Southern Dvr
Member
- Joined
- 13 Oct 2010
- Messages
- 988
The same journey can be made just with a painless level change at Greenford.
Really it’s astonishing it’s lasted until now.
Really it’s astonishing it’s lasted until now.
Not really. It's a parliamentary service.The same journey can be made just with a painless level change at Greenford.
Really it’s astonishing it’s lasted until now.
*Applauds*Not really. It's a parliamentary service.
That was specifically addressing the 033x departure from Blackpool as present, which remains even when all the other middle of the night departures have long been scrapped.There have been middle of the night Manchester<->Blackpool services for years, right back to North West Regional Railways or earlier. They may have lasted for the reason noted, but that isn't why they existed.
I think that if this happened - and a platform(s) at Greenford were included in that plan, the Branch could likely close to passenger services without much impact. And mitigate against the OOC/North Acton lack of 'rail-side' connection.With the route not being cleared for DOO, it was never a particularly practical diversionary route anyway. I think the most you could hope for would be for the Chiltern platforms at Old Oak Common to be built, but that's still many years away from fruition.
One that never made sense.Not really. It's a parliamentary service.
The curves linking Chislehurst & St Mary Cray get an improved service, rather than being mainly peak time only (and a bit cheaper to do as they are first stop Swanley rather than Rochester).Any other "rare track" lost this December?
Anything gained?
TIA
Looks like there are no longer any passenger services over the Darlaston Jn-Pleck Jn curve (the direct route between Wolverhampton and Walsall). There is currently a Saturdays-only Wolverhampton to Rugeley Trent Valley service which does this curve.Any other "rare track" lost this December?
Anything gained?
TIA
Chislehurst curves - Got!The curves linking Chislehurst & St Mary Cray get an improved service, rather than being mainly peak time only (and a bit cheaper to do as they are first stop Swanley rather than Rochester).
I'm sure someone would have done a comparison to see what unusual track is lost and what is gained outright, what unusual track becomes harder and what will become easier.
I believe the Saturday morning Birmingham - Crewe service which used to avoid Wolverhampton now goes via Wolverhampton.
Darlaston to Pleck - Need!Looks like there are no longer any passenger services over the Darlaston Jn-Pleck Jn curve (the direct route between Wolverhampton and Walsall). There is currently a Saturdays-only Wolverhampton to Rugeley Trent Valley service which does this curve.
There are the usual Caledonian Sleeper diversions via Primrose Hill in order to run via the ECML - but notably, these operate for a much longer period this year, from mid-February until the end of the timetable on Friday and Sunday nights, in addition to the usual 2 weeks in March on Monday-Thursday nights. This is due to engineering work at Carstairs.
The line between Gainsborough Central and Barnetby via Brigg regains its service - 3 trains each way on Saturdays, as pre-Covid.
What about SWR via LU stations between Putney and Wimbledon?Chislehurst curves - Got!
Portobello Jn to Bescot - Got!
Crane St to Portobello - Got!
Bushbury to Portobello - Need!
== Doublepost prevention - post automatically merged: ==
Darlaston to Pleck - Need!
South Hampstead to Camden Road - Got!
Camden curves to ECML - Need!
Gainsborough Trent to Wrawby - Got!
You mean:What about SWR via LU stations between Putney and Wimbledon?
What's with all these "needs"? I thought you had yellow-penned the entire passenger network?You mean:
Point Pleasant Jn to East Putney - need!
Oh, and referring to earlier in the thread:
South Greenford to South Ruislip - got!
What's with all these "needs"? I thought you had yellow-penned the entire passenger network?
Only 2L10 and 2L77 Waterloo - Basingstoke Mon - Sat and 1B01 Sun AM go via East Putney, which remains the same in December.You mean:
Point Pleasant Jn to East Putney - need!
Oh, and referring to earlier in the thread:
South Greenford to South Ruislip - got!
Good luck with that; even when it's nominally running it's usually cancelled.Longest gap for me has to be Clitheroe to Hellifield (13 miles 46 chains).]
Yes, I wasn’t sure what the specific junctions were called at each endYou mean:
Point Pleasant Jn to East Putney - need!
185sForgive me if this has been asked before but what stock will the Liverpool-Hull TPE services use from December?
Much appreciated that I had a feeling it would be 185s, assuming the Mk5/68s will be on the Manchester-Scarborough and Liverpool-Cleethorpes.185s
I think the point is that the empty stock working track to Ardwick rather than anywhere else and it fits the traincrew knowledge.Much appreciated that I had a feeling it would be 185s, assuming the Mk5/68s will be on the Manchester-Scarborough and Liverpool-Cleethorpes.
The Greenford shuttle is already very poorly patronised, so this service had been on the cards to be removed for some time. As above, it doesn't really serve any practical purpose.
Same for me.Black biro, please!
Well, I've done the entire "Normal" everyday network, just a number of entries listed at PSUL left to do.
Longest gap for me has to be Clitheroe to Hellifield (13 miles 46 chains).
Are there many others you can think of!It’s not the only one!
Well they ran during Covid. What used to happen was obviously things stopped at Chelsfield and Orpington was only achieved through stopping local trains. This idea smacks of bad judgement on the grounds that Orpington commuters will just fill up faster trains.Just been looking at the changes page on Southeastern's website and they say that "there will be, for the first time for many years, a half hourly fast service in the morning peak from Orpington to London Charing Cross, and in the evening peak from London Charing Cross to Orpington."
When was the last time such services ran?
Dave
When did Hastings trains stop calling there?Just been looking at the changes page on Southeastern's website and they say that "there will be, for the first time for many years, a half hourly fast service in the morning peak from Orpington to London Charing Cross, and in the evening peak from London Charing Cross to Orpington."
When was the last time such services ran?
Dave
Historically not many fast trains stopped at Orpington in the peaks. Down trains typically ran fast from Waterloo East or London Bridge to Chelsfield, Sevenoaks, Tonbridge or even High Brooms. I've never understood why they stopped at Chelsfield rather than Orpington.When did Hastings trains stop calling there?