Just o the west of Dudding Hill Jn is a crossover. Does anyone know if that is ever used? If so by what?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,801
Hi All,
Just o the west of Dudding Hill Jn is a crossover. Does anyone know if that is ever used? If so by what?

Ah, that crossover.

The whole of Dudding Hill junction was renewed over Christmas 2003. The weather was awful and everything that could go wrong did go wrong. The job overran by a whole week (not that anyone noticed). Even then that crossover wasn't done, and we had to go back a few weeks later to finish it.

As I was explaining all this to the (very bored) signaller, I asked him what used that crossover, as it would be out of use until we finished it.

"I've been here two years and never used it" was his reply. Therein started my crusade to challenge the use of every set of points in the renewal programme, as we had spent over £1m on renewing something that evidently wasn't needed.


I gather it was occasionally used to turn HSTs, and presumably could be used to get steam locos the right way in the event that one of them ever needed turning at St Pancras. I would imagine the points are swung more for maintenance checks than any service.
 

Ships

Member
Joined
25 Apr 2013
Messages
338
Ah, that crossover.

The whole of Dudding Hill junction was renewed over Christmas 2003. The weather was awful and everything that could go wrong did go wrong. The job overran by a whole week (not that anyone noticed). Even then that crossover wasn't done, and we had to go back a few weeks later to finish it.

As I was explaining all this to the (very bored) signaller, I asked him what used that crossover, as it would be out of use until we finished it.

"I've been here two years and never used it" was his reply. Therein started my crusade to challenge the use of every set of points in the renewal programme, as we had spent over £1m on renewing something that evidently wasn't needed.


I gather it was occasionally used to turn HSTs, and presumably could be used to get steam locos the right way in the event that one of them ever needed turning at St Pancras. I would imagine the points are swung more for maintenance checks than any service.

Thinking like yours means we don't have enough cross overs past Preston to allow proper single line working when something goes wrong (ie failed engineering train at oxenholme).

The point of those crossovers is for perturbation, just because it's not used for a couple of years doesn't mean it won't be needed...
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Thinking like yours means we don't have enough cross overs past Preston to allow proper single line working when something goes wrong (ie failed engineering train at oxenholme).

The point of those crossovers is for perturbation, just because it's not used for a couple of years doesn't mean it won't be needed...

"Challenging" the purpose of a crossover does not automatically equate to removing it...
 

DerekC

Established Member
Joined
26 Oct 2015
Messages
2,438
Location
Hampshire (nearly a Hog)
Thinking like yours means we don't have enough cross overs past Preston to allow proper single line working when something goes wrong (ie failed engineering train at oxenholme).

The point of those crossovers is for perturbation, just because it's not used for a couple of years doesn't mean it won't be needed...

Yes, but every extra crossover adds cost and unreliability, not to mention complexity in the signalling. We should be aiming for the reliable railway that only needs crossovers for operational and planned maintenance reasons, not "just in case" ones.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,801
Thinking like yours means we don't have enough cross overs past Preston to allow proper single line working when something goes wrong (ie failed engineering train at oxenholme).

The point of those crossovers is for perturbation, just because it's not used for a couple of years doesn't mean it won't be needed...

But it's a different railway now. Firstly, complete train failures are thankfully relatively rare now, and much less common than even a decade ago; distributed traction / engines, multiple pantographs, better on board / remote monitoring etc. Freight locos are still a problem, but not like they were.

Lines are much busier. Putting in SLW can cause huge delays, not least whilst it is arranged and the right people are got to the right places. Even with bi-di it is not unusual for trains to be delayed 2hrs in a queue waiting to get past the problem. And in that time, the failure (or whatever the problem) can usually be got out of the way.

As has been said, such crossovers are a source of unreliability, particularly when used rarely. They also cost (now) well over £1m to renew, another £1m extra when the line is resignalled, and several hundred thousand to electrify / re-electrify (in AC). Then there's ongoing maintenance. It's a awful lot of cash to spend as an insurance policy for something that rarely happens, and doesn't help much when it does.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,682
Someone needs to tell the FOCs that then, they get proper aggrieved when one is proposed to be taken out.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,656
Location
Scotland
Someone needs to tell the FOCs that then, they get proper aggrieved when one is proposed to be taken out.
Having said that, they seem to normally agree to the Network Change in the end, subject to sufficient compensation being on offer to make up for the loss of a facility they haven't used in years.
--- old post above --- --- new post below ---
It's a awful lot of cash to spend as an insurance policy for something that rarely happens, and doesn't help much when it does.
And which can be a source of failure in itself.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,801
Someone needs to tell the FOCs that then, they get proper aggrieved when one is proposed to be taken out.

Tell me about it. But it has been the same individual in one of the FOCs for twenty years who gets uppity!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,682
Having said that, they seem to normally agree to the Network Change in the end, subject to sufficient compensation being on offer to make up for the loss of a facility they haven't used in years.

Doesn't work like that, that don't get "bunged" to accept.
--- old post above --- --- new post below ---
Tell me about it. But it has been the same individual in one of the FOCs for twenty years who gets uppity!

Ha, but he has forgotten more than a lot of people will ever learn if it is the person I think you mean!
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,656
Location
Scotland
Doesn't work like that, that don't get "bunged" to accept.
Oh, I know. It's just that the phrase "...should be entitled to compensation from Network Rail for the consequences of..." always seems to be in their acceptance letter.

I didn't mean to imply that they were being bought off.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,646
Location
Hope Valley
To get back to the original question, in general terms the provision of crossovers associated with the double junctions at each apex of a double-track triangle allows a train to be reversed and 'turned round'. This can be necessary for many reasons such as defective cab equipment or simply 'escaping' a points failure that has left a set of facing point lying the 'wrong' way for the next move.

It is fair to say that the process of reversing is rather time consuming, allowing for changing ends and also depends on adequate route knowledge that is difficult to maintain. Not too much of a problem for the odd light locomotive or on-track plant in a possession but of relatively little use on busy through routes.

In the particular case of Dudding Hill the lines are basically freight only (apart from occasional charters) and the number of trains that might benefit is relatively small. However, the line is the only link from the Midland Main Line to cross-London links to the south and west and arguably deserves a fair degree of resilience.

An alternative crossover exists only about a mile further west, at Neasden.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,272
Oh, I know. It's just that the phrase "...should be entitled to compensation from Network Rail for the consequences of..." always seems to be in their acceptance letter.

Those letters from one of the FOCs do seem to have a bit of a 'cut and pasted' look about them.

But I suppose, for example, that it must cost a bomb to officially remind every driver in the country that they won't be going to Weymouth Quay in future... :D
 

Ships

Member
Joined
25 Apr 2013
Messages
338
Someone needs to tell the FOCs that then, they get proper aggrieved when one is proposed to be taken out.

Having sat in on some of the network optimisation meetings NR OPs are similarly hesitant to remove such cross overs. Although I'm sure there has been more than instance just in the area I cover of maintainence plain lining a cross over without telling any one!

It's not just times of perturbation though, there have been issues with getting engineering trains/ tampers into the right place (in a sensible amount of time) due to the lack of cross overs.
 

Mutant Lemming

Established Member
Joined
8 Aug 2011
Messages
3,191
Location
London
No reason to when you have the North London Line. Bear in mind that the two stations on the route closed in 1902.

The areas it runs through have changed a little since then. A passenger service would be well patronised as it would take a lot of traffic off the very busy and exceedingly slow 266 bus route as well as create potential for links or through services to Heathrow from North West London, Herts, Beds etc as well as an inter airport link between Heathrow and Luton.
 

flappy8

Member
Joined
20 Feb 2016
Messages
48
Thank you all for the replies. As a supplementary question, Dudding Hill Jn signal box was enlarged at some point. The old photos show it without the east side extension. Does anyone know when that happened and the reason for it?
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
No reason to when you have the North London Line. Bear in mind that the two stations on the route closed in 1902.

I think that passenger transport demand has changed a little in 118 years. There has been occasional mention on here of the London Overground somehow making use of the Dudding Hill line. It would relieve the busiest part of the NLL and possibly provide another route from the Thameslink corridor towards Old Oak Common which is destined to become the major transport hub west of London. There is room to provide two additional platforms at either Cricklewood and/or Hendon independent of the MML/Thamelinlk traffic.
If there was a will, with forthcoming electrification of the GOBlin including the link at Carlton Road junction, could be supplemented with a further pair of lines through to West Hampstead, (I know, expensive boring through Hampstead Heath), the relief/goods lines could then fully relieve Gospel Oak to Willesden of much GW and possibly SWML freight.
Fanciful maybe, but bigger schemes have and probably will be seriously considered.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,330
Location
Herts
Doesn't work like that, that don't get "bunged" to accept.
--- old post above --- --- new post below ---


Ha, but he has forgotten more than a lot of people will ever learn if it is the person I think you mean!

I am very sure as to whom you refer .....:D
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
However, the line is the only link from the Midland Main Line to cross-London links to the south and west and arguably deserves a fair degree of resilience.

Disagree with this comment. There are links at Carlton Road Jn to Anglia and also the WCML via the Bedford to Bletchley line. Arguably it would be Chiltern lines that would become more isolated as the Neasden Link would lost if the line closed.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,330
Location
Herts
There was a Cricklewood - Victoria service - which ended a century ago - not just though it being unable to compete with direct buses and trams down the Edgware Road - but the route was key to providing freight services to and from the Channel ports for WW1. The same "cuts" package took off a lot of odd services via Blackfriars and the Widened lines (Woolwich - Moorgate for example)

Useless fact - but cavalry horses were moved from St Albans - Dover etc via this route - the (valuable) horses being fed and rested on open / common land near to where I am typing this and despatched by rail (which would have been a journey of about 5 / 6 hours and tolerable to the livestock.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,801
Thank you all for the replies. As a supplementary question, Dudding Hill Jn signal box was enlarged at some point. The old photos show it without the east side extension. Does anyone know when that happened and the reason for it?

Almost certainly in the Railtrack years, when there was a nationwide programme to provide half decent (i.e. some) welfare facilities. Toilets, that sort of thing.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
If there was a will, with forthcoming electrification of the GOBlin including the link at Carlton Road junction, could be supplemented with a further pair of lines through to West Hampstead, (I know, expensive boring through Hampstead Heath), the relief/goods lines could then fully relieve Gospel Oak to Willesden of much GW and possibly SWML freight.
Fanciful maybe, but bigger schemes have and probably will be seriously considered.

I've proposed the same thing for years, abet with underground platforms at Belsize Park for Northern Line Edgware branch interchange, (which, if coupled with a LO interchange at Tufnell Park/Junction Road, would go some way to relieving Camden Town station).
 

Supercoss

Member
Joined
5 Jun 2016
Messages
461
An EMT meridian set was turned on the down Cricklewood Curve-change ends-Dudding Hill Jcn- up Brent Curve ' Triangle' using this crossover on 18/07/2015 (5F81). The reason the cross over still exists is to facilitate these turning moves, mainly as the 'diamond' crossover on the main junction prevents some routes being taken. So you could also go Down Brent Curve - Dudding Hill Jcn-change ends-up Cricklewood Curve but you would have to use crossover to gain up Cricklewood line before diamond crossing.
http://bed-pan.homestead.com/73119-73213.JPG
http://bed-pan.homestead.com/DuddingHillDiagram.JPG
 

D Foster

Member
Joined
5 Jan 2016
Messages
152
Location
N Staffs
On a slightly more cheerful note...
While learning one of my first boxes a relief Inspector visited. During the general chat he asked Alf (my signalman/instructor) if he still wanted number 5 crossover. Alf said "No, take it out". I thought it a bit odd but Alf gave me a look that kept me quiet. A few days later Alf held the phone away from his ear and I could hear the Inspector ranting about the crossover being still in frequent use (i.e. at least twice an hour for turn-backs). Alf (who could be ever-so-slightly cantankerous) protested that the Relief Inspector hadn't asked him if the crossover was in use but whether he wanted it.
I guess that similar tales might have been told apocryphally - but I was there for this one... It gave Alf immense pleasure.
Happy days :)
 

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,906
Location
Richmond, London
An EMT meridian set was turned on the down Cricklewood Curve-change ends-Dudding Hill Jcn- up Brent Curve ' Triangle' using this crossover on 18/07/2015 (5F81). The reason the cross over still exists is to facilitate these turning moves, mainly as the 'diamond' crossover on the main junction prevents some routes being taken. So you could also go Down Brent Curve - Dudding Hill Jcn-change ends-up Cricklewood Curve but you would have to use crossover to gain up Cricklewood line before diamond crossing.

Just out of interest what was the reason for turning the Meridian?
 

nom de guerre

Member
Joined
24 Nov 2015
Messages
801
On a slightly more cheerful note...
While learning one of my first boxes a relief Inspector visited. During the general chat he asked Alf (my signalman/instructor) if he still wanted number 5 crossover. Alf said "No, take it out". I thought it a bit odd but Alf gave me a look that kept me quiet. A few days later Alf held the phone away from his ear and I could hear the Inspector ranting about the crossover being still in frequent use (i.e. at least twice an hour for turn-backs). Alf (who could be ever-so-slightly cantankerous) protested that the Relief Inspector hadn't asked him if the crossover was in use but whether he wanted it.
I guess that similar tales might have been told apocryphally - but I was there for this one... It gave Alf immense pleasure.
Happy days :)

Signallers, ever-so-slightly cantankerous? Surely not... :D
 