TGV
Member
Well if that ain't the ugliest loco I ever saw...
I take your word for it, but I'll stick to my TGV's thanks! We don't need to re-gear to manage a puny 125mph...
Wonder what an Atlantique set would do on a KGX to Leeds run.
Probably suck down so much juice that nothing else for a hundred miles would be able to run
But seriously you might have shiny TGVs but I'd like to see you do as good a job as we do on railway that was designed more than 150 years ago rather than your railway which is what 50 years old?
50?!
Ummm.... 30. Je m'excuse.
A TGV on UK OLE? Ça ne marche pas.
If an MK3 set were to be found and refurbished then I'd assume it'd be to Mallard standard, which would hopefully make it easier to get the EMT set done!If EC did use a 90 I would assume it would be on the York semi fasts and would need:
1) Find, obtain, repair, refurbish and overhaul at least one Rake of Mkiii coaches
2) Find, obtain, repair, refurbish and overhaul a A Compatible DVT for each rake
3) keep to the following schedule, taking the 1601 rom York as an example:
York - 1601
Doncaster - 1624
Retford 1639
Newark 1654
Grantham - 1707
Peterborough - 1727
Stevenage - 17:57
Kings Cross - 1828
4) Find somewhere to stable and service. Do EC have the correct skills and facilities? (There is nowhere near York unless they run through to Heaton as you cant easily get to Neville Hill every night to maintain and stable) Can Bounds Green take the extra fleet?
5) Train up staff and drivers
6) Commision/test/work up said fleet
7) Publicise operations
8) Ensure sets have suitable or acceptable livery
9) Check timetbales and diagrams and crew rosters
10) Failure mitigation plans in place
then operate!
Are you also an engineer captainbigun? Mechanical or electrical?
I take your word for it, but I'll stick to my TGV's thanks! We don't need to re-gear to manage a puny 125mph...
![]()
Finally I don't see how a 90 will ever keep up acceleration or not because over 180 miles or more a 15mph speed differential is a lot and will more than make up for acceleration from a a few stations in 100 odd miles. In 4 mins a 91 would pull a mile ahead of a 90 doing 110 and I doubt better acceleration would pull even a mile ahead from a station, so add in the 180 miles or more duration of a journey and a 90 holding a 125mph time is nonsense. It'll hold to timetable time because of ridiculous padding and what's deemed as on time' which taken together allows about 15mins! Well given such slack well then obviously it would keep up. But in real time no chance.
Neither do the 89s!
However what would a TGV be like if faced with a heavy freight?!! Could it cope as well as the 89 would have done? Thats if the power car could even move on its own!!
BR changed the specification for rolling stock to run on the newly electrified ECML after the 89 had been ordered, so it basically missed its' calling in life right from the start. As the sole member of a class incorporating a whole host of different technologies to anything else operating at the time, it was always going to run into technical difficulties, as has been seen many times before with one-off prototype locomotives and rolling stock.I was referring to the 90s of the topic title. And how would a TGV cope with freight? That's a weird question. I don't think the 89 coped well with it's own existence. Otherwise there would be a fleet of them now. For whatever reasons (and in true BR style I suspect finances and investment were one reason) the class was a failure and the sole example itself hasnt exactly been a picture of success. I also agree with the post above that the uk does not have a 150 year old railway.
some folk are interested in the technical side and I'm happy to impart the info where I can.
I was referring to the 90s of the topic title. And how would a TGV cope with freight? That's a weird question. I don't think the 89 coped well with it's own existence. Otherwise there would be a fleet of them now. For whatever reasons (and in true BR style I suspect finances and investment were one reason) the class was a failure and the sole example itself hasnt exactly been a picture of success.
Just thought I mention a small update on this, spoke to a very reliable source who's basically said East Coast have refused to confirm or deny this rumour.
Whatever East Coast want to do, they are being very secretive about it.
Another update. EC seem to have now confirmed they will be taking a 90 on loan. Possibly first on a trial basis to see how best to use them.
The 91s apparently going through another heavy overhaul, similar to the one they got 10yrs or so ago.
This according to the latest Rail Magazine.
don't tke this the wrong way... while i understand accepting what is published in the press... RAIL is hardly the best place to look for facts...
if i were to read the same thing in one of the more reputible magazines i would believe it... but RAIL... friad not.
90027 going EC silver in the Toton paintshop shortly according to murmurs on the Farrow tour yesterday.
don't tke this the wrong way... while i understand accepting what is published in the press... RAIL is hardly the best place to look for facts...
if i were to read the same thing in one of the more reputible magazines i would believe it... but RAIL... friad not.
I must admit I'm getting fed up at the amount of errors in each issue though.. do they not employ proof readers?!Isn't the whole 'LIAR' thing just based on some bad gen that the magazine gave out in the early 90's or something... :roll:
Stick with your 'reputible' monthly mags if you like chap, but I haven't seen anything to prove that RAIL is anymore devoid of facts than any other publication nowadays.