Hi All,
Just o the west of Dudding Hill Jn is a crossover. Does anyone know if that is ever used? If so by what?
Ah, that crossover.
The whole of Dudding Hill junction was renewed over Christmas 2003. The weather was awful and everything that could go wrong did go wrong. The job overran by a whole week (not that anyone noticed). Even then that crossover wasn't done, and we had to go back a few weeks later to finish it.
As I was explaining all this to the (very bored) signaller, I asked him what used that crossover, as it would be out of use until we finished it.
"I've been here two years and never used it" was his reply. Therein started my crusade to challenge the use of every set of points in the renewal programme, as we had spent over £1m on renewing something that evidently wasn't needed.
I gather it was occasionally used to turn HSTs, and presumably could be used to get steam locos the right way in the event that one of them ever needed turning at St Pancras. I would imagine the points are swung more for maintenance checks than any service.
Thinking like yours means we don't have enough cross overs past Preston to allow proper single line working when something goes wrong (ie failed engineering train at oxenholme).
The point of those crossovers is for perturbation, just because it's not used for a couple of years doesn't mean it won't be needed...
Thinking like yours means we don't have enough cross overs past Preston to allow proper single line working when something goes wrong (ie failed engineering train at oxenholme).
The point of those crossovers is for perturbation, just because it's not used for a couple of years doesn't mean it won't be needed...
Thinking like yours means we don't have enough cross overs past Preston to allow proper single line working when something goes wrong (ie failed engineering train at oxenholme).
The point of those crossovers is for perturbation, just because it's not used for a couple of years doesn't mean it won't be needed...
Having said that, they seem to normally agree to the Network Change in the end, subject to sufficient compensation being on offer to make up for the loss of a facility they haven't used in years.Someone needs to tell the FOCs that then, they get proper aggrieved when one is proposed to be taken out.
And which can be a source of failure in itself.It's a awful lot of cash to spend as an insurance policy for something that rarely happens, and doesn't help much when it does.
Someone needs to tell the FOCs that then, they get proper aggrieved when one is proposed to be taken out.
Having said that, they seem to normally agree to the Network Change in the end, subject to sufficient compensation being on offer to make up for the loss of a facility they haven't used in years.
Tell me about it. But it has been the same individual in one of the FOCs for twenty years who gets uppity!
Oh, I know. It's just that the phrase "...should be entitled to compensation from Network Rail for the consequences of..." always seems to be in their acceptance letter.Doesn't work like that, that don't get "bunged" to accept.
Oh, I know. It's just that the phrase "...should be entitled to compensation from Network Rail for the consequences of..." always seems to be in their acceptance letter.
Someone needs to tell the FOCs that then, they get proper aggrieved when one is proposed to be taken out.
Will passenger services ever be reinstated on this line?
No reason to when you have the North London Line. Bear in mind that the two stations on the route closed in 1902.
No reason to when you have the North London Line. Bear in mind that the two stations on the route closed in 1902.
Doesn't work like that, that don't get "bunged" to accept.
--- old post above --- --- new post below ---
Ha, but he has forgotten more than a lot of people will ever learn if it is the person I think you mean!
However, the line is the only link from the Midland Main Line to cross-London links to the south and west and arguably deserves a fair degree of resilience.
Thank you all for the replies. As a supplementary question, Dudding Hill Jn signal box was enlarged at some point. The old photos show it without the east side extension. Does anyone know when that happened and the reason for it?
If there was a will, with forthcoming electrification of the GOBlin including the link at Carlton Road junction, could be supplemented with a further pair of lines through to West Hampstead, (I know, expensive boring through Hampstead Heath), the relief/goods lines could then fully relieve Gospel Oak to Willesden of much GW and possibly SWML freight.
Fanciful maybe, but bigger schemes have and probably will be seriously considered.

An EMT meridian set was turned on the down Cricklewood Curve-change ends-Dudding Hill Jcn- up Brent Curve ' Triangle' using this crossover on 18/07/2015 (5F81). The reason the cross over still exists is to facilitate these turning moves, mainly as the 'diamond' crossover on the main junction prevents some routes being taken. So you could also go Down Brent Curve - Dudding Hill Jcn-change ends-up Cricklewood Curve but you would have to use crossover to gain up Cricklewood line before diamond crossing.
Just out of interest what was the reason for turning the Meridian?
On a slightly more cheerful note...
While learning one of my first boxes a relief Inspector visited. During the general chat he asked Alf (my signalman/instructor) if he still wanted number 5 crossover. Alf said "No, take it out". I thought it a bit odd but Alf gave me a look that kept me quiet. A few days later Alf held the phone away from his ear and I could hear the Inspector ranting about the crossover being still in frequent use (i.e. at least twice an hour for turn-backs). Alf (who could be ever-so-slightly cantankerous) protested that the Relief Inspector hadn't asked him if the crossover was in use but whether he wanted it.
I guess that similar tales might have been told apocryphally - but I was there for this one... It gave Alf immense pleasure.
Happy days![]()