Interesting way of doing it. Coping at the top looks to be the same modern one as Nithsdale Road.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
Given the rate of progress it’s hard to believe we are over a year from completion of the project. The track lowering which has been suggested must be fairly extensive.
 

E400Lover101

Member
Joined
13 Apr 2023
Messages
68
Location
Glasgow

A few new images added to the 'Major works along the route 2024' section including:

- 2 images of artists impression of Busby station with a new footbridge without lifts.
- An image showing the reconstruction of the bridge at Westerton Lane.
- Finally an artists impression of Giffnock with an all access footbridge installed.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,498
Location
Moorpark, CA

A few new images added to the 'Major works along the route 2024' section including:

- 2 images of artists impression of Busby station with a new footbridge without lifts.
- An image showing the reconstruction of the bridge at Westerton Lane.
- Finally an artists impression of Giffnock with an all access footbridge installed.
How are they getting away without lifts at Busby?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,258
Unless its a case of under promise over deliver?
I was hoping that too. Having been badly burned by rail projects going massively over budget that sounds like a sensible approach if true.
You also don't gives contractor a deadline (entire artificial) that they can then use to escalate cost. If they see lots of extra time has been given between public completion dates and dates they see internally they get the message very quickly.
 

s55823ewj

Member
Joined
28 Jun 2024
Messages
40
Location
Greater Glasgow Region
Presumably because there is step-free access otherwise, albeit via a detour along the EK Road and under the railway line to get to the opposite side.
That seems like a bit of a mistake in the designs in my opinion - the East Kilbride Road is very narrow under the bridge and there's nowhere easy to cross. At Clarkston there's actually a fairly suitable way around, but they're adding lifts to Clarkston and not Busby? I do wonder if there might be space constraints though.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937

East Kilbride-Glasgow line to close for 16-week £140m electrification upgrade​

From January 2025, engineers will be working around-the-clock for 16-weeks to deliver major engineering works as part of the project to electrify the railway between East Kilbride and Glasgow.

The project, which is being delivered by Network Rail and is part of a Scottish Government investment in the line, will help to decarbonise rail services as well as improve reliability for passengers.

https://www.networkrailmediacentre....-for-16-week-gbp-140m-electrification-upgrade
 
Last edited:

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
From Press Release about 16 Week closeure. " The existing track will also be lowered at locations near Busby, Clarkston and Giffnock stations so that overhead line equipment can be accommodated under some bridges on the route.". So now we have the areas of the lowering but exactly where anyone definitely know??. Giffnock could be 2 ie Fenwick Rd. & heard that Church Road was close to the limit. Clarkson Rd Bridge is a deffinate , Strawhill Rd ? maybe. Busby has me wondering. The Station FB is being renewed, Westerton Lane OB32 replacement almost complete , the only other OB is OB31 at the end of Mast Lane. Told that this is to be removed but is not being reinstated. This is mich to the chargran of the locals and the Riding School as it is a nice circuit to use.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
Some wires are up. The return conductor / earth (not sure what it’s called now) is in place from Clarkston heading towards Busby.
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,693
the only other OB is OB31 at the end of Mast Lane. Told that this is to be removed but is not being reinstated. This is mich to the chargran of the locals and the Riding School as it is a nice circuit to use.
I'll keep my eyes peeled for an update of when it's removed. Using the access gate at the end of Mast Lane will be interesting once the bridge has gone as the only turning space is on the other side of the bridge!
 

d9009alycidon

Member
Joined
22 Jun 2011
Messages
983
Location
Eaglesham
Can't believe the amount of negative posts on social media where this info has been shared. Think they expect the line to be upgraded by waving a magic wand
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Thanks but that's for thornliebank, I was asking about thorntonhall and the road bridge at the station.
Sorry miss read the post wrong glasses on. Just the parapet, certainly at the moment. Not heard anything about track lowering there. The Fenwick Road bridge has some markings on the sleepers on either side of it which may indicate some work to be done there but nothing at Thorntonhall a couple of weeks ago
 

E400Lover101

Member
Joined
13 Apr 2023
Messages
68
Location
Glasgow
Photos of the OHLE in place at Clarkston 05/11/24
 

Attachments

  • 20241105_125729.jpg
    20241105_125729.jpg
    4 MB · Views: 153
  • 20241105_122648.jpg
    20241105_122648.jpg
    3.3 MB · Views: 150

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Thornliebank Rail bridge Work This weekend 09/10 Nov. 2024. The work consists of the installation of the roadside Parapets leading to the bridge. The works will be spread over 2 weekends. Installation is being carried out using a road crane. These side Parapets were built on the forecourt of the adjacent car wash. The other parts of the bridge were also built locally ie on vacant ground at the rear of Arden not far from Kennishead Station. So pictures of the finished bridge, the Parapet sections and the Arden manufacturing area
 

Attachments

  • 1 NR Artistic Image.jpg
    1 NR Artistic Image.jpg
    639.9 KB · Views: 131
  • 2  Side Panels.jpg
    2 Side Panels.jpg
    508.8 KB · Views: 131
  • 3 More side Panels.jpg
    3 More side Panels.jpg
    446.2 KB · Views: 121
  • 4 From Thornliebank.jpg
    4 From Thornliebank.jpg
    440.8 KB · Views: 122
  • 5  South Side.jpg
    5 South Side.jpg
    565.3 KB · Views: 122
  • 6 North Side of the Bridge.jpg
    6 North Side of the Bridge.jpg
    446.4 KB · Views: 119
  • 7   Thornliebank New Bridge Side Panels being Fabricated.jpg
    7 Thornliebank New Bridge Side Panels being Fabricated.jpg
    493.8 KB · Views: 113
  • 8  Bridge Beams.jpg
    8 Bridge Beams.jpg
    495.8 KB · Views: 116
  • 9 2  Bridges  2024-10-03.jpg
    9 2 Bridges 2024-10-03.jpg
    800.3 KB · Views: 133
Status
Not open for further replies.

Top