civ-eng-jim
Member
When first proposed by the developers (forgotten their name) there was a draft timetable which showed the proposed services... I believe a link was posted on this website... Tavistock trains were patched around the existing Gunnislake trains...
Has the proposed service changed from that originally proposed???
They're 6 years old but try these documents:
http://www.kilbridegroup.com/tavistock/docs.asp