South
* Rerailing track at high criticality sites at Denbigh Hall and Hanslope Junction to maintain performance on high use, high priority lines.
* Key signalling life extension works at Northampton and Willesden, alongside works to move recontrol to Rugby from Marston Vale and Stoke
* Rewiring the fire suppression system at London Euston
* Renewal of the 11kv DC cables on Euston-Watford DC network traction supply
* Replacement of 25kv oil filled breakers at Camden and Wembley
Central
* Signalling life extension works Worcester area, Marylebone, Aston, and Stourbridge.
* Renewal of level crossings at Gloucester and Stourbridge
* Earthworks schemes to address high risk areas into Birmingham and at Harbury and Ledbury.
* Renewal of Birminham New Street OHLE
* Replacement of 25kV oil filled life-expired circuit breakers (installed in 1958 – 1963) which are high-risk hazards.
* Renewal of London Marylebone trainshed
* Footbridge renewal at Wendover and staircase renewal at Tyseley station
North
* Crewe Hub.
* Critical track renewals on the approach to Manchester Piccadilly.
* Resignalling Crewe as well as Cumbria, Buxton, Great Rocks, Chester, and Stockport.
* Renewal of level crossings in the Silecroft area, Wigan – Stockport, and Deansgate Junction
* Earthwork to address flood issues at Ashton Heath, Worleston Embankment and Chorley Flying Arches.
* Targeted (small scale) schemes to improve station canopies, platform condition, station buildings, footbridges, and lift renewals and toilet refurbishment at Manchester Piccadilly and Liverpool Lime Street.
* Replacement of life expired and failing OHLE on WCML(N)
* Replacement of oil filled 25kv breakers in the Liverpool and Manchester areas installed between 1958-1963.
WCML (N) Programme
* Seperate planned major renewal and upgrade program spanning CP7 and CP8 last done in the 70's and to support introduction of HS2.
* Resignalling at Warrington and re signalling scope at Preston and Carlisle delivered in CP7 with ETCS switch on in CP8
* Overhead line renewals between Crewe and Preston, and north of Preston
* Essential track renewals between Crewe and Carlisle to accommodate greater traffic flows with HS2 trains alongside exiting traffic and to meet government freight growth targets.
* Accessibility and dwell time improvements at 13 stations.