So interesting times ahead, well for the next 5 months! with TFL turning at Brentwood, and a bus shuttle to Shenfield (10 mins allowed for the run)
No OHL in place until May, and of course some of the connections twixt the old 'E' lines and 'M' lines out of use, at least until May, so 2 track railway, Shenfield - Gidea (minimum)
No OHL in place until May, and of course some of the connections twixt the old 'E' lines and 'M' lines out of use, at least until May, so 2 track railway, Shenfield - Gidea (minimum)
