Out of interest, why does everyone have their "fast" London - Edinburgh service stopping at York?
You've got to slow to a near crawl if you wanted to go "non-stop" through York.
Out of interest, why does everyone have their "fast" London - Edinburgh service stopping at York?
You've got to slow to a near crawl if you wanted to go "non-stop" through York.
That's a shame.
Will there be an Edinburgh connection from the NNG terminators?
The Aberdeen's are as follows:
<...>
It's interesting to note the Skipton is booked as a HST despite the recent tests
.
<...>
Of course East Coast could easily apply for further changes but this is a highlight of changes to be expected.
Does anyone know the speed of the York avoiding line?
It varies going through the avoider, between 20 and 35mph.Does anyone know the speed of the York avoiding line?
Are the Bradford FS and Skipton services in yet?
Would suggesting that given the proven demand for the services, Sunderland, Bradford and the additional Hull services should be folded in to the EC franchise somehow (I don't know if there's any legal mechanism that could allow this- essentially you have to wind up HT and GC) to incorporate them properly in the clockface be unpopular?
Would suggesting that given the proven demand for the services, Sunderland, Bradford and the additional Hull services should be folded in to the EC franchise somehow
I'm still looking at what's been uploaded but I have seen one Skipton working booked as a HST hence my point about Skipton, HSTs and the recent tests.
I'm looking up Hull, Skipton, Bradford and Harrogate tomorrow not forgetting Glasgow of course.
Sadly I'm not important enough to have access to a TRUST terminal away from work, so will have to wait until tomorrow to check - you can't check the online planners as they only go up to 12 weeks and refuses to show the new timetable, of course once I find out I will post here as usual.

In other ECML news...
GC have a track access application in with ORR, requesting that all of their services call at Doncaster, under the new 'standard pattern timetable', both Sunderlands and Bradford:
http://www.rail-reg.gov.uk/upload/pdf/s22a_gc_23sa_application_form.pdf
They come up with various reasons why this is a good idea, while also claiming that it won't be primarily abstractive, which I guess they'll have to prove if there's to be any likelihood of it happening...
(Not exactly relevant to the ECML but they have also applied to run via Mirfield instead of Pontefract to speed up the Bradford route.)
In other ECML news...
GC have a track access application in with ORR, requesting that all of their services call at Doncaster, under the new 'standard pattern timetable', both Sunderlands and Bradford:
http://www.rail-reg.gov.uk/upload/pdf/s22a_gc_23sa_application_form.pdf
They come up with various reasons why this is a good idea, while also claiming that it won't be primarily abstractive, which I guess they'll have to prove if there's to be any likelihood of it happening...
(Not exactly relevant to the ECML but they have also applied to run via Mirfield instead of Pontefract to speed up the Bradford route.)
Don't they already run through Mirfield going between Brighouse and Kirkgate?
They do.
They've suggested it before (since Mirfield could allow easy access to Huddersfield and Dewsbury - both big places with no London/ECML service, connection to the Transpennine route), I think its a good idea.
Similarly, if we are going to have Open Access, then I think that a Doncaster stop on GC would be a good idea, especially as XC are planning on diverting half of their services away from Doncaster (with few Doncaster stops in the East Coast services to/from York) , though I'd rather this was done by GC getting more 180s to replace their HSTs, and all GC services were doubled south of Donny (the HSTs would be more use at XC). Maybe even a triple-180 with the Hull portion tooThat'll never happen though.
I'm waiting with anticipation
Many thanks.
I am sorry, I've been pre-occupied preparing new train running sheets to use on the station and as soon as I think I've finished, I encounter a another issue!
I believe I'm finally cracked the sheets however seeing as I'm now not back until early next week, I'm unable to tell you what you wish to know.
So while it is still outstanding, if I can find out sooner I will.
When do we get the finalised version of this?
When do we get the finalised version of this?
East Coast are being very quiet about this. Their website still says they'll be updating the Eureka section of thier site regularly but there's been no updates since June last year. There's a press release not in the Eureka section trumpeting the new 1733 Harrogate train but no mention of what happens to the Bradford train that currently leaves at this time. And very little else officially released.
Silentone suggested that other information for areas has been released for those in those areas that need to know but only provided a link to one example of this (and this seems to ignore informing those who travel to an area but don't live in it) and referred to the Harrogate train.
Presumably the timetables will start to appear in booking systems 12 weeks in advance if nothing else has been published.
Is East Midlands Trains Lincoln-London service still going to continue? If the East Coast service leaves Lincoln at 0720, that's only 12 minutes after the EMT service, which makes the EMT service (which takes nearly an hour extra to get to London) rather pointless.
Is East Midlands Trains Lincoln-London service still going to continue? If the East Coast service leaves Lincoln at 0720, that's only 12 minutes after the EMT service, which makes the EMT service (which takes nearly an hour extra to get to London) rather pointless.