1018509
Member
If it did were the locomotives run round the train at Reading or did another locomotive take over.
In steam days, what type of locomotives used to work the service?
I think from Manchester it would have been something like a Black 5 then there was a loco change at Oxford where a Bullied Pacific would take over. Not sure if it was actually booked to call at Reading though as I've seen photos of it with the Southern loco on going round the west chord of the Reading triangle. It was definitely routed away from the S&D line in '62 by the Western Region, who'd taken over that line back in '58.
Just remembered - I'm sure I've seen photos of it at Oxford with a WR Hall up front before the SR Bullied took over.
![]()
In steam days, what type of locomotives used to work the service?
Not sure about that (ie still being called the Pines Express after 66), there's no mention of the name in the 1967 timetable.
In steam days, what type of locomotives used to work the service?
the whole point of diverting the Pines Express from the S&D was the desire to deselise the service, as the S&D would need upgrade to the infrastructure to cope with diesel traction, the money was not spent and the Pines was diverted. Without the Pines express the S&D was then for the chop under Beeching like the former LSWR west of Salisbury without the Atlantic Coast Express
Spot on.Sorry, the above is just rubbish. The line did not require upgrading to cope with diesel traction, the Pines was diverted away purely as a precursor to the lines closure. You gave the real reason for the lines closure, it had nothing to do with the line needing upgrading for diesel.
Spot on.
And don't forget, the Pines was not the only through service to run via the S&D. On a summer Saturday the line would be almost full to capacity with holiday trains to and from the North of England and Midlands.
When the WR took over all these were diverted away from the line to help strengthen the case for closure.