bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,528
No as WMT class 153’s are due to transfer to EMT in December 2018

Easy solution.

Reduce the 6 car 172 Snow Hill workings to 5 car and the 4 car workings to 3 car.

Use all but two 172s that have been taken out of the equation on Snow Hill and use them on the Birmingham to Hereford via Bromsgrove, releasing a couple of 170s. The remaining two use on Bedworth/Kenilworth services.

The released 170s could then go on Chase/Shrewsbury journeys with the 150s going to do Bedford services as a temporary measure.

That would then release the remaining 153s
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

plcd1

Member
Joined
23 May 2015
Messages
788
Hang on a minute — there are plenty of spare 345s, under TfL's control, and both trains are Aventras so driver training wouldn't be wasted...

They have the DOO cameras too, so the only remaining question is — just how short can you form a 345 and still have it functional? :D

I note the smiley. The main issue is that NOTHING is allowed to impact on Crossrail so no one at TfL is going to come up with an idea that involves faffing around with the 345 fleet. That fleet is hardly reliable and shortening units to a length not envisaged for this fleet would probably require software changes using the self same resources that are already stretched to breaking point in debugging the normal length 345s and trying to get the 710s to an operable state. Others have mentioned money, contracts, logistics etc. In short it's a "NO".
 

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
Easy solution.

Reduce the 6 car 172 Snow Hill workings to 5 car and the 4 car workings to 3 car.

Use all but two 172s that have been taken out of the equation on Snow Hill and use them on the Birmingham to Hereford via Bromsgrove, releasing a couple of 170s. The remaining two use on Bedworth/Kenilworth services.

The released 170s could then go on Chase/Shrewsbury journeys with the 150s going to do Bedford services as a temporary measure.

That would then release the remaining 153s

Why should the people of the Midlands have to suffer because of Bombardier's inability to deliver to TfL?
 

HLE

Established Member
Joined
27 Dec 2013
Messages
1,421
Easy solution.

Reduce the 6 car 172 Snow Hill workings to 5 car and the 4 car workings to 3 car.

Use all but two 172s that have been taken out of the equation on Snow Hill and use them on the Birmingham to Hereford via Bromsgrove, releasing a couple of 170s. The remaining two use on Bedworth/Kenilworth services.

The released 170s could then go on Chase/Shrewsbury journeys with the 150s going to do Bedford services as a temporary measure.

That would then release the remaining 153s

Except it isn’t. All Coventry crew that sign Nuneaton/Leamington branches would need training up on 170’s....for a month or two max maybe?

Non starter.
 

bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,528
Except it isn’t. All Coventry crew that sign Nuneaton/Leamington branches would need training up on 170’s....for a month or two max maybe?

Non starter.

If you read my post, you'll see I said "Use all but two 172s that have been taken out of the equation on Snow Hill and use them on the Birmingham to Hereford via Bromsgrove, releasing a couple of 170s. The remaining two use on Bedworth/Kenilworth services."

Those two units being the two remaining 172s that are left out of snow hill duties and don't replace the 170s on Hereford.

Why should the people of the Midlands have to suffer because of Bombardier's inability to deliver to TfL?

Because we're used to being screwed over by the combined authority when it comes to public transport.

See the constant delays/budget overruns to the metro, NXs bus reviews, LM and their constant problem of staff in the early portion of their franchise, the chase line electric overrun and the fact we are neither in the north or LSE areas.
 

BlyRF

Member
Joined
30 Jul 2018
Messages
57
Anyway, getting back to the focus of the Class 710 Delivery, have there been any more deliveries or testing of the units of late?
 

theking

Member
Joined
30 Sep 2011
Messages
626
Hang on a minute — there are plenty of spare 345s, under TfL's control, and both trains are Aventras so driver training wouldn't be wasted...

They have the DOO cameras too, so the only remaining question is — just how short can you form a 345 and still have it functional? :D


345's don't have doo cameras.

And if they were reliable they would be up and down Lst to Shenfield rather than sitting in Ilford depot.

Pipe dream any other stock going on the goblin.

If the 172's go it will be 710's or buses whether user groups or the like are vocal doesn't mean two hoots.
 

dp21

Member
Joined
10 May 2017
Messages
358
Anyway, getting back to the focus of the Class 710 Delivery, have there been any more deliveries or testing of the units of late?

Ah here's one I can answer.

In short, no.

The Derby blockade means nothing can really come or go from the site.
 

BlyRF

Member
Joined
30 Jul 2018
Messages
57
Ah here's one I can answer.

In short, no.

The Derby blockade means nothing can really come or go from the site.

It’s true, there is a massive resignalling work going on till October which brings to light TFL’s so called launch date.
https://www.networkrail.co.uk/runni...ovement-programme/derby-resignalling-project/

To have this line block delay plus software rectification, delivery, acceptance by NR, ORR?, line testing and driver training. It’s really a depressing state of affaires.
 

plcd1

Member
Joined
23 May 2015
Messages
788
Ah here's one I can answer.

In short, no.

The Derby blockade means nothing can really come or go from the site.

Ah that's one issue I hadn't thought of. That might explain the recent dash to move 6 710s to Willesden (an earlier post in this thread has the numbers). Also explains why Old Oak Common has a decent number of 345s in it.
 
Joined
16 Dec 2017
Messages
182
If they can't come by rail and are needed (assuming they've been cleared), then presumably they'll just have to come by road?
 

Cosmicismsx

Member
Joined
12 Dec 2016
Messages
22
Ah here's one I can answer.

In short, no.

The Derby blockade means nothing can really come or go from the site.

This is not entirely true, there are diversionary routes once the line into the Works is open.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,234
The Derby blockage is a good excuse :E

"We have all the trains you want, and the software works perfectly. Sadly we can't deliver them yet..."
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
Easy solution.

Reduce the 6 car 172 Snow Hill workings to 5 car and the 4 car workings to 3 car.

Use all but two 172s that have been taken out of the equation on Snow Hill and use them on the Birmingham to Hereford via Bromsgrove, releasing a couple of 170s. The remaining two use on Bedworth/Kenilworth services.

The released 170s could then go on Chase/Shrewsbury journeys with the 150s going to do Bedford services as a temporary measure.

That would then release the remaining 153s
Crazy idea.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,240
Can they not be transported by road?
And how many low loaders?

Bombardier Derby is on its fortnight summer shut down isn't it? So an ideal time to not have the rail access as no extra units will be completed so no pressure added to get more out...
 

HLE

Established Member
Joined
27 Dec 2013
Messages
1,421
If you read my post, you'll see I said "Use all but two 172s that have been taken out of the equation on Snow Hill and use them on the Birmingham to Hereford via Bromsgrove, releasing a couple of 170s. The remaining two use on Bedworth/Kenilworth services."

Those two units being the two remaining 172s that are left out of snow hill duties and don't replace the 170s on Hereford.



Because we're used to being screwed over by the combined authority when it comes to public transport.

See the constant delays/budget overruns to the metro, NXs bus reviews, LM and their constant problem of staff in the early portion of their franchise, the chase line electric overrun and the fact we are neither in the north or LSE areas.

Still a non starter. You’d then have to send drivers on a day course once the LO units arrive as the cab layout is different.
May only be a day per man but that’s a lot of cover to find in what would be a short space of time
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,237
And how many low loaders?

Bombardier Derby is on its fortnight summer shut down isn't it? So an ideal time to not have the rail access as no extra units will be completed so no pressure added to get more out...
Depends if it’s a production line shutdown or the entire site is shutdown. We don’t really know do we? In any case there are reported (post #532) to have been far more 710s completed, and already stored on site that could be delivered.
 

Skymonster

Established Member
Joined
7 Feb 2012
Messages
2,060
I drove round the outside of the site early in the week. There are still workers present, even if some are on a fortnight summer leave. There are 710 cars all over the site, mainly singles rather than formed into full units. Hardly any of them have cabside or individual carriage numbers on them and only 710258 and 710260 were obviously identifiable, A cursory look suggests to me there must be enough for getting on for 15-20 units outside the works at the moment.
 

BlyRF

Member
Joined
30 Jul 2018
Messages
57
Depends if it’s a production line shutdown or the entire site is shutdown. We don’t really know do we? In any case there are reported (post #532) to have been far more 710s completed, and already stored on site that could be delivered.
There's actually reported to be quite a lot of units finished production and ready to be rolled out (roughly 26 full trains completed so far). Just a matter of getting a steady flow of them out to the relative depots through a reliable diversionary route or road transport while the derby works are in place.

The only delay issue still remains is whenever they managed to patch up the TCMS software issue and planning for driver testing along with general acceptance by NR and ORR.
 

Skymonster

Established Member
Joined
7 Feb 2012
Messages
2,060
In addition to my comment at reply 563 above, there's obviously still testing going on at Bombardier - as I passed this afternoon one of the 710s was running up and down the electrified test track inside the works.
 

BlyRF

Member
Joined
30 Jul 2018
Messages
57
Is there been anymore recent news on the Software testing of this train or any more deliveries been brought to the depot despite the NR works at Derby?
 

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,130
Location
Atherton, UK
Hang on a minute — there are plenty of spare 345s, under TfL's control, and both trains are Aventras so driver training wouldn't be wasted...

They have the DOO cameras too, so the only remaining question is — just how short can you form a 345 and still have it functional? :D
345s don't have DOO Cameras - part of the delay in 710s is writing software for the bodyside cameras.
 

dmncf

Member
Joined
4 Sep 2012
Messages
520
Yesterday the two units were in an electrified part of Willesden Junction Depot adjacent to the WCML.
 