There are thirty 701/5s. Like the 707s, they were designed for easy conversion to AC so not limited to DC land.If SWR don't use / want the 701/5s, who could need or want them? How many are there? Presumably they are only suitable in 3rd rail land, so no good for the new Northumberland line which is crying out for more coaches.
Southeastern have a large fleet of aging and knackered networkers which they want to replace sooner than later.If SWR don't use / want the 701/5s, who could need or want them? How many are there? Presumably they are only suitable in 3rd rail land, so no good for the new Northumberland line which is crying out for more coaches.
But as others have said, I sure that Southeastern doesn't need another small fleet of non-compatible suburban units, as it already has the 376s (x36), and the 707s (x30) as well as the 465s & 466s.Southeastern have a large fleet of aging and knackered networkers which they want to replace sooner than later.
I could see the 701/5s displacing some of the more knackered networkers for scrap if they aren't needed.
Again, while it's true Southeastern really shouldn't add yet another incompatible fleet into the mix, thirty is NOT a small fleet.But as others have said, I sure that Southeastern doesn't need another small fleet of non-compatible suburban units, as it already has the 376s (x36), and the 707s (x30) as well as the 465s & 466s.
I would hate to be the person who is responsible for the spares store at Slade Green, if SE gets the 701/5s (x30) as well, the spares store at SG would be larger than the depot.
No. SE don’t need to complicate their fleet further. SWR will keep them for future service increases. There have been talks of a full timetable recast, which will see more services added, therefore making the 701/5s neededSoutheastern have a large fleet of aging and knackered networkers which they want to replace sooner than later.
I could see the 701/5s displacing some of the more knackered networkers for scrap if they aren't needed.
Well when GBR becomes a thing then fleets will probably be interchanged on a more frequent basis.No. SE don’t need to complicate their fleet further. SWR will keep them for future service increases. There have been talks of a full timetable recast, which will see more services added, therefore making the 701/5s needed
== Doublepost prevention - post automatically merged: ==
People need to stop saying SE should get the 701/5s, that is not happening at all. If they need more trains to replace the networkers in the short term whilst they wait for their new trains to arrive, they’ll most likely borrow some 377s from SN.
So when you say future increases, they’re not going to utilise them for the foreseeable?No. SE don’t need to complicate their fleet further. SWR will keep them for future service increases. There have been talks of a full timetable recast, which will see more services added, therefore making the 701/5s needed
== Doublepost prevention - post automatically merged: ==
People need to stop saying SE should get the 701/5s, that is not happening at all. If they need more trains to replace the networkers in the short term whilst they wait for their new trains to arrive, they’ll most likely borrow some 377s from SN.
No, it won’t be more frequent. Train fleets are tied into service and maintenance contracts. Not to mention that staff on the ground require traction-specific training.Well when GBR becomes a thing then fleets will probably be interchanged on a more frequent basis.
SWR have signed a lease and maintenance agreement for all the 701s. With the current timetable if all the 458s and 450s on Arterio service groups are off-leased or redeployed there would be 63 weekday 10-car 701 diagrams. That can't be covered with 60 10-car 701/0s and would need the 701/5s. The 701 fleet wouldn't have particularly high utilisation until a timetable rewrite or more peak trains are added back into the timetable.So when you say future increases, they’re not going to utilise them for the foreseeable?
The Ascot-Aldershot shuttle is pretty underused as it is, with a four-car... I see no advantages of the extra coach!Kingston Bay and Aldershot to Ascot is about it.
The 458's leases are till 2027, so do we know if they will be returned to Porterbrook? (or under speculation, extended and used as 2x2 seating express trains on the PDL as originally planned, if the line gets updated signalling?)what’s the plan for 701/5 units? It seems like they aren’t needed.
Southeastern have a large fleet of aging and knackered networkers which they want to replace sooner than later.
I could see the 701/5s displacing some of the more knackered networkers for scrap if they aren't needed.
No. SE don’t need to complicate their fleet further. SWR will keep them for future service increases. There have been talks of a full timetable recast, which will see more services added, therefore making the 701/5s needed
People need to stop saying SE should get the 701/5s, that is not happening at all. If they need more trains to replace the networkers in the short term whilst they wait for their new trains to arrive, they’ll most likely borrow some 377s from SN.
Given these units are effectively surplus to SWR's requirements,
They are not (no offence nw1), unless an official source can say otherwise!It's unfortunate that the 701/5s are considered surplus to SWR's needs.
They are not (no offence nw1), unless an official source can say otherwise!
The 701/5's and all 701/0's (750 cars in total) have a full life use on SWR once the new revised TT is in place. I think too many posters on here are repeatedly equating the current reduced TT with what they perceive as an excess of stock, forgetting that the FG/MTR bid for the 701's (all) was based on the pre covid SWT/SWR TT in place at 2016/2017 etc., a timetable that was based on the 2004 recast.
The 701's were designed to replace 455, 456, 458 and 707 (742 cars in total), and that is what will very likely happen. The new timetable in the planning (the basis of which I have had in person from the MD) will be such, that my own interpretation of the stock situation that will apply to same, will involve all the the 701's as mentioned above, and the 458's will be binned. The 450's will all migrate/revert to outer suburban/main line work, as was always the intension even in SWT days, scuppered slightly due to lack of ££ which resulted in 3 x 8 car 450 remaining on the Reading road.
The 701 plan (in full) will allow the entire suburban area to be worked by one type (10 and 5 cars) with Desiro's taking care of the outer and main line areas.
No apology needed. As said, no offence to yourself. We have had some intelligent and worthwhile conversations in the past, and I have noted you have only recently come back to this theme.Sorry - was just echoing other people's thoughts on here.
It is good to hear that they aren't surplus to requirements and there is a prospect of a new timetable at some point.
The self contained Guildford/Farnham/Ascot route was never part of the 701 plan. The reason for 701 involvement at Farnham was simply on a one for one replacement basis of the 8 car 458 diagrams that operated from Farnham (depot) on the peak hour Waterloo services via Ascot.The Ascot-Aldershot shuttle is pretty underused as it is, with a four-car... I see no advantages of the extra coach!
Agree. The basis of the faster dwell times associated with the new stock (701 as we now know it) was good thinking to get the basics of what was essentially a very sound (2004*) TT back on track (time wise) particularly in the suburban area, where usage (prior to covid) had outstripped capacity, hence the TT started to crumble, particularly towards the end of the a.m. peak inbound, and in the p.m outbound at stations Vauxhall downwards. Volume of people, end of!When the 701s were ordered 8.5 years ago (mid 2017), plan was to operate a faster suburban timetable from December 2020 (once last of 455, 456, 458 were gone), as new trains had better performance.
There were some problematic tight bits (almost unworkable) in the proposed timetable, but it never actually happened. The current timetable is over 20 years old (it is basically from 2004, although some minor changes, and some covid era thinning out took place, which has not been fully restored.
Actually the current timetable is very slow, it was based on slow station dwell times of crowded 455s which are sluggish by modern standards, and heavily padded for time. There are many stations in SW London, eg Kingston, Hampton Court etc that now take longer than in the 1916 LSWR electric timetable operated by 65mph 3car torpedo units. Yes slower than over 100 years ago.
There is, although when speaking to the MD myself a date was not suggested, but it will happen, provided (he and his team) are allowed to drive this forward without undue interference from those in HMG or others who are not best placed to advise!There is a new timetable proposed from December 2026
Yes, agree again, in principle. But I suspect on finer investigation of the overall timetable, in recent years this is far more congested at certain critical places (although I have not done 'the detail' myself). But my point being, services on certain routes, or parts thereof, may well benefit from a speeding up, but often as not, this may also be negated by a lack of pathway elsewhere on the journey(s) concerned (in simple terms a faster service having caught up with a preceding movement/train/junction confliction), effectively wiping out any gain had in the earlier part of the journey. The devil will be in the detailed overall re-planning, which takes time.BR used to say improved journey time increased passengers, so in theory could make SW suburban more attractive again by some serious speeding up. It must be really embarrassing to some staff that their current service is slower than in First World War.
I had input to one such provisional plan for a proposed scheme involving TfL who wished to cherry pick certain SW suburban routes operating from Waterloo many years ago. Back then the train service operating on the main suburban using (off peak) p1-4 at Waterloo, but also making odd use of p5 & 6 in the peaks, as a result of the additional peak time Epsom's etc, and was (to my mind) at the optimum for number of trains using p1-4 day to day.Of course under GBR it would not be hard to reallocate a couple of routes to better utilise stock
What chance an improvement to the off-peak services between Richmond and Waterloo (via Mortlake)? Hopefully once all the 701s are in service we might dream of seeing 4tph all day every day, instead of the 2tph we now have outside the peaks.There is, although when speaking to the MD myself a date was not suggested, but it will happen, provided (he and his team) are allowed to drive this forward without undue interference from those in HMG or others who are not best placed to advise!
If SWR don't use / want the 701/5s, who could need or want them? How many are there? Presumably they are only suitable in 3rd rail land, so no good for the new Northumberland line which is crying out for more coaches.
It always seems curious to me that Southern has no dedicated metro trains at all, whereas Southeastern already has the high density 376s and inherited 707s. Indeed it is a quirk that Thameslink service to the coast have way more standing space than Southern 377/6s operating south London metro style routes.If 701/5s did leave SWR, I think a better route would be to send them to Southern, which then send more 377s to Southeastern. The 701/5s would be better suited to some of Southern's suburban operations, particularly through better acceleration than 377s, while it wouldn't be a major burden on fleet and maintenance knowledge compared to Southeastern, as the former have 3 fleets, while the latter have 7 fleets. The 377s that go to Southeastern could be enough to takeover Tunbridge Wells' diagrams, potentially even making some of them 12-car, which would require a minimum of 15x 4-car equivalent.
It always seems curious to me that Southern has no dedicated metro trains at all, whereas Southeastern already has the high density 376s and inherited 707s. Indeed it is a quirk that Thameslink service to the coast have way more standing space than Southern 377/6s operating south London metro style routes.
That is something I would welcome also, and I may have a chance to speak with someone (not the MD) in the not too distant future, and see if /how things are progressing, although from a robust timetable angle (in my past experience) this will largely depend on a stable rolling stock situation.What chance an improvement to the off-peak services between Richmond and Waterloo (via Mortlake)? Hopefully once all the 701s are in service we might dream of seeing 4tph all day every day, instead of the 2tph we now have outside the peaks.
Well said !701/5 driver training starts in April. Time to stop with the “will they go elsewhere” wibble
More chance of there being a need to Wibble about where 458s could go imo.701/5 driver training starts in April. Time to stop with the “will they go elsewhere” wibble
458s have no future and are not needed at SWR once the 701 rollout is complete, as far as I am awareMore chance of there being a need to Wibble about where 458s could go imo.
If SWR has a stock surplus 458s are an obvious microfleet to get rid of especially as it does not do anything the 450s cannot do. But, also, I think the 450s are relied upon for quite high usage iirc so could ease off there, how true is that still ?.