It was in the lastest RUS, which would make it a hell of a lot easier to send freight along the Durham Coast line (which was the main reason for the resignalling in the first place). Goes to say that when more freight is sent along the route, the loop will be handy to allow a freight to be overtaken by a Middlesbrough train or a Metro.