East Kilbride/Barrhead electrification updates

Status
Not open for further replies.

apjsco

Member
Joined
24 Feb 2024
Messages
19
Location
Glasgow
Giffnock station is open and looking great … there’s still some landscaping works to be done on both sides of the platforms and neither of the new lifts are in operation.
 

Attachments

  • IMG_7320.jpeg
    IMG_7320.jpeg
    470.1 KB · Views: 269
  • IMG_7322.jpeg
    IMG_7322.jpeg
    603.8 KB · Views: 263
  • IMG_7305.jpeg
    IMG_7305.jpeg
    710.6 KB · Views: 237
  • IMG_7312.jpeg
    IMG_7312.jpeg
    691.8 KB · Views: 254
  • IMG_7315.jpeg
    IMG_7315.jpeg
    508.4 KB · Views: 258
  • IMG_7317.jpeg
    IMG_7317.jpeg
    592.8 KB · Views: 255
  • IMG_7318.jpeg
    IMG_7318.jpeg
    447.4 KB · Views: 252
  • IMG_7319.jpeg
    IMG_7319.jpeg
    506.5 KB · Views: 254
  • IMG_7317.jpeg
    IMG_7317.jpeg
    592.8 KB · Views: 265
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,498
Location
Moorpark, CA
Great set of pics! It’s been fascinating to see the transformation as someone who used the line for 17 years.
 

drb61

Member
Joined
24 Oct 2020
Messages
82
Location
Cambuslang
Realtimetrains seems to indicate that most services at Hairmyres have been using platform 1 in both directions. Is it the case that the loop is actually 2 bidirectional lines and most services outside the peak hours will use platform 1 to save customers having to use the footbridge? Apologies if this has already been answered!
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Realtimetrains seems to indicate that most services at Hairmyres have been using platform 1 in both directions. Is it the case that the loop is actually 2 bidirectional lines and most services outside the peak hours will use platform 1 to save customers having to use the footbridge? Apologies if this has already been answered!
When there on Sunday both platforms were being used between 1300 and 1530. But looking back to RTT for then it was showing platform 1 in both directions but the trains from Glasgow were showing Platform 1 but in RED typo. Appears to be the same case today.
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,592
Realtimetrains seems to indicate that most services at Hairmyres have been using platform 1 in both directions. Is it the case that the loop is actually 2 bidirectional lines and most services outside the peak hours will use platform 1 to save customers having to use the footbridge? Apologies if this has already been answered!
The loop is indeed 2 bi-directional lines. The map at https://traksy.uk/live/M+11+HARMYRS is accurate. I haven't been watching, but you should be able to see on there which line the trains take. I'd imagine it's probably accurate on RTT, and they are just using one platform while they finish work on the other or something.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
The loop is indeed 2 bi-directional lines. The map at https://traksy.uk/live/M+11+HARMYRS is accurate. I haven't been watching, but you should be able to see on there which line the trains take. I'd imagine it's probably accurate on RTT, and they are just using one platform while they finish work on the other or something.
Thanks for the link. Tried it out on EK bound. Traksy showing it at platform 2. RTT as platform 1 in RED. Need feet on the ground
 

d9009alycidon

Member
Joined
22 Jun 2011
Messages
982
Location
Eaglesham
Interesting comment on Facebook. I asked how long it would take South Lanarkshire Council to charge for parking at the new Hairmyers Station, as they had previously charged for parking at the old station. Reply I got was that parking would be free for the first year but the situation would be reviewed thereafter. I interpret that as you will be paying for parking in a years time.
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,592
Thanks for the link. Tried it out on EK bound. Traksy showing it at platform 2. RTT as platform 1 in RED. Need feet on the ground
Interesting. The diagram i drew Traksy from was almost certainly right, but I've got a feeling the signal numbers were largely reused so RTT may just not have been updated.
 

Dave1303

New Member
Joined
12 May 2025
Messages
1
Location
East Kilbride
Hairmyres Station looking good, but have noticed that the 201 services still terminates at the old station, and no busses appear to be using the new transport interchange! Seems crazy that the transport interchanges has no bus service to interchange with
 

N1

Member
Joined
10 Aug 2022
Messages
385
Interesting comment on Facebook. I asked how long it would take South Lanarkshire Council to charge for parking at the new Hairmyers Station, as they had previously charged for parking at the old station. Reply I got was that parking would be free for the first year but the situation would be reviewed thereafter. I interpret that as you will be paying for parking in a years time.
As I understood it the old station only had parking charges to try and deter people from using it for the Hospital etc. Lots of other South Lanarkshire stations have big P+Rs (Cambuslang, Newton) and don't charge so I think would be unusual for it to be added at Hairmyres new station
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Interesting. The diagram i drew Traksy from was almost certainly right, but I've got a feeling the signal numbers were largely reused so RTT may just not have been updated.
Put feet on the ground and the 1st train came in and checked RTT, whilst in the station, and it Flagged Up platform 2 as it should have and as was the case. Just did a check at 2200 on RTT and it is now showing as a RED 1 for that same very train and every other one. Now a very confused.com person
 

d9009alycidon

Member
Joined
22 Jun 2011
Messages
982
Location
Eaglesham
Hairmyres Station looking good, but have noticed that the 201 services still terminates at the old station, and no busses appear to be using the new transport interchange! Seems crazy that the transport interchanges has no bus service to interchange with
Doesn't First need to go through a formal process to alter a bus route? Possibly wanted to ensure that all the infrastructure was in place before making the change, would expect the 395 EK to Neilston to use the station too. Some negative comments on-line about the new junction layout at Redwood Drive/Eaglesham Road, this now is quite a sharp turn for large vehicles causing encroachment into other lanes, buses will find it tricky
 

Albaman

Member
Joined
16 Sep 2018
Messages
134
Doesn't First need to go through a formal process to alter a bus route? Possibly wanted to ensure that all the infrastructure was in place before making the change, would expect the 395 EK to Neilston to use the station too. Some negative comments on-line about the new junction layout at Redwood Drive/Eaglesham Road, this now is quite a sharp turn for large vehicles causing encroachment into other lanes, buses will find it tricky

According to the First Glasgow website, with effect from Sunday 15 June, 2025, the 201 will terminate at the new Hairmyres station.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
HAIRMYRES Some Non Railside Pictures from Sunday

== Doublepost prevention - post automatically merged: ==

More From Sunday
 

Attachments

  • 1 Hairmyres South Car Park 21-05-25.jpg
    1 Hairmyres South Car Park 21-05-25.jpg
    408.1 KB · Views: 173
  • 2 Station Roads.jpg
    2 Station Roads.jpg
    411.7 KB · Views: 166
  • 3  Bus & Station Interchange.jpg
    3 Bus & Station Interchange.jpg
    457.2 KB · Views: 167
  • 4  South Car Park.jpg
    4 South Car Park.jpg
    424.1 KB · Views: 174
  • 5  Transport Hub.jpg
    5 Transport Hub.jpg
    493.9 KB · Views: 170
  • 6  Shelters Resized.jpg
    6 Shelters Resized.jpg
    476.2 KB · Views: 183
  • 7  2J23 EKL-GLC 156435 21-05-2025.jpg
    7 2J23 EKL-GLC 156435 21-05-2025.jpg
    535.6 KB · Views: 182
  • 8 Whole Exterior of station Wed 21-05-25.jpg
    8 Whole Exterior of station Wed 21-05-25.jpg
    362.6 KB · Views: 185
  • 9 Entranse, Lifts & Staris.jpg
    9 Entranse, Lifts & Staris.jpg
    347.6 KB · Views: 178
  • 10 1st Day  Full Frontags.jpg
    10 1st Day Full Frontags.jpg
    534.2 KB · Views: 165
  • 11 Main Entrance.jpg
    11 Main Entrance.jpg
    219.4 KB · Views: 168
  • 12 Entrance.jpg
    12 Entrance.jpg
    359.8 KB · Views: 169
  • 13 Main station Building Resized.jpg
    13 Main station Building Resized.jpg
    438 KB · Views: 173
  • 14 South Car Park & Entrance.jpg
    14 South Car Park & Entrance.jpg
    514.8 KB · Views: 173
  • 15 North Car Progress.jpg
    15 North Car Progress.jpg
    560.7 KB · Views: 177

route101

Veteran Member
Joined
16 May 2010
Messages
12,281
Passed through Hairmyres today, was surprised to see Barriers at the station. I wonder if East Kilbride will get barrier. First suburban station to get barriers ? I suppose Motherwell has them.

Both platforms were in use today.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Passed through Hairmyres today, was surprised to see Barriers at the station. I wonder if East Kilbride will get barrier. First suburban station to get barriers ? I suppose Motherwell has them.

Both platforms were in use today.
Is there a staffed ticket office or is it just machines?
 

apjsco

Member
Joined
24 Feb 2024
Messages
19
Location
Glasgow
Passed through Hairmyres today, was surprised to see Barriers at the station. I wonder if East Kilbride will get barrier. First suburban station to get barriers ? I suppose Motherwell has them.

Both platforms were in use today.
I noticed the barriers on a previous set of photos and had wondered how they would work in a practical sense. How would they be staffed and what do you do when there’s an issue and there’s no one there?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,409
Location
Somerset
I noticed the barriers on a previous set of photos and had wondered how they would work in a practical sense. How would they be staffed and what do you do when there’s an issue and there’s no one there?
Presumably there’s a video link at the barrier - like at supplementary barriers elsewhere.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
I noticed the barriers on a previous set of photos and had wondered how they would work in a practical sense. How would they be staffed and what do you do when there’s an issue and there’s no one there?
Only staffed at Peak Times was told
 

apjsco

Member
Joined
24 Feb 2024
Messages
19
Location
Glasgow
Will this prevent boarding if you don’t have a ticket? That will present a problem for concession holders as the machines don’t vend them.
Looking at an image from OB23Gone's recent post (below), it looks like you could just access the platforms via the stairs and lifts and thus avoiding the gates altogether?
 

Attachments

  • 10 1st Day  Full Frontags.jpg
    10 1st Day Full Frontags.jpg
    534.2 KB · Views: 92

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Looking at an image from OB23Gone's recent post (below), it looks like you could just access the platforms via the stairs and lifts and thus avoiding the gates altogether?
Looking at an image from OB23Gone's recent post (below), it looks like you could just access the platforms via the stairs and lifts and thus avoiding the gates altogether?
That's correct you can. North side incomplete so cannot comment if it will be the same case.

== Doublepost prevention - post automatically merged: ==

Hairmyres TRACK SIDE Some Shots From Sunday & Wed WORTH THE WAIT looking very Good. Impressed especially when you see the twinning of the track through the station and the Loop Extension. But as said many times before on here due to a lack of funding a big missed opportunity to dual right through to a 2 platformed East Kilbride. On the Sunday there were a good many using the train services with more there just really interested in the finished product. Results were all very positive. Everyone and their friends and Grandchildren happily trying the lift on Platform 2 snapping away on phones and cameras and enjoying the view from the footbridge. Talking of Lifts The GIFFNOCK ones were still being worked upon on Tue 27th

== Doublepost prevention - post automatically merged: ==

More
 

Attachments

  • 1  Old Hairmyres Station Platform End Altered.jpg
    1 Old Hairmyres Station Platform End Altered.jpg
    449.5 KB · Views: 90
  • 2 2J24 From GLC.jpg
    2 2J24 From GLC.jpg
    582.3 KB · Views: 88
  • 3 To EK  From Footbridge With 2J24.jpg
    3 To EK From Footbridge With 2J24.jpg
    551.9 KB · Views: 87
  • 4  MAKES IT WORTH THE WAIT.jpg
    4 MAKES IT WORTH THE WAIT.jpg
    576.2 KB · Views: 89
  • 5 To EK From FB.jpg
    5 To EK From FB.jpg
    446 KB · Views: 90
  • 6  Light Wieght Booms.jpg
    6 Light Wieght Booms.jpg
    544.8 KB · Views: 89
  • 7  DSC_2571 2J03 156505 & 504 Sunday 18-05-2025 Resized.jpg
    7 DSC_2571 2J03 156505 & 504 Sunday 18-05-2025 Resized.jpg
    476.5 KB · Views: 88
  • 8  2J25 EK - Glasgow Central.jpg
    8 2J25 EK - Glasgow Central.jpg
    494 KB · Views: 82
  • 9  EK From FB Steps.jpg
    9 EK From FB Steps.jpg
    463 KB · Views: 84
  • 10 Station South Elevation From From East.jpg
    10 Station South Elevation From From East.jpg
    471 KB · Views: 83
  • 11 Looking West on platform.jpg
    11 Looking West on platform.jpg
    514.3 KB · Views: 80
  • 12 2J24 156495 & 431 GLC- EKL.jpg
    12 2J24 156495 & 431 GLC- EKL.jpg
    493.4 KB · Views: 81
  • 13  2J25 Wed 21-2025 156434 & 495.jpg
    13 2J25 Wed 21-2025 156434 & 495.jpg
    427.2 KB · Views: 87
Last edited:

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,498
Location
Moorpark, CA
That's correct you can. North side incomplete so cannot comment if it will be the same case.

== Doublepost prevention - post automatically merged: ==

Hairmyres TRACK SIDE Some Shots From Sunday & Wed WORTH THE WAIT looking very Good. Impressed especially when you see the twinning of the track through the station and the Loop Extension. But as said many times before on here due to a lack of funding a big missed opportunity to dual right through to a 2 platformed East Kilbride. On the Sunday there were a good many using the train services with more there just really interested in the finished product. Results were all very positive. Everyone and their friends and Grandchildren happily trying the lift on Platform 2 snapping away on phones and cameras and enjoying the view from the footbridge. Talking of Lifts The GIFFNOCK ones were still being worked upon on Tue 27th

== Doublepost prevention - post automatically merged: ==

More
Beyond Busby was never double: beyond the East end of the Hairmyres loop runs on embankment and cutting which were only ever built for single track, so it’s a monumental engineering task to double it. I think what’s there just now is all that can be reasonably accomplished.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
As far as I can tell:

the wires are up
the civil works on bridges are complete
the passing loops are complete
the station works are complete
the wires are not live

what’s left to do before electric trains can operate? The scheduled date of December seems a long way off.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,498
Location
Moorpark, CA
As far as I can tell:

the wires are up
the civil works on bridges are complete
the passing loops are complete
the station works are complete
the wires are not live

what’s left to do before electric trains can operate? The scheduled date of December seems a long way off.
Well, they need some trains for starters. I believe there’s a further three week shutdown in August, presumably to liven up and test the wires?
 