The only explanation for the current state of the Stranraer rail connection is deliberate running down with a timetable designed to discourage users.
And with the new terminal opening next month the rail connection traffic is effectively at an end.
Who is going to get off a coach at Ayr to travel to Glasgow when they can simply stay on the coach for another hour or less if it runs non-stop via the motorway?
The Ayr service will run but I predict it will carry mainly local passengers.
The main foot passenger link will now be the express coach links with rail irrelevent.
The question now is what is the Girvan to Stranraer line for?
It has become irrelevent to local transport needs with an inconvienient and very sparse timetable.
There is potential there but it would need a dynamic personality like say the guy in charge of Chiltern.
The Stranraer rail service has historically been timed for ferry connections; Stena have made this difficult by continually changing ferry times with full knowledge that "the railway" cannot do the same mid timetable, and without any meaningful consultation.
With regard to who is going to get off the coach at Ayr - anyone with a rail-sail ticket, because their coach will not go beyond Ayr! That will include the pax that don't just need to end up in Glasgow or Edinburgh, but have further rail travel in their journey.
With the exception of football traffic the "main foot passenger link" on the NI to Stranraer/Cairnryan ferries has for some time now been the Belfast-Glasgow/Edinburgh and Birmingham/London coach services.
The rail link from Stranraer is most certainly NOT irrrelevant to local travel needs. The first bus from Stranraer to Ayr does not arrive in Ayr until 0943 after a 126 minute journey. This is useless for the many students at Ayr College and others working in Ayr. Return journeys are of similar length.
The service specification for the line is set by Transport Scotland; it doesn't matter who runs whichever TOC on the Scotrail franchise, they can't change that and in any case would have to work within the cost constraints of that specification.
--- old post above --- --- new post below ---
Err has nobody heard of Ardrossan, Gourock, Oban and the Jewel in the crown of Rail-Steamer (sorry ferry!) interchanges Wemyss Bay!
Err, last time I was at Ardrossan I don't remember seeing a ferry terminal right next to the station............................