Tetchytyke
Veteran Member
That speaks volumes over the sustainability of continuing to operate rail services to Stranraer.
Not really. It more speaks volumes about how necessary the two 156s are to the overall Scotrail operation.
There is a mileage limit between inspections. Because they can't get to the depot, they can't be inspected. And if they can't be inspected they can't be operated.How have the trapped trains become unserviceable