Draft Anglia route study published for consultation
http://www.networkrailmediacentre.c...s-for-growth-in-the-east-of-England-2190.aspx
http://www.networkrailmediacentre.c...s-for-growth-in-the-east-of-England-2190.aspx
Among the potential options for the Great Eastern main line identified in the study are:
To support the Great Eastern Main Line Taskforce's aspiration to reduce journey times between London and Norwich to 90 minutes, work is proposed to increase the line speed between Shenfield to Norwich to 110mph by upgrading track, signalling and overhead line equipment. Network Rail will also continue its work to close level crossings where it can to make the railway safer and increase linespeeds.
Additional platforms at Liverpool Street to increase capacity
Further upgrading signalling technology which means more trains can run on the existing network
Doubling of Trowse swing bridge this would help towards increasing capacity from Norwich to London as well as from Norwich to Cambridge
Installing a loop (new track) at Haughley Junction and Witham to separate passenger and freight services to help achieve faster journey times between London and Norwich
Further doubling of the Felixstowe branch line to accommodate the forecast increase in freight services
Among the potential options for the West Anglia main line identified in the study are:
Longer trains on the West Anglia Main Line. This would require platform extensions across this part of the network
Journey time improvements on the West Anglia Main Line
Other options include, adding two extra tracks to the West Anglia Main Line south of Broxbourne to increase capacity and doubling the single line tunnel to Stansted Airport
Among the potential options for the line from Fenchurch Street identified in the study are:
Adding extra carriages to existing services to meet passenger demand
Further upgrades at Fenchurch Street station to cope with passenger demand
The Anglia route study also looks at potential options to increase capacity on the North London Line and the line from Gospel Oak to Barking. These include additional platforms at either Gospel Oak or Barking and running longer trains on the North London line.