Crossrail progress

Status
Not open for further replies.

G_A_C_C_C

Member
Joined
11 Dec 2008
Messages
127
Location
High Wycombe
The "Near you" map on the Crossrail website has been updated today (27th)and now shows Phyllis having -0.17 km remaining.

Surely this means the first of the tunnels is now dug and lined?

But I would have expected to have seen some serious press and Boris photo opportunities at such an accomplishment.

Anyone got any further info?

Does anyone know how this Phyllis and Ada (and Victoria and Elizibeth coming the other way) are to be removed from the ground? Is there a hole at Farringdon?

Graeme
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,495
Location
DTOS A or B
The "Near you" map on the Crossrail website has been updated today (27th)and now shows Phyllis having -0.17 km remaining.

Surely this means the first of the tunnels is now dug and lined?

But I would have expected to have seen some serious press and Boris photo opportunities at such an accomplishment.

Anyone got any further info?

Does anyone know how this Phyllis and Ada (and Victoria and Elizibeth coming the other way) are to be removed from the ground? Is there a hole at Farringdon?

Graeme

Do they not get buried where they finish.
 

Simon11

Established Member
Joined
7 Nov 2010
Messages
1,389
The "Near you" map on the Crossrail website has been updated today (27th)and now shows Phyllis having -0.17 km remaining.

Surely this means the first of the tunnels is now dug and lined?

But I would have expected to have seen some serious press and Boris photo opportunities at such an accomplishment.

Anyone got any further info?

Does anyone know how this Phyllis and Ada (and Victoria and Elizibeth coming the other way) are to be removed from the ground? Is there a hole at Farringdon?

Graeme

I would have thought they would be burried? I may be wrong....

 

neilm

Member
Joined
3 Jan 2012
Messages
501
I thought they were keeping them for crossrail 2 to reduce costs.
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
The "Near you" map on the Crossrail website has been updated today (27th)and now shows Phyllis having -0.17 km remaining.

Surely this means the first of the tunnels is now dug and lined?

But I would have expected to have seen some serious press and Boris photo opportunities at such an accomplishment.

Anyone got any further info?

Does anyone know how this Phyllis and Ada (and Victoria and Elizibeth coming the other way) are to be removed from the ground? Is there a hole at Farringdon?

Graeme

Phyllis had only 200m to go on the 4/9/13 so has only covered 30 in the last few weeks. I imagine that unless their are complications that they are managing the breakthrough date and I w old also be very surprised if Boris was not there when they breakthrough.

There is a big hole at Farringdon near the meat market, and I would guess the tbms will come out there but I am just speculating.
--- old post above --- --- new post below ---
I thought they were keeping them for crossrail 2 to reduce costs.

If they come out I would expect them to go back to Germany for refurbishment.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,617
Location
Nottingham
According to October's Modern Railways Phyllis will complete the first drive "before Christmas". Various of the Tunnel Boring Machines are used more than once (for example same article notes that Jessica does Pudding Mill to Stepney Green then both tunnels Limmo to Victoria Dock). I can't imagine they would be buried on completion, as to do that they'd have to dig several hundred metres more tunnel so as to park themselves out of the way of passing trains.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
Phyllis had only 200m to go on the 4/9/13 so has only covered 30 in the last few weeks. I imagine that unless their are complications that they are managing the breakthrough date and I w old also be very surprised if Boris was not there when they breakthrough.
There is a big hole at Farringdon near the meat market, and I would guess the tbms will come out there but I am just speculating.

The yellow "next month" graphic for Phyllis carries on eastwards past Aldersgate St, almost to the Barbican.
Maybe that's where the exit hole is.
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
The yellow "next month" graphic for Phyllis carries on eastwards past Aldersgate St, almost to the Barbican.
Maybe that's where the exit hole is.

A few months ago I went to the meat market and saw a big whole at the east end of it (through a whole in the fence) but the map is as you describe it.
I cannot find any reference on the Internet as to the exact extraction or dumping point but would also love to know the answer.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,256

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
I can't imagine they would be buried on completion, as to do that they'd have to dig several hundred metres more tunnel so as to park themselves out of the way of passing trains.

For the channel tunnel, two pairs (UK L+R and France L+R — four TBMs total) met in the middle. One pair (UK I think) dug down and got buried under the track, so as to let the other pair out.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,617
Location
Nottingham
For the channel tunnel, two pairs (UK L+R and France L+R — four TBMs total) met in the middle. One pair (UK I think) dug down and got buried under the track, so as to let the other pair out.

Didn't know that thanks. But I guess the logistics of getting the machines out from mid-Channel are a bit more tricky than from the middle of London. I seem to recall the place they meet will be a chamber that eventually houses a pair of crossovers, somewhere near Farringdon but I don't remember the street name.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Of course, since XR2 wasn't realistically planned when XR1 was being imlimented.

Would make the balance sheet look good if they buy them back though.
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,713
would they not move on to Northern Line extension or does the smaller bored tunnel mean that is not possible?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,250
Of course, since XR2 wasn't realistically planned when XR1 was being imlimented.

Would make the balance sheet look good if they buy them back though.

But a lot less good when you buy them back again to do CR2 ;)
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
The cutting heads will likely be knackered by then anyway, so would need new ones regardless. As for the state fo the rest of the infrastructure...who knows. Perhaps more would need to be refurbished before you could send them on elsewhere.

Still, it's a shame they don't have more schemes ready to send them on if all that's needed is a new cutting head.
 

Rl1

New Member
Joined
18 Jul 2010
Messages
3
I can confirm that the four machines will be buried near Farringdon. I think Ada is not far behind, around 1km I think.

They are stripping Phyliss of parts but the cost of the scrap metal of the machine does not outweigh the cost of removing the machine and getting it out of london.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,617
Location
Nottingham
would they not move on to Northern Line extension or does the smaller bored tunnel mean that is not possible?

If the tunnel is smaller then the TBM isn't useable since it is built to the diameter of the tunnel. I assume the Northern extension tunnels will be similar size to the Jubilee line extension, ie Tube size plus a walkway, compared to Crossrail which is main line size plus a walkway.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
I can confirm that the four machines will be buried near Farringdon. I think Ada is not far behind, around 1km I think.

They are stripping Phyliss of parts but the cost of the scrap metal of the machine does not outweigh the cost of removing the machine and getting it out of london.

Just as a point of curiosity, is the reason they cannot simply back them out again because the tunnel linings effectively reduce the tunnel width so they wouldn't fit? Otherwise, seems strange they wouldn't have them do an entire run out to the other portals, i.e. Paddington-Stratford. At a pinch, disassembling them in the Stepney cavern would have seemed to make sense...how strange.

If the tunnel is smaller then the TBM isn't useable since it is built to the diameter of the tunnel. I assume the Northern extension tunnels will be similar size to the Jubilee line extension, ie Tube size plus a walkway, compared to Crossrail which is main line size plus a walkway.

Seems strange you wouldn't build the tunnels to mainline size anyway. You need a walkway regardless (may as well be larger) and it means any future enlargement wouldn't need to do this section. Would also help with the airflow!
 
Last edited:

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
Seems strange you wouldn't build the tunnels to mainline size anyway. You need a walkway regardless (may as well be larger) and it means any future enlargement wouldn't need to do this section. Would also help with the airflow!

Yeah, it would seem that future-proofing the tunnel diameter is an easy win, although I believe due to diluting the Piston Effect, airflow would be hindered rather than helped.

Tunnels wider than necessary are also much worse during a crash (Moorgate) — although with modern anti-ride-up gear this might not be a real problem any more. The narrow tunnels were certainly a major obstacle at Russell Square.

If it turns out to be a good idea to future-proof, yet keep a tube width, I guess you could use traditional concrete lining for the mainline bore, then add a semi-permanent steel inner lining — strong enough to keep a derailed tube train in a straight line.
 

Rl1

New Member
Joined
18 Jul 2010
Messages
3
They could back the gantries out and leave the cutting head in, but it would be a mammoth task and would involve stripping out everything in the tunnel (see pic).

I think the cost of each TBM is only £10M which is peanuts when you consider the cost of the whole project. I think the reason they had 8 TBMs rather than 4 was to get the job done quicker.
 

Attachments

  • 1.jpg
    1.jpg
    72.8 KB · Views: 82
Last edited:

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Just as a point of curiosity, is the reason they cannot simply back them out again because the tunnel linings effectively reduce the tunnel width so they wouldn't fit? Otherwise, seems strange they wouldn't have them do an entire run out to the other portals, i.e. Paddington-Stratford. At a pinch, disassembling them in the Stepney cavern would have seemed to make sense...how strange.



Seems strange you wouldn't build the tunnels to mainline size anyway. You need a walkway regardless (may as well be larger) and it means any future enlargement wouldn't need to do this section. Would also help with the airflow!

The LU tubes are not going to be enlarged. I'm pretty confident about this.

Larger tunnels mean vastly more spoil. Which is expensive to transport and dispose of.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
The LU tubes are not going to be enlarged. I'm pretty confident about this.

Larger tunnels mean vastly more spoil. Which is expensive to transport and dispose of.

Also, by the number of 'construction' shafts in the plans, I'd expect that it will all be done 'by hand' with shotcrete rather than by a TBM that doesn't have anywhere to start or finish as it's entirely underground for it's construction other than the Battersea station box...
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Would the NL extension have a further extension to Clapham Jn. in mind?

Yes, it does.

The line has been designed to allow extention to clapham junction but not directly allow it as a 2nd stage (the plant access is via Battersea Box that will be filled with station) but one could easilly sink another box at Clapham Sidings (sidings would be needed for an LUL station) so extention wouldn't be too hard.

But if one thinks about an extention to clapham junction with some sense, would even 33tph on the Northern Line ex. Kennington be able to handle the demand and leave space for passengers all the way via Charring Cross?

The same logic can be applied to any extentions to the Victoria Line, does it really need any more passengers???
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
My reading of it is that Clapham may get a Northern line extension if/when Cross Rail 2 happens, as this would ease demand
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Quite possibly, the next upgrade for the Victoria Line might also see it extended to Clapham Junction and sharing terminating trains with Brixton.
 

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,211
Location
SE London
But if one thinks about an extention to clapham junction with some sense, would even 33tph on the Northern Line ex. Kennington be able to handle the demand and leave space for passengers all the way via Charring Cross?

Would demand for through passengers be that great? Even if the line was extended to Clapham Junction, the likelihood is that anyone on SWT who currently changes to the Northern line northbound at Waterloo would still find it quicker to continue to do so (Besides, even if some people do revise their journeys to change at CLJ instead, that's only going to increase numbers on the Northern line between CLJ and Waterloo - that would in itself have zero impact on passenger numbers north of Waterloo, which is where the line is at its busiest)

It's more likely that people arriving at CLJ on Southern trains will find it useful to change to the Northern line at Clapham Junction for journeys into the city, but even there I'd imagine for many destinations it'll still be easier to stay on the train to Victoria and then take the Victoria or District lines, so that doesn't look to me like bringing overwhelming additional numbers to the Northern line.

Extending the Northern line to CLJ seems very obviously useful in terms of improving connections for people whose final destination is in South London, or who want to get to the Northern line City branch, but I'd be surprised if added so many passengers north of Kennington as to overwhelm the Northern line.

Not only that, but aren't there plans afoot to increase the frequency of trains on the Northern line by fully separating the City and Charing Cross branches, removing the bottleneck at Camden Town?
 
Last edited: