Class 170101
On Moderation
- Joined
- 1 Mar 2014
- Messages
- 8,662
East West Rail is scheduled to open in 2019/2020. Could 321s or 360s (including 5 car versions) be used there?
Unlikely the scheme is moving to the right as per East West Rail Thread.
East West Rail is scheduled to open in 2019/2020. Could 321s or 360s (including 5 car versions) be used there?
Aren't 314s due to go as they aren't having Accesibility mods for post 2020 operation.
Some of the 321s to Scotland, reduced to being 320s to release/scrap the 318s or as extra capacity?
Without reading the rest of the 20 odd pages, could a solution for GA / Northern & FGW be found by releasing the 156s to Northern, Northern releasing 150/2s to Great Western - with GW holding onto some of the 143/153s until the swaps are available?
Without reading the rest of the 20 odd pages, could a solution for GA / Northern & FGW be found by releasing the 156s to Northern, Northern releasing 150/2s to Great Western - with GW holding onto some of the 143/153s until the swaps are available?
There's not enough of an age difference to make it worthwhile to replace 318s with 320/4s.
I think the reason that ScotRail got seven sets is because the leasing company had that number available at that point in time from London Midland. If there are DDA-compliant 321s that would be going to scrap otherwise it might be a good idea to take them on for the few years before the whole Mk3 EMU fleet will be replaced. If it would be necessary to spend money making them compliant then I wouldn't be so sure about that.
But they're not staying at Anglia under current plans. It appears that currently it's cheaper to buy new than refurbish old so what would be the business case for the latter option? Trains are after all just lumps of metal, plastic and glass and can be recycled and reborn as something else.
You've answered your own question; if you wouldn't make use of the DV capability, then what's the use securing them when the 321s are all available and also more reliable?
It would be a wise move for Scotrail to get their hands on around 16 321s then that would allow the 385s to be utilised on more appropriate routes rather than the Cathcart Circle, which is only getting the 385s so that the 314s can be made redundant as soon as.
Again, that's forgetting that there is a total of 70 Class 385 trains being ordered (of which there is a dedicated fleet of 24 4-car sets with first class for the E&G shuttle). This is designed to be enough to replace all of the 314s, the DMUs used on the newly-electrified routes and for the 380s to be concentrated on the western Glasgow Central electric routes. After the addition of the seven 320/4s on the remaining electric services there's no need for more EMUs before there is more electrification. Abellio got an option for 10 more 3-car 385s to be delivered in the second half of their franchise which should be enough for the suburban routes that can be wired within that timeframe - that is, Anniesland, East Kilbride and Barrhead.
Because the Fife Circle has been pushed back so far it will take a long time before new electrification will immediately require a large fleet of EMUs. The only medium-term requirement would be for a handful to run stopping services to Perth, Dundee and then up to Aberdeen (with long distance services requiring bi-mode stock so that they can run to Inverness and Edinburgh via Fife). These 385s will be freed up from the Cathcart Circle by the 318/320 replacement fleet that will be required around the middle of the 2020s.
Don't know honestly why they moving from a 4/8/12 railway to 5/10, just makes everything difficult.
23m vehicles are superior to 20m in a number of ways - seeing as the Class 345 specification changed from 10x20m to 9x23m, for example, I think that proves my point.
23m vehicles are superior to 20m in a number of ways - seeing as the Class 345 specification changed from 10x20m to 9x23m, for example, I think that proves my point.
23m vehicles are superior to 20m in a number of ways - seeing as the Class 345 specification changed from 10x20m to 9x23m, for example, I think that proves my point.
I don't think that was a TfL or Crossrail spec change, it was just Bombardier's solution to how best to provide a fixed formation train at 200m overall. I think their decision was most likely based on the ability to have 3 sets of doors per vehicle at that length.
Seems quite unbelievable now that the original ITT (that was available online at one stage) was for 100m units that could run singly in the off-peak...
Six and two threes, or in this case ten or two fives. Some trains will be easier to find a seat on, others less easy. With a new timetable and different unit diagrams anything could happen.
The main snag is where do they all sleep at night. Many stabling sidings are only 8 cars long.
Platform extensions and SDO. Essential, given that a 10-car formation will be roughly the length of a 12-car 379/317. It's be interesting to see how/what is applied at Shelford.
Great Chesterford should be easy (signals permitting). Newport ditto. Elsenham should be pretty easy. Harlow Mill not too hard. Roydon Up platform will be hard (probably need to be SDO) due to the river.
I'm not familiar with the Hertford East branch stations. Not sure about the Lea Valley stations either.
Broxbourne is a good point- only platforms 2&3 are 12-car, 1 & 4 are only 8-car.
By your descpription several of the short ones could be handled with SDO I think?
CR2, if it goes (as seems to be needed) 4 track from the portals at Tottenham to Broxbourne (to the junction for the Herford branch?) will need every Lea Valley station fundamentally rebuilt, and I'd expect something to be done to ensure there are no level crossings in the process.
Not having any 4s removes the temptation for the TOC to run 4s and save money (yes, you, LM).