• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 93 Tri-mode Loco

172007

Member
Joined
2 Jan 2021
Messages
1,133
Location
West Mids
Yes, I meant that its there in case the 93 fails, similar to how all of the 99 tests so far have had either a 66 or 69 tucked in behind.
Hence my question as to whwther a 93 can work in multiple with a 66. A 99 can so of the 99 fails then all beind well the 99 can still contine with the 66/69 powering.

99 is the same family as a 93.

== Doublepost prevention - post automatically merged: ==

4S48 Cancelled as per Realtime Trains
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
Hence my question as to whwther a 93 can work in multiple with a 66. A 99 can so of the 99 fails then all beind well the 99 can still contine with the 66/69 powering.

99 is the same family as a 93.

== Doublepost prevention - post automatically merged: ==

4S48 Cancelled as per Realtime Trains
It's just departed Daventry 1925.
 

cj_1985

Member
Joined
6 Mar 2010
Messages
845
Location
Lanarkshire
Hence my question as to whwther a 93 can work in multiple with a 66. A 99 can so of the 99 fails then all beind well the 99 can still contine with the 66/69 powering.

99 is the same family as a 93.

== Doublepost prevention - post automatically merged: ==

4S48 Cancelled as per Realtime Trains
As far as I've seen from the 93s and 99 at the Greatest Gathering and at the Polmadie Open day... I don't believe the 93s have AAR compatab.... at least not to the point of having a visible socket
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
Made up 15 minutes by Carnforth Junction (now at +12) . Definitely got a wiggle on
Beat me to it.
Although it will be running at class 66 timings, so with the performance of a 93, it will be gliding up the Hills
 

Harlequinuk

On Moderation
Joined
15 May 2025
Messages
330
Location
UK
Tim Moran is posting a photo or 2 he took on social media.

edit: @ Milnthorpe, now at +9. Its flying along. Who ever the demo is for, might actually be impressed. Its hauling 20 x IKA with the DIT Cl66, makes it 1650tons or so
 

D1511

Member
Joined
29 Jul 2023
Messages
1,199
Location
WCML N
It's really gaining time now it's in the hilly section. I'll bet it's on time by Shap at this rate.
 

Harlequinuk

On Moderation
Joined
15 May 2025
Messages
330
Location
UK
Now at Tebay, at -3 early going up Shap

Now topped Shap and is 11 minutes early - did Tebay to Shap summit in 6 minutes. In the rain, hauling 1650 tons oO
 
Last edited:

D1511

Member
Joined
29 Jul 2023
Messages
1,199
Location
WCML N
I'll amend my previous estimate to 10 early at Shap!
Since it's had a clear run from Wigan, it's made up 27 minutes, and probably 30+ by Shap. To repeat myself, pretty astonishing.....

Edit: 33 mins made up by Shap!

Edit2: at the risk of stating the bleedin' obvious, the 66 timing Tebay to Shap is 14 minutes......this thing did it in 6 minutes towing the GM junk as well!
 
Last edited:

Class15

Established Member
Joined
30 Dec 2021
Messages
4,100
Location
North London or Mildmay line
The 93 beat the previous night’s 4S47 for Grayrigg to Shap timings, which had a pair of 90s at the helm as opposed to the single 93 and also did not have to drag a 66 along with the train, which the 93 had to do!
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,588
Location
Croydon
Tebay yo Shap summit in 6 minutes, schedule allows 14 minutes.

How does that compare to a 90 or a pair of 86s ?.

@Class15 just saw your post !!!.
 

Harlequinuk

On Moderation
Joined
15 May 2025
Messages
330
Location
UK
Its the trickery for the computer controlled anti slip i bet - driver keeps the power in and the computer does the rest.

Holding -11 early at Long Ashes
 

D1511

Member
Joined
29 Jul 2023
Messages
1,199
Location
WCML N
I'm tempted to stay awake until Beattock, to see what it does there, as that's a steeper climb over a much longer 15 miles. I'll bet it flies up that 1:69 like it isn't there.......
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,477
Location
london
I'm tempted to stay awake until Beattock, to see what it does there, as that's a steeper climb over a much longer 15 miles. I'll bet it flies up that 1:69 like it isn't there.......
-24 already at Kirkpatrick
if the 93 can do this with ease on 4.6kW, a class 99 will fly on 6.1Kw
 

Suraggu

Member
Joined
23 Oct 2013
Messages
1,083
Location
The Far North
Even on a class 66 timed load at 1600 tonnes, it managed Beattock Summit with ease. The weather in the Beattock area is rather wet shall we say as well.
 

Harlequinuk

On Moderation
Joined
15 May 2025
Messages
330
Location
UK
20 minutes to climb Beattock (timing is 31) , in horrible conditions. Ended at Mossend PD Sterling , -49 minutes early.
 
Last edited:

Top