• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Could more Class 395s be ordered?

Status
Not open for further replies.

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
We had this discussion recently, it was pointed out that the trackwork at Ashford would need very significant alteration.
iirc, the work would require a rebuild of a junction at the western end and platform 2 getting fitted with 25KV lines
I was just using the route from Ashford to Hastings as an example, but yes I am aware of the rebuild work that would be required at Ashford to make it work. But as someone put in another thread, this is the Speculation area!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,171
I was just using the route from Ashford to Hastings as an example, but yes I am aware of the rebuild work that would be required at Ashford to make it work. But as someone put in another thread, this is the Speculation area!
long story short, there isn’t a need for high speed bi-modes in Kent.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
I was just using the route from Ashford to Hastings as an example, but yes I am aware of the rebuild work that would be required at Ashford to make it work. But as someone put in another thread, this is the Speculation area!
Generally, speculation threads have some acknowledgment of the real world, not accepting the lack of proven demand for through services from Hastings onto HS1, the very high cost of infrastructure to accommodate them at Ashford and the fact that electrification could prove cheaper than a bi-mode solution anyway seems to take this thread from 'speculation' into fantasy worlds.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Generally, speculation threads have some acknowledgment of the real world, not accepting the lack of proven demand for through services from Hastings onto HS1, the very high cost of infrastructure to accommodate them at Ashford and the fact that electrification could prove cheaper than a bi-mode solution anyway seems to take this thread from 'speculation' into fantasy worlds.
Fair comment. But sometimes ideas that maybe from fantasy worlds do become reality. An example of this would be reading the many stories of many engineers that worked for BR back in the 1960s & 1970s, that felt that having tilting trains with passengers on was a dream from cuckoo land. How many trains within Europe that can tilt when on curves have come from the developments of the APT?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,171
Fair comment. But sometimes ideas that maybe from fantasy worlds do become reality. An example of this would be reading the many stories of many engineers that worked for BR back in the 1960s & 1970s, that felt that having tilting trains with passengers on was a dream from cuckoo land. How many trains within Europe that can tilt when on curves have come from the developments of the APT?
Tilting trains were developed in order to raise the average speed of train journeys, with the intention being that tilt would be less expensive that slewing curves. Therefore has absolutely no relevance to the discussion about Ashford-Hastings. Hitachi doesn't offer tilting trains in the UK anyway.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Tilting trains were developed in order to raise the average speed of train journeys, with the intention being that tilt would be less expensive that slewing curves. Therefore has absolutely no relevance to the discussion about Ashford-Hastings. Hitachi doesn't offer tilting trains in the UK anyway.
The relevance is, that there was many in BR at the time that said that tilting trains would never work. If there is one thing that I have learned in life, never totally write something off from happening.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,522
Location
Northampton
The relevance is, that there was many in BR at the time that said that tilting trains would never work. If there is one thing that I have learned in life, never totally write something off from happening.
Nobody's said the Ashford couldn't physically be rebuilt, just that the costs will never be justified by the benefits. That's very different from genuine doubt about the technical viability of producing a tilting train at 125-140mph.
 