Unfortunately, you can't ignore the capacity issues at St. Pancras.
What capacity issues?
Unfortunately, you can't ignore the capacity issues at St. Pancras.
4 platforms which can only take 2x 810s compared to other InterCity London terminals.What capacity issues?
With the 810s capacity it shouldn't be a problem for a while.4 platforms which can only take 2x 810s compared to other InterCity London terminals.
4 platforms which can only take 2x 810s compared to other InterCity London terminals.
Different people have said different things. Some have said electrically same as class 805 (which has been tested), others say it is different.Moving this discussion forward...am I right in thinking EMR delayed their introduction into service until late this year? Presumably testing in electric mode needs several months at least...
I've kind of lost track of how far the wires will have got to by the time the 810s start - will it be Leicester?Moving this discussion forward...am I right in thinking EMR delayed their introduction into service until late this year? Presumably testing in electric mode needs several months at least...
There is no current firm commitment to wires north of Wigston South.I've kind of lost track of how far the wires will have got to by the time the 810s start - will it be Leicester?
Thanks for info. Daft, obviously....There is no current firm commitment to wires north of Wigston South.
propulsion system is different. Uprated motors (and no doubt control gear) but fewer of them, 125mph design top speed.Different people have said different things. Some have said electrically same as class 805 (which has been tested), others say it is different.
I would be very surprised if they tried to reinvent the wheel and decided to make 810s (which are being built virtually as follow ons to 805 and 807s fundamentally different). I am under impression the differences are in nose cones and interior fitment, not the propulsion system
How far is Wigston South to LeicesterThere is no current firm commitment to wires north of Wigston South.
It's only about 4 miles, but unlikely to be the next stage of MML electrification.How far is Wigston South to Leicester
Four miles, you thought they could accomplish that.This country is a joke, and not even a funny oneIt's only about 4 miles, but unlikely to be the next stage of MML electrification.
Electrification needs to take into consideration the various proposals to make it easier to get freight from Nuneaton to Peterborough.Four miles, you thought they could accomplish that.This country is a joke, and not even a funny one
They could, easily. But there are three reasons why I don't think they will do Leicester next:Four miles, you thought they could accomplish that.This country is a joke, and not even a funny one
The other reason being that Leicester is a problem due to the low bridge at the south end of the platforms. It’s too low for OLE so NR looked at dropping the trackbed but the sewer/water table was right underneath so that canned that. I heard they were looking at using a contact conductive sheet/strip or something like that on the bridge ceiling so the pan can contact without the need for wires to be suspended. I’ve heard that there will be a gap between Wigston and then the wires will restart at Syston when/if they ever wire past Leicester. Think the plan was to run 360’s from Leicester, but I doubt that will happen. Quite a gap and a pain having to pan down engine on, drive a few miles then pan up, engine off etc.Four miles, you thought they could accomplish that.This country is a joke, and not even a funny one
My understanding was that the station bridge at Leicester gives enough clearance for an insulated coating to be used on the underside of the bridge, as was used on the Intersection Bridge in Cardiff.The other reason being that Leicester is a problem due to the low bridge at the south end of the platforms. It’s too low for OLE so NR looked at dropping the trackbed but the sewer/water table was right underneath so that canned that. I heard they were looking at using a contact conductive sheet/strip or something like that on the bridge ceiling so the pan can contact without the need for wires to be suspended. I’ve heard that there will be a gap between Wigston and then the wires will restart at Syston when/if they ever wire past Leicester. Think the plan was to run 360’s from Leicester, but I doubt that will happen. Quite a gap and a pain having to pan down engine on, drive a few miles then pan up, engine off etc.
That’s exactly what I’d heard - sorry I couldn’t remember what it was called!My understanding was that the station bridge at Leicester gives enough clearance for an insulated coating to be used on the underside of the bridge, as was used on the Intersection Bridge in Cardiff.
![]()
Cardiff bridge avoids £40m demolition thanks to electric resistant paint
In a world first, electric resistant paint combined with voltage-controlled clearance (VCC) has helped make a Victorian railway bridge usable by new electric trains, avoiding weeks of passenger disruption and train delays in the process.www.networkrailmediacentre.co.uk
Though the issue at Leicester will be the low height of the wires and therefore the pantograph horns just above the adjacent platform. How they will address that, I don't know.
Once upon a time, Tyco used to do a plastic insulator for just that purpose.. Low demand meant they discontinued it. Great at Birmingham International when the pigeons say on the wires above a Pendo (flash, bang)The other reason being that Leicester is a problem due to the low bridge at the south end of the platforms. It’s too low for OLE so NR looked at dropping the trackbed but the sewer/water table was right underneath so that canned that. I heard they were looking at using a contact conductive sheet/strip or something like that on the bridge ceiling so the pan can contact without the need for wires to be suspended. I’ve heard that there will be a gap between Wigston and then the wires will restart at Syston when/if they ever wire past Leicester. Think the plan was to run 360’s from Leicester, but I doubt that will happen. Quite a gap and a pain having to pan down engine on, drive a few miles then pan up, engine off etc.
And this, really, is the tragedy. For want of 20m to extend the platforms by, we have to wait for the 810s to go through a whole type acceptance instead of being an off-the-shelf 80x.As said repeatedly - you can’t get any more ’Inter City’ trains up the MML. 4 platforms is enough for the 6tph is the limit. 240m platforms is also enough - there’s only 2 types of Intercity train longer than this; an 11 car Pendolino, and a 2x5 car 80x. The former has roughly the same capacity as 2 x 810s. The latter has slightly more.
Agreed, and thanks.Friendly place in speculative for debates around the merits of the 810s!
Ideally we'd like to keep this to just updates and some discussion around bringing the trains into service, rather than about the merits of the trains once they are in service. Hopefully that makes sense!
Class 810 - The Right Fit For EMR?
I've seen a lot of debate in the main Class 810 introduction thread, so creating this as a friendly space for debate around the merits of the 810 including but not limited to... -Seats -Capacity -Possibility of keeping 222 fleet to supplement capacity? Personally, I'd prefer the whole fleet be...www.railforums.co.uk
Indeed, EMR has some tatty trains for sure, an old core fleet and some hand me downs. Contrast that with TPE, but EMR's reliability record is a lot better.Of course you are correct about the importance of non cancellations / timekeeping - but people do notice the poor internal state. Plenty of people I know who are not otherwise overly interested in railways do comment on it. It's across the whole fleet of course, not just the inter city services.
For my day trips to London i got into the habit or deliberately booking trips carried out by 180's. For two reasons, they were nice to ride on and - with the woeful reliability - i could claim delay/replay and get a really cheap trip to London1I think the consensus was that the 180s were so utterly appalling in reliability terms that it was better all round to be rid of them.
One particular conversation with a signaller springs to mind, heading south into Leicester in a 222, and being replatformed due to yet another 180 failure: “we’re placing bets in the box on where the next one will sit down”.
They really were utterly shocking.
And this, really, is the tragedy. For want of 20m to extend the platforms by, we have to wait for the 810s to go through a whole type acceptance instead of being an off-the-shelf 80x.
An alternative view could be that the 80x's should have been designed taking into account the wider network - which had standardised on 10x23m carriages or 12x20m carriages (hence St Pancras getting 240m platforms) - rather than just the initial routes they were purchased for.And this, really, is the tragedy. For want of 20m to extend the platforms by, we have to wait for the 810s to go through a whole type acceptance instead of being an off-the-shelf 80x.
First one on the network for testing - April, for first in service, ‘2025’, for all in service end of 2025. Test unit may be based at Kettering in the engineering siding, could change though. This could all move of course!Guys does anyone know the introduction dates of these trains?
Thanks for the update!The latest edition of ‘Todays Railways’ has an interview with EMR Fleet Director.
He states:-
T1 - Old Dalby testing
T2 - Two cars sent to Pistoia, Italy for climate chamber testing.
T3, T4, T5 complete at Aycliffe and in test.
T6-T11 in assembly
T13 - in paint
T16 - at weld stage
No mention of T12.
First production units expected to be delivered in Quarter 2 of 2024 with final delivery Q2 of 2025.
Service introduction early 2025 with all in service December 2025.