I'm a bit confused by the need to run all of these trains to Denton/ Reddish just to free up space at Manchester Victoria though.
Like I said in another thread, having services terminating at Victoria which approach from the East aren't really an issue, it's the number of services terminating at Victoria which approach from the West, due to having to use through platforms.
As the Calder Vale services are likely to be extended beyond Victoria, this will mean new services from the Denton line could terminate there. However, that doesn't mean we can introduce a lot of new services to Victoria without moving the current gridlock from Ardwick a couple of miles north, which would then defeat the point of sending TPE services to Victoria.
--- old post above --- --- new post below ---
True - its an outrage that Denton doesn't have a direct service yet - presumably there will be calls in the Tameside Reporter for some HS2 services to be diverted via Reddish South before long?
Joking aside Manchester Airport services (both bus and rail) need addressing. When people from places less than 20 miles away from the Airport need to take an indirect route and change, while people from places 100+ miles away can get a fast direct train, something's not right.
Post Ordsall Chord all 4 central Manchester stations will have a direct Airport service, even if all Airport services become local services that would put Manchester in a better position than London for onward travel to Airports.