"Blackpool North – Manchester Airport: On quieter services, some trains will run as 4 carriages instead of 6."
So a single 4 coach 331 rather than a pair of 3 coach units or planned to be a 319?
Likewise for Liverpool - Manchester Airport stoppers, although a 4 coach 331 doesn't offer that many more seats than a 323 due to the more low density layout.
From previous threads I've read apparently they're swapping 12 331/0s from the north west for 12 331/1s from the north east to replace the 319s, and then the 323s from the West Midlands will be operating all over? I'm hoping they keep the Manchester to Blackpool service as 331s considering the lower top speed of the 323s (it's 10mph less but still annoying) unless they plan on modifying the 323s to reach 100mph but I highly doubt they will do. The only route from Bolton that I'd accept 323s on is the local stopper between Southport (probably changed to Wigan NW once electrified) and Stalybridge as the distance between stations is so close that you can't exactly reach such speed.
I've moaned about this in the past but 331s have wider vestibules and doorways for both additional luggage space and standing room. The single seats on a 323 next to the toilet would be nice to not have to sit next to someone when the train is busy though! Standing room would be way more cramped though as the doorways didn't seem as wide last time I was on one. As a regular user of the Airport to Blackpool service I have to admit I would like the variety though as the 331s have gotten a bit of the same thing since they've solely operated the line since around 2021. I'll be commuting to education by train soon and wouldn't want to be packed in like sardines but denser seating capacity on the 323s (with 3+2 seating) would be a lot nicer but I like the tables on the 331s
Very disappointing. One moment, Northern are celebrating Bolton to Piccadilly as their
3rd largest commuter flow, next they're downgrading capacity. I wonder which diagrams Northern class as "quieter".
Yeah I did read about that, surely if trains are overcrowded then people will stop using the train to commute? I'm guessing the diagrams that are timed so the 4 car avoids clashing with peak times (so in the morning it'll operate a service from Manchester Airport to Blackpool and then in the evening it runs from Blackpool to Manchester Airport going against the flow of commuters)
But another thing... I know this is probably impossible at most other stations on the line but when Buckshaw Parkway station opened it was opened with the possibility of 8 car trains stopping there in the future:
https://www.railengineer.co.uk/buck...omes-the-latest-addition-to-the-rail-network/
The platforms are 150m long to allow 6-car formations to use the station. The planning permissions and construction details permit future extension for 8-cars.
This could potentially allow for /1+/1 formations in the future if infrastructure at other stations is suitable and there are enough spare units to cover for the lack on other services. I've seen double 319s on Northern with the rear half locked out before but it could work on this line. The ASDO of the 331s would also prove very useful in this scenario. The only issues I can think of are the platforms at Chorley being unsuitable for extension (lift installation one end, bridge another) and Manchester Piccadilly platform 14 being on too much of a curve to see the full train end to end - I know Avanti services diverted via Manchester have had to run through non-stop as the curve prevents the trains being dispatched safely
Liverpool - Manchester Airport are currently almost all 3 coach 323s or 331s except on Sundays, and often overcrowded even at off-peak hours. Definitely needs a more frequent service, or bigger trains.
Newton-le-Willows station currently only has the capacity for 4 cars currently, correct? I know they're planning to extend the platforms at a lot of their stations (
https://media.northernrailway.co.uk...ers-thanks-to-gbp-60m-platform-extension-work) and NLW will undoubtedly be included with the frequency of services so potentially they could use 6 car trains on that line once the platforms are long enough to accommodate them.