
1,738
Yet this blinkered Government can find £30billion to pay for roads despite choking us to death with air pollution!

It has been proved that building more roads doesn't relieve traffic congestion. When will they learn?
It has not been proved that building roads doesn't relieve traffic congestion. I know several towns which once were gridlocked but which now have no traffic because a bypass has been built. Buckden, for example, used to have the A1 running though it. Now, you can stroll down the middle of the road to look at the Bishop's Palace.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
My understanding is a through service via Aylesbury has now been de-scoped - so passengers will now have to change trains at Aylesbury on the MK-Aylesbury-High Wycombe-Marylebone route. I am assuming this means Chiltern won't be getting as far as MK and East-West will be a standalone franchise to start with ( Oxford-MK, Oxford-Bedford , Aylesbury - MK )
A cop out again with railways. Why is it always railways and never roads descoped.

This was an obvious extension. When will the passengers interests be put first?
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
It has not been proved that building roads doesn't relieve traffic congestion. I know several towns which once were gridlocked but which now have no traffic because a bypass has been built. Buckden, for example, used to have the A1 running though it. Now, you can stroll down the middle of the road to look at the Bishop's Palace.
No it hasn't relieved it, it has just moved it to elsewhere.
 

camflyer

Member
Joined
13 Feb 2018
Messages
1,171
Why, after the IPCC report on climate change was so damning of road traffic pollution?

Which will become less of an issue with the move to electric, hybrid and ulltra-low emission vehicles.

if we are going to upgrade links in the Ox-Cam arc then it makes sense to integrate road, rail and housing planning a much as possible into a joined-up policy. I thought that's what the National Infrastructure Commission was supposed to be there for.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
A cop out again with railways. Why is it always railways and never roads descoped.

Short memory there - a whole swathe of road improvements were put on hold by John Prescott in 1997 when he canned the roads programme which damned a number of towns and villages to excessive traffic for 20 years as their long-awaited by-passes got deferred indefinitely.

To pretend that the road network has seen continued funding is disingenuous.....
 