Gloster
Veteran Member
My recollection is that brake tenders were only used on the LM Midland Lines and in the North East.
I think I have seen photos of them on the Southern Region, both going through Clapham Junction and in north Kent.
My recollection is that brake tenders were only used on the LM Midland Lines and in the North East.
I think I have seen photos of them on the Southern Region, both going through Clapham Junction and in north Kent.
Is your statement based on published fact or are you simply assuming? Maybach were happy to make all the components for the 63 engines for the Anglicised Warships, including the engines assembled by the UK. Similarly the early Hymek engines incorporated parts supplied from Germany. So why say parts made in Germany wouldn't have fitted?The British made engines and transmissions would have been built to Anglicised drawings using imperial sizes and threads, not the metric of the German made ones.
The cost of retooling the German production lines for a relatively small number of machines would have been prohibitive
With the benefit of hindsight:
- Steam should have been phased out more gradually
- There should have been more time spent on trialling the prototype diesels, to work out what was worth pursuing and what should be discarded
- Westerns and Hymeks should have been retained on the WR for longer
- The 1974 post WCML electrifiction cascade of class 50s to the WR could have been avoided, with the 50s taking over North Wales / Trans Pennine / Cross Country services instead, allowing 47/4s to go to WR for the new air-con Mk 2 stock.
- Fewer class 25s and class 31s should have been built
- Money saved by building fewer diesels should have been used on electrification
50s were only built as 47s not up to the job on WCML north of Crewe. Perhaps should have had 512 50s and no 47s?!!!!!There were 50 Class 50s; only about half of those would have been plenty for Trans Pennine / North Wales / Cross Country. What would have you done with the others ? In fact, and again in retrospect, perhaps the 50s should never have been built ?
Sadly, I think hydraulics were doomed for a short life on passenger services once it had been decided to introduce AirCon coaches, especially when locos were becoming spare after introduction of HSTs, and decline in some other traffic levels at that time.
With the benefit of hindsight:
- Steam should have been phased out more gradually
- There should have been more time spent on trialling the prototype diesels, to work out what was worth pursuing and what should be discarded
- Westerns and Hymeks should have been retained on the WR for longer
- The 1974 post WCML electrifiction cascade of class 50s to the WR could have been avoided, with the 50s taking over North Wales / Trans Pennine / Cross Country services instead, allowing 47/4s to go to WR for the new air-con Mk 2 stock.
- Fewer class 25s and class 31s should have been built
- Money saved by building fewer diesels should have been used on electrification
Sadly, I think hydraulics were doomed for a short life on passenger services once it had been decided to introduce AirCon coaches, especially when locos were becoming spare after introduction of HSTs, and decline in some other traffic levels at that time.
50s were only built as 47s not up to the job on WCML north of Crewe. Perhaps should have had 512 50s and no 47s?!!!!!
Hydraulics were doomed before the aircon stock. They were deemed non standard in the late 60'sThere were 50 Class 50s; only about half of those would have been plenty for Trans Pennine / North Wales / Cross Country. What would have you done with the others ? In fact, and again in retrospect, perhaps the 50s should never have been built ?
Sadly, I think hydraulics were doomed for a short life on passenger services once it had been decided to introduce AirCon coaches, especially when locos were becoming spare after introduction of HSTs, and decline in some other traffic levels at that time.
Which had exactly the same effect in terms of capacity and saved some fuel...One solution would've been to convert BGs to generator vans to work with non-ETH locos. It was considered and indeed tested by the Eastern Region in the late-1960s when switching from steam heat Mk1/2 formations to all electric heating on its best trains.
In the event the Eastern decided to accept converting it's 47s and 55s to ETH and to reduce formations by one carriage to compensate for the reduced traction power.
I believe it was a cyclonic filter, so with hindsight they should have been called Dysons.I'm not sure the 50s performed so admirably, while 8 diagrams were paired on Anglo-Scottish services to allow accelerated timings, in practice poor availability often mean only a single loco could be provided.
I think part of the issue was many of the new features and electronics they had pre-refurb. The control system and indeed the air filtration system which gave them their "Hoover" nickname being particularly items for consternation by all accounts.
so with hindsight they should have been called Dysons.

I have long thought that one problem with retaining steam into the 1970s would have been staffing. Not so much the high profile job of driver, but those ancillary jobs such as as coalman, ashman and even cleaner. Would many young men in the Swinging Sixties, the era of the white heat of technology, been keen on a shift job that in twenty or more years would allow them to be a driver?
All BR needed to do was buy plenty of class 33's and class 101 DMU's. Nothing else (electrification apart).With the benefit of hindsight:
I'm not convinced quadruple-headed 33s would have been a sensible HST substitute.All BR needed to do was buy plenty of class 33's and class 101 DMU's. Nothing else (electrification apart).
Long production runs of single types giving economies of scale in production and minimised operational costs.
The class 33 had good route availability and sufficient power for most operational needs. For higher power needs simply double head.
You could tweak the class 101 furnishing ( and possibly doors) to meet different market needs but keeping the key benefit that any driver could drive, and depot maintain.
Another class that should have been re-engined with an EE V12? Not being serious by the way!Class 33 ETH capability wasn't up to working with Air Con stock.
Class 33 axle load meant it wasn't suitable for the secondary lines in Scotland.
Bad experiences with the Sulzer engine in 47s ended up in a permanent downrating, so trying to get more power out of a 33 (to work a greater ETH load) wasn't really viable.
So a bigger build of 33s wasn't really an option.
True, but I was responding to CW2's post which seemed to cover the pre-HST era.I'm not convinced quadruple-headed 33s would have been a sensible HST substitute.
Not sure about this. For example the 33 had the same route availability as the 24's and 26's which seemed to get to most places in Scotland.Class 33 ETH capability wasn't up to working with Air Con stock.
Class 33 axle load meant it wasn't suitable for the secondary lines in Scotland.
Bad experiences with the Sulzer engine in 47s ended up in a permanent downrating, so trying to get more power out of a 33 (to work a greater ETH load) wasn't really viable.
So a bigger build of 33s wasn't really an option.
I know your post is tongue in cheek but on a serious note there is the fact BR got Riddles as CME to oversee the development of the Standard steam loco types. Then we hit modernisation and all bets are off.All BR needed to do was buy plenty of class 33's and class 101 DMU's. Nothing else (electrification apart).
Long production runs of single types giving economies of scale in production and minimised operational costs.
The class 33 had good route availability and sufficient power for most operational needs. For higher power needs simply double head.
You could tweak the class 101 furnishing ( and possibly doors) to meet different market needs but keeping the key benefit that any driver could drive, and depot maintain.
That's true - I must have been mistaken.Not sure about this. For example the 33 had the same route availability as the 24's and 26's which seemed to get to most places in Scotland.
Which had exactly the same effect in terms of capacity and saved some fuel...
To be fair most long-distance coaching rakes had a BG anyway, but yes pretty much.
Passenger rakes with a BG only became common from around the 1970s or 1980s onwards. Prior to that, most trains would have a BSK (or BSO, BFK, BCK etc.) at one end -- or on both ends for long formations.
On looking at the Harris Mk2 book, looks like I misrecalled it was Mk2 BSO which the ER converted to ETH generator van not a Mk1 BG
I agree with you completely. In 1948 the Railway Executive (RE), the agency of the British Transport Commission which was responsible for the railways, did not understand that the world had changed dramatically from that of 1939.Helvellyn said:
"I know your post is tongue in cheek but on a serious note there is the fact BR got Riddles as CME to oversee the development of the Standard steam loco types."
It's also interesting to wonder what might have happened if modernisation was considered straight after nationalisation.
Maybe instead of the Standard range of steam classes there would have been about 500 LMS 10000s or Southern 20000s (and perhaps at least as many Class 40s and 44s given the preference for the leading axle??).
The Western Region would probably have still looked to find their own solution, that would hardly have been a surprise and the hydraulics would have looked even more attractive.