haven't heard that, would be interesting to know more info if its trueAs an aside are the PPM's still available ? I thought I read there were problems with the company a while ago and the PPM's on the Stourbridge service had to be replaced by conventional DMU's . Anyone have an update ?
haven't heard that, would be interesting to know more info if its true
There would have to be a shift swap at some point during the day to achieve reasonable early start and late finish times.
20 minutes journey time each way with a short turnround at Gunnislake so an hourly round trip service would be easy with one unit locked in. For breaks a slightly longer layover could be created at Bere Alston if the journey time could be reduced by a couple of minutes. Then perhaps any booked turnround might be considered a 20 minute PNB perhaps?
thank youIt's not true. PPMs were still in operation this week, and are still manufactured new as well.
Significantly due to Plymouth, like Bristol, having its main station nowhere near the central commercial or shopping area, and therefore being beaten by the bus on almost all grounds. The former GWR is far and away the worst for this - even Paddington is the furthest out terminus in London, and the Heathrow Express narrowly escaped an Advertising Standards Authority judgement that it did not go to Central London as advertised, as Paddington is in the W2 postal area, not normally considered Central London.Plymouth, like Bristol, has very few local train lines and hardly makes use of the suburban stations it does have
Significantly due to Plymouth, like Bristol, having its main station nowhere near the central commercial or shopping area, and therefore being beaten by the bus on almost all grounds. The former GWR is far and away the worst for this - even Paddington is the furthest out terminus in London, and the Heathrow Express narrowly escaped an Advertising Standards Authority judgement that it did not go to Central London as advertised, as Paddington is in the W2 postal area, not normally considered Central London.
The former GWR is far and away the worst for this
Parry people movers on the Gunnislake branch![]()
Significantly due to Plymouth, like Bristol, having its main station nowhere near the central commercial or shopping area, and therefore being beaten by the bus on almost all grounds. The former GWR is far and away the worst for this - even Paddington is the furthest out terminus in London, and the Heathrow Express narrowly escaped an Advertising Standards Authority judgement that it did not go to Central London as advertised, as Paddington is in the W2 postal area, not normally considered Central London.
If the LSWR is reinstated back to Tavistock,would it be daft to suggest operating Bere Alston- Gunnislake with a Heritage dmu? It would save FGW a sprinter for use elsewhere. The former up platform & Callington bay platform are still there, albeit trackless..
On someones point about a PPM type unit, I know this ideas not on but could some kind of similar stronger solution be used? Or maybe they could operate a heritage EMU service e.g a shortened Class 313 or 315 using recommissioned 3rd rail?
Bere Alston station still has the three former platforms, only the old down one has track, the up island however is still perfectly intact, with buildings, the old signalbox, telegraph poles etc not only all in place but seemingly painted and maintained. As it is probably over 45 years since the current unstaffed halt layout came into being this is probably something of a record for the old Western Region, whose policy in the late 1960s seemed to be to demolish everything unwanted to ground level.
Given the unit would be "locked in" the branch, I think it would meet the rules, but there'd be a lengthy ECS move requires. Also is there a suitable heritage unit available, given ATW recently gave up on theirs?
According to walkit.com, Charing Cross to Paddington is 2.6 miles and Charing Cross to Kings Cross is 1.9 miles. Driving journey planners are less useful due to one way systems etc.
However if you destination is in the City, the distance from Kings Cross remains about the same but the distance to Paddington increases by a mile or more. Crossrail will do a lot to link Paddington better to the City and Canary Wharf.
Given the unit would be "locked in" the branch, I think it would meet the rules, but there'd be a lengthy ECS move requires. Also is there a suitable heritage unit available, given ATW recently gave up on theirs?
The point is they are all in central London - Zone 1 travelcard. If the GWR, LMS, LNER, GNER had by some miracle all have been building their London termini at the same time and had agreed a place in common to pool their resources and create a seamless interchange (a completely Utopian idea) then it would probably have been where Tottenham Court Road station is now - a station with 100 plus platforms, if you also extended the Southern, Southeastern and Lswr services. The lines from Paddington, Euston, Charing Cross etc feeding into this giant wen would mean no rooms for rows of shops, offices etc so the central London of today would never have evolved and people would have been moaning 'there's nothing when you get to London except a giant station with thousands of incomprehensible loudspeaker announcements and three hour queues at the ticket office while they sort out which of five different routes to Birmingham you want if you have the temerity to want to go right now and not having decided three months ago.'
Rant over. We are far better with the current London termini in situ, with the big exception, in my opinion, that Euston, St Pancras and Kings Cross should become one station if HS2 ever gets built, with a connection from it to HS1 and the possibility of non-stop through trains to the continent.
Why the ECS moves?
The unit could run out on a Monday morning, stay locked in on the branch all week and just run back on a Friday night for servicing over the weekend.
Fuel capacity shouldnt really be a problem and if it was then a small road tanker could refuel it on a Wednesday.
The stations were mainly built where the built-up area ended at the time, as even then it would have been hugely costly and disruptive to demolish large chunks of the capital city. Later arrivals such as the Midland faced that sort of problem in order to get as close to London as their competitors, but by then the railway was proven and sufficiently lucrative that the funds could be raised.
I believe the original idea was for the GWR to go into Euston (not sure if the collapse of this plan led in some way to them ending up relatively far out at Paddington?). And perhaps Kings Cross could have been put a bit further west. But it that had happened it would have unravelled very quickly as none of the companies would have had any space to expand.
The remoteness of Paddington was one of the main reasons the Metropolitan Railway was built.
Sounds a bit of a waste of a train 'locking it in' on the Bere Alston - Gunnislake section of the Branch line!
It could bounce between the two stations all day every 45 minutes, with a rest for the driver's tea /lunch breaks. A replacement crew would have to travel to Bere Alston to relieve the early shift.
With 2 more trains the best service Plymouth to Tavistock would struggle to do an hourly service at Bere Alston.
With changing trains at Bere Alston, the Gunnislake service could lose traffic?
I really don't see the need to shut the Gunnislake unit inside all day. Even if St Budeaux to Tavistock was operated as a single NSTR section (with an intermediate instrument at Bere Alston), there should be time to nip the Gunnislake unit between St Budeaux and Bere Alston during the Tavistock unit's turnaround at Plymouth. It wouldn't take much to provide an NSTR section as far as Bere Alston, then OTW sections to each of Gunnislake and Tavistock from there, to provide a lot more flexibility.
I really don't see the need to shut the Gunnislake unit inside all day. Even if St Budeaux to Tavistock was operated as a single NSTR section (with an intermediate instrument at Bere Alston), there should be time to nip the Gunnislake unit between St Budeaux and Bere Alston during the Tavistock unit's turnaround at Plymouth. It wouldn't take much to provide an NSTR section as far as Bere Alston, then OTW sections to each of Gunnislake and Tavistock from there, to provide a lot more flexibility.
I really don't see the need to shut the Gunnislake unit inside all day. Even if St Budeaux to Tavistock was operated as a single NSTR section (with an intermediate instrument at Bere Alston), there should be time to nip the Gunnislake unit between St Budeaux and Bere Alston during the Tavistock unit's turnaround at Plymouth. It wouldn't take much to provide an NSTR section as far as Bere Alston, then OTW sections to each of Gunnislake and Tavistock from there, to provide a lot more flexibility.