That’s not double blocking, just a protected overlap for WN543. Something similar happens with GMM399 at the end of Platform 2 at Motherwell (though, made more complex by the length of trains serving Motherwell).
If a train is approaching platform 2 and GMM399 is at danger, then it will be “approach controlled” by GMM423 which is just before the start of the platform. That is, brought almost to a complete stand, until it occupies the berth track circuit at which point GMM423 will clear to a proceed (normally a single yellow, unless a route has since been set straight through the station, see below). This has a couple of caveats though. Because GMM399 is not at the end of Platform 2, and anything more than about 9 carriages would overhang the end of the platform, if the train has not fully occupied one of the preceding tracks (which is the exact length of Plat 2 short of GMM399) to GMM423 without occupying one of the adjacent tracks at the same time, then GMM423 will not clear until the points ahead of GMM399, within its overlap, have been placed to Normal and GMM399 has been cleared to a proceed.
If the train is taking a route towards Uddingston (the Down West Coast Main Line), it is also required to lower Logan’s Road MCB-CCTV in order to get any proceed on GMM399. This means long waits at the crossing if an 11-car Pendolino, or LNER Azuma are sitting at Platform 2. It also means nothing can access Platforms 3/4 from Lesmahagow Junction because the train in Plat 2 is occupying the overlap, and technically fouling the junction (even though it isn’t really).
GMM399 will also not revert to danger until after 345TC (in the platform) has cleared (if the overlap track 343TC has been occupied simultaneousl), as the dispatcher would not be able to give the right away if the front of the train was now occupying the overlap and had returned the signal to danger (as would normally be the case).
Additionally, GMM399 is approach controlled for routes towards Mossend (Down Coatbridge, Down Braidhurst Loop). So even after passing GMM423, trains will still approach GMM399 at danger, even if the route is set, until they occupy 345TC in Platform 2.
It gets pretty complex when the signal cannot be sited with an adequate overlap.