Could there be gains for Liverpool if the eastern leg doesn’t go ahead?
between Nottingham and W Yorks its a mining area. We know from the manchester-preston electrification that heavy engineering in an ex mining area is difficult and unpredictable. Its quite hilly too which complicates it further. The Cheshire Plain is an easier proposition.
I've definitely seen a masterplan for the station area. Probably cost in the region of £100k.In an article in the Leeds Live website today under the headline "Leeds leg of HS2 to be 'axed imminently' over catastrophic costs" there is the statement that "Leeds has already started work on a £500million station to serve HS2, with other projects in the city relying on it."
Is this true? If so, does anyone know how much has been spent and what on?
The Cheshire Plain has its own issues with salt mining. There's a viaduct that had/has to be "topped up" with extra sections due to subsidence.between Nottingham and W Yorks its a mining area. We know from the manchester-preston electrification that heavy engineering in an ex mining area is difficult and unpredictable. Its quite hilly too which complicates it further. The Cheshire Plain is an easier proposition.
If the route is significantly de-scoped then it becomes slower than the ECML for London-NE and possibly London-Leeds too. So it an eastern leg terminating near Trent might end up carrying trains for Sheffield (via Derby) and Nottingham instead of Leeds and York. Cross Country would probably then stay on the existing route because Derby via HS2 and Long Eaton would be no quicker.I suspect that the Erewash valley would be restored to 4 tracks with HS2 services using the Eastern pair of lines?
What would happen at Chesterfield? The station is on the wrong side.Someone more technical may be able to advise but I thought most of the complex engineering on the Eastern arm was North of Toton. I don't know how much a Birmingham to East Midlands line would cost compared to say phase 2a from Birmingham to Crewe?
I suspect that the Erewash valley would be restored to 4 tracks with HS2 services using the Eastern pair of lines?
If the route is significantly de-scoped then it becomes slower than the ECML for London-NE and possibly London-Leeds too. So it an eastern leg terminating near Trent might end up carrying trains for Sheffield (via Derby) and Nottingham instead of Leeds and York. Cross Country would probably then stay on the existing route because Derby via HS2 and Long Eaton would be no quicker.
But if Leeds to London goes via NPR, doesn't that mean Liverpool gets a reduced service? They won't like hearing that...
Some would but I expect London services to York and the North East would likely stay on the East Coast.Eastern leg traffic to Leeds is likely to transfer to HS2 via Manchester.
Some would but I expect London services to York and the North East would likely stay on the East Coast.
What would happen at Chesterfield? The station is on the wrong side.
It depends if Leeds-Manchester is taken forward as a new build line, but if it is then it is a realistic proposition that Leeds-London and Leeds-Birmingham will run via HS2 west, with journey times to London being in the region of 1 hour 40. At 1 hour 40, it then asks the question of whether it would be better to also send Newcastle services to London via Leeds & Manchester. There may not be a significant time saving for Newcastle via the ECML, but it opens up Kings Cross for seeing an increase in south east commuter services.Assuming as seems likely, the eastern arm is postponed/canned what could be done with the ECML to improve journey times, and how much would it cost compared with HS2 eastern leg?
My thoughts would be:
Welwyn Viaduct
Newark Flat crossing
4 track all the way to Peterborough
Put these together and they are only going to shave minutes of the current times
Leeds seems more in need of speeding up than York, Although being a couple of miles shorter average journey times are 20 mins longer on average, once Church Fenton to Leeds is electrified could some Leeds trains approach from the east, would it save much time, is there capacity. Are there any easy wins that could be made by increasing line speed betweeen Doncaster and Wakefield, Wakefield to Leeds looks to be constrained by geography.
140mph running is going to need major resignalling, where does that sit on the cost spectrum.
Inevitably with the likely demise of HS2 east any east coast improvement are going to be small increments, so what would deliver biggest improvement for least cost?
Take out the intermediate stops? That is essentially why York has a faster service than Leeds.Leeds seems more in need of speeding up than York
What are these south east commuter services that need to be increased? They have recently been reduced.There may not be a significant time saving for Newcastle via the ECML, but it opens up Kings Cross for seeing an increase in south east commuter services.
What are these south east commuter services that need to be increased? They have recently been reduced.
This one always puzzles me - would there then be 6tph London to Manchester to Leeds to create room on the trains for Manchester and Leeds passengers or just extend 3tph Manchester onto Leeds on the basis of longer trains?It depends if Leeds-Manchester is taken forward as a new build line, but if it is then it is a realistic proposition that Leeds-London and Leeds-Birmingham will run via HS2 west, with journey times to London being in the region of 1 hour 40.
We probably can on south east commuter services.We can’t take short term covid impacts as a measure for long term needs.
My thoughts would be:
Welwyn Viaduct
Newark Flat crossing
4 track all the way to Peterborough
Maybe that is the answer to the conundrum. You run a combined 400m train from London to Manchester with one 200m unit reserved for travel to Leeds, York and Newcastle and the other 200m unit detached at Manchester reserved just for people finishing there.How hard would it be to get operationally 400m platforms at Leeds, York and Newcastle?
However none of them are journey time enhancements, which was what was suggested for the ECML. Newark would give a few seconds by raising speed to 125mph but they are more about capacity. BR squeezed as much as it could in the way of ECML line speeds over the years, short of major realignment outside the railway boundary (and even did that in a couple of places), and the Azumas are probably about the ultimate in conventional train performance, so you'd probably be looking at a high speed bypass to get much more.4 tracks from Huntingdon to Peterborough is by far the cheapest of these, and gives far more benefit than the others combined.
But that then brings into question why you would build a bypass on a new alignment which isn't the eastern leg of HS2. Surely the business case for a bypass route on an alignment nearer to the existing ECML would be worse than for the existing HS2 eastern leg.a high speed bypass to get much more.
However the HS2 train service spec proposes to run separate 400m trains to Manchester and Leeds, suggesting that a combined service wouldn't give enough seating capacity. And there isn't capacity either to run more trains between Birmingham and Manchester unless something else is cancelled.Maybe that is the answer to the conundrum. You run a combined 400m train from London to Manchester with one 200m unit reserved for travel to Leeds, York and Newcastle and the other 200m unit detached at Manchester reserved just for people finishing there.
This one always puzzles me - would there then be 6tph London to Manchester to Leeds to create room on the trains for Manchester and Leeds passengers or just extend 3tph Manchester onto Leeds on the basis of longer trains?
However the HS2 train service spec proposes to run separate 400m trains to Manchester and Leeds, suggesting that a combined service wouldn't give enough seating capacity. And there isn't capacity either to run more trains between Birmingham and Manchester unless something else is cancelled.
I don't doubt you at all but would be interested to learn how the benefit of that project is so much greater. I can imagine it allows long distance trains to pass the local trains not only adding capacity there but also more flexibility in the timetable to allow a better fit elsewhere in the network4 tracks from Huntingdon to Peterborough is by far the cheapest of these, and gives far more benefit than the others combined.
Absolutely; Huntingdon to Woodwalton (where 3 tracks become 4 again) was definitely being looked at for 4-tracking before being quietly shelved. And aside from 1 bridge behind the IKEA warehouse in Peterborough, there are no bridge reconstructions required.4 tracks from Huntingdon to Peterborough is by far the cheapest of these, and gives far more benefit than the others combined.
At the right speed it also allows long distance trains to overtake long distance trains (eg those stopping at Peterborough) and could completely segregate freight that has used the Hertford North line without having to worry about Welwyn.4-tracking all the way from Peterborough to Huntingdon (and then, by that dint, to Woolmer Green) would be a huge boon for such a station.
However none of them are journey time enhancements, which was what was suggested for the ECML
I don't doubt you at all but would be interested to learn how the benefit of that project is so much greater. I can imagine it allows long distance trains to pass the local trains not only adding capacity there but also more flexibility in the timetable to allow a better fit elsewhere in the network
We can’t take short term covid impacts as a measure for long term needs.
However the HS2 train service spec proposes to run separate 400m trains to Manchester and Leeds, suggesting that a combined service wouldn't give enough seating capacity. And there isn't capacity either to run more trains between Birmingham and Manchester unless something else is cancelled.